Pages that link to "Item:Q2463320"
Jump to navigation
Jump to search
The following pages link to Integrated Transport - HU - ERDF/CF (Q2463320):
Displayed 50 items.
- NFM Közlekedési Operatív Programokért Felelős Helyettes Államtitkárság (Q2525852) (← links)
- Road M0 North Sector Highway 11 — Preparation of the section between main road 10 (Q3942923) (← links)
- M1 motorway, Lajta axle weight measurement twin station construction (Q3942924) (← links)
- M30 motorway implementation of Miskolc-Tornyosnémet project (Q3942925) (← links)
- M30 Implementation of the border of Tornyosnémeti (Q3942926) (← links)
- M34 express road Vásárosnamény — preparation of the section between Záhony (Q3942927) (← links)
- Planning and construction of the section between sections 23+ 900-29+ 700 km of section Várpalota No. 8 (Q3942928) (← links)
- Main road 8 Székesfehérvár Western bypass construction of Stage III — phased project (Q3942929) (← links)
- M86 express road Szeleste — Csorna section II implementation Hegyfalu — Csorna section between 105+ 800-139+ 165 km (Q3942930) (← links)
- M7 motorway Érd, Iparos road junction preparation and construction (Q3942931) (← links)
- M35 motorway No. 4 — Main road 481, main road 481 — Berettyóújfalu section and implementation of main road 481 (Q3942932) (← links)
- Road safety investments on the express road network — M3 motorway 19+ 500 km between 19+ 500-27+ 500 km. (Q3942933) (← links)
- Development of the operation and maintenance sites in the framework of the IKOP to improve transport safety, service quality and sustainability of the TEN-T road network (Q3942934) (← links)
- Implementation of main road no. 62 Szabadegyháza-industry bypass (Q3942935) (← links)
- Additional work on the M0 motorway (Q3942936) (← links)
- 8th main road Várpalota bypass Phase II Pétfürdő junction (between 29+ 700-33+ 100 km) (Q3942937) (← links)
- Construction of Axis Weight and Weight Measuring Station at the two-sided resting area in the 192 km section of the M7 motorway (Zalakomári rest) (Q3942938) (← links)
- M4 implementation of the section between Berettyóújfalu-Nagykereki (national border) (Q3942939) (← links)
- M9 Preparation of the section between Vasvár and Zalaegerszeg (with M75 node) (Q3942940) (← links)
- On the section of main road No 55 between Mórahalom bypass and the county boundary, reinforcement of the pavement to 115 kN axle load and completion of the construction work of a bicycle road parallel to the main road (Q3942941) (← links)
- Construction of the M7 motorway and the junction of the main road 710, with road connection No 710 (Q3942942) (← links)
- Implementation of the new M3 motorway junction for access to Mogyoród and Fót and the section between the junction and road 2101 j. (Q3942943) (← links)
- West sector M0, Preparation of the section between main road 10 — motorway M1 (Q3942944) (← links)
- Implementation of the M2 express road between Budapest and Vác (Q3942945) (← links)
- M6 Implementation of the section between Bóly-Ivándárda, border with Villány junction (Q3942946) (← links)
- Preparation of the development of the section of main road 86 between Szombathely and Egyházasrádóc into a 2x2 lane road (Q3942947) (← links)
- M8 road preparation and construction of Körmend-Rábafüzes, border section 2×1 lane (Q3942948) (← links)
- M0 Road Development and Reconstruction of the Southern Sector (Stage I) (without changing the structure of Ferenc Deák mederbridge) (Q3942949) (← links)
- ‘Custom family’ construction of a simple rest area combined with axle load and weight measurement stations and ‘Rábaköz’ complex resting place (Q3942950) (← links)
- Extension of the section between Letenye-Tornyiszentmiklós to 2x2 lane additional works (Q3942951) (← links)
- Construction of GYSEV central traffic management — phased project (Q3942952) (← links)
- Infrastructure and rolling stock maintenance software and IT application consolidation (Q3942953) (← links)
- Procurement of GSM-R system and related services (phased project) (Q3942954) (← links)
- Preparation for modernisation of the Southern Danube Bridge (Q3942955) (← links)
- Preparation of the junction of Budapest Liszt Ferenc International Airport (Q3942956) (← links)
- Preparation of bottlenecks over MÁV’s network (Q3942957) (← links)
- Modernisation of the Szombathely-Zalaszentiván railway line (Q3942958) (← links)
- Székesfehérvár — Reconstruction of the Keszthely railway line Phase 2, Szántód-Kőröshegy — Balatonszentgyörgy line reconstruction (Q3942959) (← links)
- Deployment of the GSM-R telecommunications network phase 2 (Q3942960) (← links)
- Purchase of GYSEV trains (Q3942961) (← links)
- Budapest-Lőkösháza III/1 execution; Békéscsaba station track construction and Gyoma (excl.)-Békéscsaba (bez.) line section construction of new electronic interlocking equipment, Ferencváros “C” branch — Lőkösháza ETCS 2 installation (Q3942962) (← links)
- Budapest Kelenföld — reconstruction of the Székesfehérvár railway line 1/3: Reconstruction of the railway node Székesfehérvár (Q3942963) (← links)
- Budapest-Ferencváros “C” branch — Székesfehérvár railway line ETCS 2 installation (Q3942964) (← links)
- Bajánsenye-Boba railway line ETCS 2 installation implementation_x000D_ (Q3942965) (← links)
- Station development and integrated customer service development programme (government windows) (Q3942966) (← links)
- Sopron-Szombathely-Szentgotthárd ETCS2 train control system (Q3942967) (← links)
- Road safety projects of MÁV Zrt. — phased project (Q3942968) (← links)
- Bridge Reconstruction Program Phase I (Q3942969) (← links)
- Development of infrastructure at Győr-Gönyű National Public Port (Q3942970) (← links)
- Development of rail traction energy supply on the network of MÁV Zrt. (Q3942971) (← links)