Pages that link to "Item:Q2463420"
Jump to navigation
Jump to search
The following pages link to Infrastructure and Environment - PL - ERDF/CF (Q2463420):
Displayed 50 items.
- Expansion of the municipal heating plant in Łomża with a water boiler with a capacity of 12.5 MW, using biomass as a fuel (Q84395) (← links)
- Construction of a biomass-fired heating plant with a capacity of 17 MW (5 MW + 12 MW) in Biała Podlaska (Q84396) (← links)
- Increase the production of renewable energy in MPEC Sp. z o.o. in Olsztyn by building biomass installations (Q84397) (← links)
- Construction of a heat and cold geothermal heat and cooling district facilities of the Banya tourist complex with pipelines and equipment for the distribution of heat and cooling (Q84398) (← links)
- Construction of a geothermal heat plant in Toruń, using existing holes TG-1 and TG-2 (Q84399) (← links)
- Construction of geothermal wells in Stargard (Q84400) (← links)
- Modernisation of the Nidzicy district heating system – construction of an urban boiler room based on the production of heat from biomass combustion (Q84401) (← links)
- Expansion of the geothermal system to increase the power of renewable heat source for PEC Geotermia Podhalańska S.A. (Q84402) (← links)
- Construction of a biomass boiler with a nominal capacity of 7 MW (Q84403) (← links)
- “Construction of a biomass boiler in”Łężańska“CHP Plant in Krosno” (Q84404) (← links)
- Modernisation of the heating system Department – construction of a heating plant based on the production of heat from the combustion of biomass (Q84405) (← links)
- Construction of biomass combustion plant in PEC in Suwałki (Q84406) (← links)
- Modernisation of the Municipal Heat Plant in Zambrow for the use of biomass (Q84407) (← links)
- Construction of the 110 kV line to Korczowa station and station 110/15 kV Korczowa to connect customers and renewable energy sources from the border area of Korczów border crossing point. (Q84408) (← links)
- Construction of the Bydgoszcz West – Piła Krzewina line with the extension of the station in this line (Q84409) (← links)
- Construction of Choszczno II and Rhine stations to enable the development of renewable energy (Q84410) (← links)
- Construction of the Gdańsk Przyjaźń-Jewowo Kierzkowo-Słupsk line with the construction of the station in this line (Q84411) (← links)
- Reconstruction of the overhead line 110 kV Sieradz – Jawor – Błaszki to connect renewable energy sources in the area of the Sieradz County in the Łódź region. (Q84412) (← links)
- Conversion of 110/15 kV Nidzica station to enable the development of renewable energy (Q84413) (← links)
- Construction of 110/15 kV Skwierzyna II station to enable the development of renewable energy (Q84414) (← links)
- Construction of overhead line 110 kV (16 km) Piła Krzewina – Town Krajeńskie together with reconstruction of station 110/15 kV Krajeńskie town in order to enable the development of renewable energy in western Poland (Q84415) (← links)
- Conversion of 110/15 kV Kleczew station to enable the development of renewable energy (Q84416) (← links)
- Construction of GPO 20/110 kV together with 110 kV distribution network to connect 28 MW RES generation units in the commune Bogatynia (Q84417) (← links)
- Conversion of 110/15 kV Wronki station to enable the development of renewable energy (Q84418) (← links)
- Reconstruction of 110/15 kV Thundering station to enable the development of renewable energy (Q84419) (← links)
- Reconstruction of 110/15 kV Bojanowo station to enable the development of renewable energy (Q84420) (← links)
- Reconstruction of the power supply system 110/6k V marked as E1 (d. 1/86) and E2 (c.1/26) to attach a 11.8 MW RES energy unit (Q84421) (← links)
- Construction of 110/15 kV Suchy Forest station to enable the development of renewable energy in western Poland (Q84422) (← links)
- Construction of 110/15 kV Kostrzyn II station to enable the development of renewable energy (Q84423) (← links)
- Construction of 110/15 kV Szczepankowo station to enable the development of renewable energy in western Poland (Q84424) (← links)
- Construction of the Mikułowa-Black line with the extension/upgrading of the station in this line (Q84425) (← links)
- Reconstruction of the 110 kV line between Poniatowa and Nałęczów in order to enable the development of renewable energy. (Q84426) (← links)
- Construction of the Black-Pasikurowice line with the extension of the station in this line (Q84427) (← links)
- Reconstruction of GPZ Budzyń (Q84428) (← links)
- Construction of line 110 kV Nowy Żmigród-Iwonicz to enable the development of renewable energy in the southern part of Podkarpackie voivodship (Q84429) (← links)
- Thermal modernisation of the building of the vehicle control station and the administrative building of Kaliskie Bus Lines sp. z o.o. in Kalisz (Q84430) (← links)
- Improving energy efficiency in NM Polska Sp. z o.o. in Namysłów by modernising lighting (Q84431) (← links)
- Comprehensive energy modernisation of buildings belonging to the Municipal Przedsiębiorstwa Komunikacji Sp. z o.o. in Kielce (Q84432) (← links)
- Improvement of energy efficiency at NB Polska Sp. z o.o. in Gniezno ul. Solar 29 by modernising lighting (Q84433) (← links)
- Improvement of energy efficiency at NB Polska Sp. z o.o. in Gniezno ul. Railway 7 through the modernisation of lighting (Q84434) (← links)
- Deep thermal modernisation of the office building in Poznań (Q84435) (← links)
- Modernisation of parking space lighting STS Automotive Sp. z o. o. (Q84436) (← links)
- Thermal modernisation of industrial hall buildings at ul. Factory 10 in Wrocław (Q84437) (← links)
- Modernisation of CLIP V warehouse lighting in Jasin (Q84438) (← links)
- Modernisation of the 35B63 network water pump system in PGE GiEK S.A. Branch of Elektrociepłownia Kielce (Q84439) (← links)
- Improving energy efficiency in JSW KOKS S.A. (Q84440) (← links)
- Improving the energy efficiency of electricity and heat generation through modernisation of cooling water pumps in Enea Połaniec S.A. (Q84441) (← links)
- Improving the energy efficiency of buildings of the company Zakłady Naprawcze Taboru Kolejowego Mińsk Mazowiecki S.A. by replacing luminaires with accessories for energy efficient and implementation of intelligent lighting control systems (Q84442) (← links)
- Improving energy efficiency by replacing lighting with energy-efficient LEDs in Kraków Airport car parks (Q84443) (← links)
- Thermomodernisation of thermal power generation technologies for bituminous masses and asphalt emulsions (Q84444) (← links)