    0 references
    136,799,217.62 zloty
    0 references
    30,410,466.08 Euro
    13 January 2020
    0 references
    136,799,217.62 zloty
    0 references
    30,410,466.08 Euro
    13 January 2020
    0 references
    100.0 percent
    0 references
    1 January 2014
    0 references
    31 October 2023
    0 references
    POLSKIE SIECI ELEKTROENERGETYCZNE S.A
    0 references
    0 references
    0 references

    51°14'28.64"N, 16°20'37.28"E
    0 references

    51°26'29.47"N, 16°15'27.14"E
    0 references

    51°22'18.88"N, 17°2'59.35"E
    0 references

    51°2'35.23"N, 16°52'23.09"E
    0 references

    51°7'34.32"N, 16°37'47.93"E
    0 references
    W ramach projektu przewidziano budowę dwutorowej linii 400 kV Czarna-Pasikurowice o długości około 133 km torów prądowych (w tym budowa nowego odcinka dwutorowego linii - ok. 50 km, a modernizacja ok. 33 km) wraz z rozbudową stacji w tym ciągu liniowym. Planowana trasa przebiega przez obszar 10 gmin województwa dolnośląskiego (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie,Wisznia Mała, Długołęka). Stacja elektroenergetyczna 400/110 kV Pasikurowice zlokalizowana jest w sąsiedztwie wsi Pasikurowice (gmina Długołęka, powiat wrocławski, województwo dolnośląskie). (Polish)
    0 references
    The project envisages the construction of a two-track line of 400 kV Czarna-Pasikurowice with a length of about 133 km of current tracks (including the construction of a new section of the two-track line – approx. 50 km, and modernisation approx. 33 km) along with the expansion of the station in this line. The planned route runs through the area of 10 communes of Dolnośląskie Voivodeship (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Power station 400/110 kV Pasikurowice is located in the vicinity of the village Pasikurowice (Gmina Długołęka, Wrocław District, Dolnośląskie Voivodeship). (English)
    14 October 2020
    0.8736939737231246
    0 references
    Le projet prévoit la construction d’une ligne à deux voies 400 kV Czarna-Pasikurowice d’une longueur d’environ 133 km de voies actuelles (y compris la construction d’une nouvelle section de la ligne à deux voies — env. 50 km et modernisation env. 33 km) avec l’agrandissement de la gare sur cette ligne. L’itinéraire prévu traverse 10 communes de la voïvodie de Basse-Silésie (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). La centrale électrique 400/110 kV Pasikurowice est située à proximité du village de Pasikurowice (municipalité de Długołęka, district de wrocław, voïvodie Dolnośląskie). (French)
    30 November 2021
    0 references
    Das Projekt sieht den Bau einer zweigleisigen Linie 400 kV Czarna-Pasikurowice mit einer Länge von etwa 133 km Stromschienen vor (einschließlich des Baus eines neuen Abschnitts der zweigleisigen Strecke – ca. 50 km und Modernisierung ca. 33 km) zusammen mit der Erweiterung des Bahnhofs in dieser Linie. Die geplante Route verläuft durch das Gebiet von 10 Gemeinden der Woiwodschaft Niederschlesien (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Das Kraftwerk 400/110 kV Pasikurowice befindet sich in der Nähe des Dorfes Pasikurowice (Gemeinde Długołęka, Bezirk wrocław, Woiwodschaft Dolnośląskie). (German)
    7 December 2021
    0 references
    Het project voorziet in de aanleg van een tweebaanslijn 400 kV Czarna-Pasikurowice met een lengte van ongeveer 133 km stroompaden (inclusief de bouw van een nieuw deel van de tweesporenlijn — ca. 50 km en modernisering ca. 33 km) samen met de uitbreiding van het station in deze lijn. De geplande route loopt door het gebied van 10 gemeenten van het Neder-Silezische woiwodschap (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). De centrale 400/110 kV Pasikurowice ligt in de buurt van het dorp Pasikurowice (gemeente Długołęka, district wrocław, Dolnośląskie Voivodeship). (Dutch)
    16 December 2021
    0 references
    Il progetto prevede la costruzione di una linea a due binari 400 kV Czarna-Pasikurowice con una lunghezza di circa 133 km di piste correnti (compresa la costruzione di una nuova sezione della linea a due binari — ca. 50 km e ammodernamento ca. 33 km) insieme all'espansione della stazione in questa linea. Il percorso previsto attraversa l'area di 10 comuni del Voivodato della Bassa Slesia (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). La centrale elettrica 400/110 kV Pasikurowice si trova nelle vicinanze del villaggio Pasikurowice (comune di Długołęka, distretto wrocław, Voivodato di Dolnośląskie). (Italian)
    16 January 2022
    0 references
    El proyecto prevé la construcción de una línea de dos vías 400 kV Czarna-Pasikurowice con una longitud de aproximadamente 133 km de vías actuales (incluida la construcción de una nueva sección de la línea de dos vías — aprox. 50 km y modernización aprox. 33 km) junto con la ampliación de la estación en esta línea. La ruta prevista pasa por la zona de 10 municipios del Voivodato de Baja Silesia (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). La central eléctrica 400/110 kV Pasikurowice se encuentra en las inmediaciones del pueblo Pasikurowice (municipio de Długołęka, distrito de wrocław, Voivodato Dolnośląskie). (Spanish)
    19 January 2022
    0 references
    Projektet forudser opførelse af en tosporet linje 400 kV Czarna-Pasikurowice med en længde på ca. 133 km strømspor (herunder opførelse af en ny sektion af tosporslinjen — ca. 50 km og modernisering ca. 33 km) sammen med udvidelsen af stationen i denne linje. Den planlagte rute løber gennem 10 kommuner i Lower Silesian Voivodeship (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Kraftværket 400/110 kV Pasikurowice ligger i nærheden af landsbyen Pasikurowice (kommunen Długołęka, wrocław-distriktet, Dolnośląskie Voivodeship). (Danish)
    26 July 2022
    0 references
    Το έργο προβλέπει την κατασκευή μιας γραμμής δύο γραμμών 400 kV Czarna-Pasikurowice με μήκος περίπου 133 km των τρεχόντων τροχιών (συμπεριλαμβανομένης της κατασκευής ενός νέου τμήματος της γραμμής δύο γραμμών — περίπου. 50 χλμ. και εκσυγχρονισμός περίπου. 33 χλμ.) μαζί με την επέκταση του σταθμού σε αυτή τη γραμμή. Η σχεδιαζόμενη διαδρομή διέρχεται από την περιοχή 10 δήμων του βοεβοδάτου της Κάτω Σιλεσίας (Lubin, Šcinawa, Prochowice, Ruja, Malczyce, roda рląska, Miękinia, Oborniki рląskie, Wisznia Mała, Długołęka). Ο σταθμός ηλεκτροπαραγωγής 400/110 kV Pasikurowice βρίσκεται κοντά στο χωριό Pasikurowice (δήμος Długołęka, περιοχή wrocław, Dolnośląskie Voivodeship). (Greek)
    26 July 2022
    0 references
    Projektom se predviđa izgradnja dvokolosiječne linije 400 kV Czarna-Pasikurowice duljine oko 133 km strujnih kolosijeka (uključujući izgradnju nove dionice dvokolosiječne pruge – cca. 50 km i modernizacija cca. 33 km) uz proširenje stanice u ovoj liniji. Planirana ruta prolazi kroz područje 10 općina Donje Silezije (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Elektrana 400/110 kV Pasikurowice nalazi se u blizini sela Pasikurowice (općina Długołęka, okrug wrocław, Dolnośląskie vojvodstvo). (Croatian)
    26 July 2022
    0 references
    Proiectul prevede construirea unei linii cu două linii 400 kV Czarna-Pasikurowice cu o lungime de aproximativ 133 km de linii curente (inclusiv construirea unei noi secțiuni a liniei cu două linii – aprox. 50 km și modernizare aprox. 33 km) împreună cu extinderea stației în această linie. Traseul planificat traversează zona a 10 comune din Voievodatul Silezia Inferioară (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Centrala electrică 400/110 kV Pasikurowice este situată în vecinătatea satului Pasikurowice (municipatul Długołęka, districtul wrocław, Voievodatul Dolnośląskie). (Romanian)
    26 July 2022
    0 references
    Projekt predpokladá výstavbu dvojkoľajovej trate 400 kV Czarna-Pasikurowice s dĺžkou približne 133 km súčasných tratí (vrátane výstavby nového úseku dvojkoľajnej trate – cca. 50 km a modernizácia cca. 33 km) spolu s rozšírením stanice v tejto linke. Plánovaná trasa vedie cez oblasť 10 obcí Dolného Sliezskeho vojvodstva (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Elektráreň 400/110 kV Pasikurowice sa nachádza v blízkosti obce Pasikurowice (obec Długołęka, okres wrocław, Dolnośląskie vojvodstvo). (Slovak)
    26 July 2022
    0 references
    Il-proġett jipprevedi l-kostruzzjoni ta’ linja b’żewġ linji 400 kV Czarna-Pasikurowice b’tul ta’ madwar 133 km ta’ linji kurrenti (inkluż il-kostruzzjoni ta’ sezzjoni ġdida tal-linja b’żewġ linji — madwar. 50 km u modernizzazzjoni madwar. 33 km) flimkien mal-espansjoni tal-istazzjon f’din il-linja. Ir-rotta ppjanata tgħaddi miż-żona ta’ 10 muniċipalitajiet ta’ Lower Silesian Voivodeship (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). L-impjant tal-enerġija 400/110 kV Pasikurowice jinsab fil-viċinanza tar-raħal ta’ Pasikurowice (muniċipalità ta’ Długołęka, distrett ta’ wrocław, Dolnośląskie Voivodeship). (Maltese)
    26 July 2022
    0 references
    O projeto prevê a construção de uma linha de duas vias de 400 kV Czarna-Pasikurowice com um comprimento de cerca de 133 km de vias atuais (incluindo a construção de um novo troço da linha de duas vias — aprox. 50 km e a modernização aprox. 33 km), juntamente com a expansão da estação nesta linha. A rota planeada atravessa a área de 10 municípios da voivodia de Dolnośląskie (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). A central elétrica 400/110 kV Pasikurowice situa-se nas imediações da aldeia de Pasikurowice (Gmina Długołęka, distrito de Wrocław, voivodia de Dolnośląskie). (Portuguese)
    26 July 2022
    0 references
    Hankkeessa suunnitellaan kaksiraiteisen 400 kV:n Czarna-Pasikurowice-ratalinjan rakentamista, jonka pituus on noin 133 kilometriä. 50 km ja modernisointi noin. 33 km) sekä aseman laajentaminen tällä linjalla. Suunniteltu reitti kulkee kymmenessä Ala-Sleesian voivodikunnan kunnassa (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Voimalaitos 400/110 kV Pasikurowice sijaitsee Pasikurowicen kylän läheisyydessä (Długołękan kunta, wrocławin piirikunta, Dolnośląskie Voivodeship). (Finnish)
    26 July 2022
    0 references
    Projekt predvideva gradnjo dvotirne proge 400 kV Czarna-Pasikurowice z dolžino približno 133 km tekočih tirnic (vključno z gradnjo novega odseka dvotirne proge – pribl. 50 km in posodobitev pribl. 33 km) skupaj s širitvijo postaje v tej liniji. Načrtovana pot poteka skozi območje 10 občin Spodnje Šlezije (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Elektrarna 400/110 kV Pasikurowice se nahaja v bližini vasi Pasikurowice (občina Długołęka, okrožje wrocław, Dolnośląskie Voivodeship). (Slovenian)
    26 July 2022
    0 references
    Projekt předpokládá výstavbu dvoukolejné trati 400 kV Czarna-Pasikurowice s délkou asi 133 km současných tratí (včetně výstavby nového úseku dvoukolejné trati – cca 133 km). 50 km a modernizace cca. 33 km) spolu s rozšířením stanice v této lince. Plánovaná trasa vede přes území deseti obcí Dolního Slezského vojvodství (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Elektrárna 400/110 kV Pasikurowice se nachází v blízkosti obce Pasikurowice (obec Długołęka, wrocław, Dolnośląskie Voivodeship). (Czech)
    26 July 2022
    0 references
    Pagal projektą numatoma tiesti dviejų bėgių liniją 400 kV Czarna-Pasikurowice, kurios ilgis būtų apie 133 km (įskaitant naujos dviejų bėgių linijos atkarpos tiesimą – apytiksliai. 50 km ir modernizavimas. 33 km) kartu su stoties plėtra šioje linijoje. Planuojamas maršrutas eina per 10 Žemutinės Silezijos vaivadijos savivaldybių (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Elektrinė 400/110 kV Pasikurowice yra netoli Pasikurowice kaimo (Długołęka savivaldybė, wrocław rajonas, Dolnośląskie Voivodeship). (Lithuanian)
    26 July 2022
    0 references
    Projekts paredz divu sliežu ceļu līnijas 400 kV Czarna-Pasikurowice izbūvi aptuveni 133 km garumā (ieskaitot jauna divsliežu līnijas posma būvniecību — apm. 50 km un modernizācija apm. 33 km) kopā ar stacijas paplašināšanu šajā līnijā. Plānotais maršruts šķērso 10 Lejassilēzijas vojevodistes pašvaldību teritoriju (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Spēkstacija 400/110 kV Pasikurowice atrodas Pasikurowice ciemata tuvumā (Długołęka pašvaldība, wrocław rajons, Dolnośląskie Voivodeship). (Latvian)
    26 July 2022
    0 references
    Проектът предвижда изграждането на двупистова линия 400 kV Czarna-Pasikurowice с дължина около 133 км текущи коловози (включително изграждане на нов участък от двупистната линия — прибл. 50 км и модернизация прибл. 33 км) заедно с разширяването на станцията в тази линия. Планираният маршрут минава през района на 10 общини от долното силезийско войводство (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Електроцентралата 400/110 kV Pasikurowice се намира в близост до село Pasikurowice (община Długołęka, област Wrocław, Dolnośląskie Voivodeship). (Bulgarian)
    26 July 2022
    0 references
    A projekt egy 400 kV-os Czarna-Pasikurowice kétvágányú vonal építését irányozza elő, amelynek hossza körülbelül 133 km hosszú (beleértve a kétvágányú vonal új szakaszának megépítését is – kb. 50 km és korszerűsítés kb. 33 km) valamint az állomás bővítése ezen a vonalon. A tervezett útvonal 10 alsó-sziléziai vajdaság (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka) területén halad át. A 400/110 kV Pasikurowice erőmű Pasikurowice falu közelében található (Długołęka település, wrocław kerület, Dolnośląskie vajdaság). (Hungarian)
    26 July 2022
    0 references
    Foráiltear sa tionscadal go dtógfar líne dhá rian 400 kV Czarna-Pasikurowice le fad thart ar 133 km de rianta reatha (lena n-áirítear cuid nua den líne dhá rian — thart ar. 50 km agus nuachóiriú thart ar. 33 km) chomh maith le leathnú an stáisiúin sa líne seo. Téann an bealach atá beartaithe trí limistéar 10 mbardasacht na Voivodeship Silesian Íochtarach (Lubin, Δcinawa, Prochowice, Ruja, Malczyce, Δroda Δl Δl ţkinia, Miękinia, Oborniki Δlţskie, Wisznia Mała, Długołęka). Tá an stáisiún cumhachta 400/110 kV Pasikurowice suite i gcomharsanacht an tsráidbhaile Pasikurowice (bardas Długołęka, dúiche wrocław, Dolnoślõskie Voivodeship). (Irish)
    26 July 2022
    0 references
    Projektet förutser byggandet av en tvåspårig linje 400 kV Czarna-Pasikurowice med en längd på cirka 133 km strömspår (inklusive byggandet av en ny sektion av tvåspårslinjen – ca. 50 km och modernisering ca. 33 km) tillsammans med utbyggnaden av stationen i denna linje. Den planerade rutten går genom området med tio kommuner i Nedre Schlesiens vojvodskap (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Kraftverket 400/110 kV Pasikurowice ligger i närheten av byn Pasikurowice (kommunen Długołęka, distriktet wrocław, Dolnośląskie Voivodeship). (Swedish)
    26 July 2022
    0 references
    Projektiga nähakse ette kaherajalise liini 400 kV Czarna-Pasikurowice ehitamine, mille pikkus on umbes 133 km praegustest rööbasteedest (sealhulgas kahe rööbastee uue lõigu ehitamine – u. 50 km ja moderniseerimine u. 33 km) koos jaama laiendamisega sellel liinil. Kavandatud marsruut kulgeb läbi Alam-Sileesia vojevoodkonna 10 kommuuni (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki Śląskie, Wisznia Mała, Długołęka). Elektrijaam 400/110 kV Pasikurowice asub Pasikurowice küla lähedal (Długołęka omavalitsusüksus, wrocławi piirkond, Dolnośląskie vojevoodkond). (Estonian)
    26 July 2022
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: legnicki
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: lubiński
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: trzebnicki
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: wrocławski
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: średzki
    0 references
    13 December 2023