Installation and grid connection of a normal charging station with two normal charging points (11 kW and 22 kw) as a public charging station (Q7285519)
Jump to navigation
Jump to search
Project GENERATED-ID-2014DE16RFOP004-2024-2-9-180720 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation and grid connection of a normal charging station with two normal charging points (11 kW and 22 kw) as a public charging station |
Project GENERATED-ID-2014DE16RFOP004-2024-2-9-180720 in Germany |
Statements
15,486.9 Euro
0 references
1 December 2019
0 references
14 July 2021
0 references
Autohaus Ruprecht GmbH
0 references
16 February 2024
0 references
Guben
0 references
Identifiers
GENERATED-ID-2014DE16RFOP004-2024-2-9-180720
0 references