Pages that link to "Item:Q6712653"
Jump to navigation
Jump to search
The following pages link to Sostegno agli investimenti per l efficienza energetica e l utilizzo delle fonti di energia rinnovabile - Avviso 2017 (Q6712653):
Displayed 20 items.
- PLANTING OF FTV AND REPLACEMENT OF LED LIGHTING (Q2071792) (← links)
- REPLACEMENT OF EXISTING, EXTERNAL AND INTERNAL ILLUMINATING BODIES WITH NEW LAMPS IN LINE WITH LED AND REPLACEMENT COMPRESSORS WITH NEW COMPRESSORS (Q2071793) (← links)
- REDUCTION OF ENERGY CONSUMPTION THROUGH THE INSTALLATION OF PV INSTALLATIONS AND REPLACEMENT OF TRADITIONAL, NEW LED LUMINAIRES (Q2071794) (← links)
- INSTALLATION OF A PHOTOVOLTAIC INSTALLATION ON 199,92 KWP RATED POWER COVERAGE ON THE SPOT. REPLACEMENT OF EXISTING INTERNAL LIGHTING WITH LED LUMINAIRES (Q2071795) (← links)
- PRODUCTION OF A PHOTOVOLTAIC POWER PLANT OF 80.64 KW CONNECTED TO THE ELECTRICITY DISTRIBUTION SYSTEM. WITH THE IMPLEMENTATION OF THIS ZONE, WHICH HAS BEEN OFFICIALLY DESIGNATED AS BEING SAID TO BE KNOWN AS: (Q2071798) (← links)
- INSTALLATION OF A PHOTOVOLTAIC INSTALLATION OF 69,3 KWP FOR COVERAGE AND REPLACEMENT OF THE LIGHTING INSTALLATION WITH LED LAMPS. (Q2071799) (← links)
- INSTALLATION OF PHOTOVOLTAIC EQUIPMENT WITH A POWER OUTPUT OF 121 KW (Q2071800) (← links)
- INSTALLATION OF PV EQUIPMENT ON RATED POWER COVERAGE 72,60 KWP UNDER THE ON-SITE EXCHANGE SYSTEM. REPLACEMENT OF EXISTING INTERNAL LIGHTING WITH LED LUMINAIRES. (Q2071801) (← links)
- SELF-PRODUCTION OF ELECTRICITY (PHOTOVOLTAIC); LED INSTALLATION; INTERVENTION ON BUILDING ENVELOPE (COVERING) THROUGH ASBESTOS REMOVAL AND INSTALLATION OF NEW INSULATING MATERIAL. (Q4279772) (← links)
- INTERVENTION TO MODIFY AND IMPROVE ENERGY EFFICIENCY AT THE PRODUCTION PLANT (Q4279774) (← links)
- REDUCTION OF ELECTRICAL CONSUMPTION BY REPLACING THE CURRENT INTERNAL AND EXTERNAL LUMINAIRES WITH NEW LED TECHNOLOGY (Q4279776) (← links)
- REPLACEMENT OF TRADITIONAL LIGHTING SYSTEMS WHICH ARE POORLY EFFICIENT; REPLACEMENT OF SUPPLY SYSTEMS, CONTROL AND MANAGEMENT OF UV LAMPS OF PARQUET FINISHING DRYING TUNNELS. (Q4279778) (← links)
- THE INTERVENTION Â AIMED AT THE REPLACEMENT OF THE TRADITIONAL LUMINAIRES OF THE LIGHT TOWERS PRESENT IN THE EXTERNAL AREAS OF THE PLANT WITH NEW LED TECHNOLOGY (Q4279779) (← links)
- INTERVENTIONS TO REDUCE ELECTRICITY CONSUMPTION: LIGHTING CONCERNS PURCHASE AND INSTALLATION AT THE PRODUCTION UNIT C.D.F. OF SPECIAL STEELS TERNI S.P.A., OF NEW LIGHTING FIXTURES FOR INDOOR AND OUTDOOR LED TECHNOLOGY (Q4279781) (← links)
- REALISATION OF PHOTOVOLTAIC SYSTEM AND REPLACEMENT OF LIGHTING FIXTURES WITH NEW LED TECHNOLOGY (Q4279783) (← links)
- NEW LED LIGHTING SYSTEM (Q4279785) (← links)
- INSTALLATION FOR ENERGY EFFICIENCY IN MOLINI SPIGADORO SPA OF: TWO PHOTOVOLTAIC SYSTEMS WITH A POWER OF 300WP ON TWO SEPARATE BUILDINGS: BUILDING 1 N 66 PANELS 19,8KWP, BUILDING 2 N 264 PANELS 79,2KWP. (Q4279786) (← links)
- THE PROJECT INVOLVES THE REALISATION OF A PHOTOVOLTAIC SYSTEM ON THE ROOF, WITH A PEAK POWER OF 32.25 KW AND THE INSTALLATION OF NEW LIGHTING FIXTURES WITH LED TECHNOLOGY FOR THE REPLACEMENT OF FLUORESCENT LAMPS AND DISCHARGE PROJECTORS (Q4279788) (← links)
- REALISATION OF A SOLAR PHOTOVOLTAIC SYSTEM OF TOTAL POWER OF 315,5 KWP THAT WILL BE INSTALLED ON THE ROOFS OF TWO INDUSTRIAL BUILDINGS (Q4279789) (← links)
- INSTALLATION OF PHOTOVOLTAIC SYSTEM FOR THE PRODUCTION OF ELECTRICITY OF 150,0 KWP, UNDER EXCHANGE ON SITE, PLACED ON THE ROOF OF THE BUILDING; REPLACEMENT OF ORDINARY LIGHTING WITH LED LAMPS FOR A TOTAL OF 1.740,000 LUMENS (Q4279790) (← links)