Thermal modernisation of public buildings in Bukowiec commune. (Q98227)
Jump to navigation
Jump to search
Project Q98227 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings in Bukowiec commune. |
Project Q98227 in Poland |
Statements
1,913,354.69 zloty
0 references
2,829,339.76 zloty
0 references
67.63 percent
0 references
1 June 2014
0 references
13 September 2018
0 references
GMINA BUKOWIEC
0 references
Przedmiotem Projektu jest głęboka i kompleksowa termomodernizacja trzech budynków użyteczności publicznej na terenie Gminy Bukowiec w powiecie świeckim.Są to budynki:Urzędu Gminy w Bukowcu,Gimnazjum im. Jana Pawła II w Korytowie oraz Szkoły Podstawowej im. Ks. Jana Twardowskiego w Różannie.Głównym celem Projektu jest wzrost efektywności energetycznej budynków poprzez ich termomodernizację, przyczyniającą się do ograniczenia strat ciepła oraz redukcji emisji zanieczyszczeń do atmosfery. inwestycyjnych.W budynku UG w Bukowcu zaplanowano ocieplenie ścian oraz stropodachu, częściową wymianę stolarki okiennej i drzwiowej, montaż nawietrzaków w pozostałych oknach, gruntowną modernizację instalacji c.o. i c.w.u wraz z wymianą źródła ciepła na system pomp ciepła wraz z panelami fotowoltaicznymi.Budynek Gimnazjum będzie poddany ociepleniu ścian zewnętrznych oraz stropodachów, częściową wymianę stolarki okiennej i drzwiowej oraz montaż nawietrzaków w pozostałych oknach.Prace termomodernizacyjne w budynku Szkoły w Różannie będą obejmować ocieplenie ścian zewnętrznych wraz z ścianami fundamentowymi.Ponadto w przypadku każdego budynku realizowane będą prace towarzyszące, które są zazwyczaj niezbędnym uzupełnieniem prac termomodernizacyjnych, tj. wykonanie i malowanie elewacji budynków, obróbka ścian/parapetów przy wymianie stolarki okiennej i drzwiowej, ponowne wykonanie instalacji odgromowej, wykonanie obróbek blacharskich dachu oraz rynien, odtworzenie opaski utwardzenia wokół budynków.Są to koszty związane z odtworzeniem elementów budynku, które podlegają demontażowi lub rozbiórce na potrzebę wykonania izolacji cieplnej ścian, czy dachu budynku.W wyniku realizacji Projektu ograniczona zostaną straty energii pierwotnej na poziomie 1.172.139 kWh/rocznie oraz nastąpi spadek emisji gazów cieplarnianych o 160,29 ton równoważnika CO2. (Polish)
0 references
The subject of the Project is a deep and comprehensive thermal modernisation of three public buildings in the Bukowiec commune in the secular district.These are buildings:Gmina Office in Bucowiec, John Paul II Gymnasium in Korytów and the Primary School of Fr. The main purpose of the project is to increase the energy efficiency of buildings through their thermal modernisation, contributing to the reduction of heat loss and reduction of emissions of pollutants to the atmosphere.Investment.In the UG building in Bukovec will be planned to warm the walls and ceilings, partially replacement of the window and door stools, the installation of the vents in the other windows will include the internal interior of the installation of the c.o. and c.w. (English)
15 October 2020
0.7729347533797949
0 references
L’objet du projet est une thermo-modernisation profonde et complète de trois bâtiments publics dans la commune de Bukowiec dans un quartier laïque.Ils sont des bâtiments: le bureau municipal de Bukowc, le Jean-Paul II Gimnasjum à Korytów et le Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (French)
1 December 2021
0 references
Gegenstand des Projekts ist eine tiefgreifende und umfassende Thermomodernisierung von drei öffentlichen Gebäuden in der Gemeinde Bukowiec in einem säkularen Viertel.Das sind Gebäude: das Gemeindeamt in Bukowc, das Johannes Paul II. Gimnasjum in Korytów und das Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (German)
7 December 2021
0 references
Het onderwerp van het project is een diepe en uitgebreide thermo-modernisering van drie openbare gebouwen in de Bukowiec Commune in een seculiere wijk.Ze zijn gebouwen: het gemeentekantoor in Bukowc, de Johannes Paulus II Gimnasjum in Korytów en de Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Dutch)
17 December 2021
0 references
Oggetto del progetto è una profonda e completa termomodernizzazione di tre edifici pubblici nella Comune di Bukowiec in un distretto secolare.Si tratta di edifici: l'ufficio comunale di Bukowc, il Giovanni Paolo II Gimnasjum a Korytów e il p. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Italian)
16 January 2022
0 references
El tema del proyecto es una profunda y completa termo-modernización de tres edificios públicos en la Comuna de Bukowiec en un distrito secular. Son edificios: la Oficina Municipal de Bukowc, el Juan Pablo II Gimnasjum en Korytów y el Padre. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Spanish)
20 January 2022
0 references
Emnet for projektet er en dyb og omfattende termomodernisering af tre offentlige bygninger i Bukowiec Kommune i et verdsligt distrikt.De er bygninger: Kommunekontoret i Bukowc, John Paul II Gimnasjum i Korytów og Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Danish)
26 July 2022
0 references
Το αντικείμενο του έργου είναι ένας βαθύς και ολοκληρωμένος θερμο-εκσυγχρονισμός τριών δημόσιων κτιρίων στην κοινότητα Bukowiec σε μια κοσμική περιοχή.Είναι κτίρια: το γραφείο του δήμου στο Bukowc, το John Paul II Gimnasjum στο Korytów και το Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Greek)
26 July 2022
0 references
Predmet projekta je duboka i sveobuhvatna termomodernizacija triju javnih zgrada u općini Bukowiec u sekularnoj četvrti.To su zgrade: Općinski ured u Bukowcu, Ivan Pavao II. Gimnasjum u Korytówu i o. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Croatian)
26 July 2022
0 references
Subiectul proiectului este o termomodernizare profundă și cuprinzătoare a trei clădiri publice din comuna Bukowiec dintr-un district secular. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Romanian)
26 July 2022
0 references
Predmetom projektu je hlboká a komplexná termomodernizácia troch verejných budov v obci Bukowiec v sekulárnej štvrti.Sú to budovy: Mestský úrad v Bukowci, Ján Pavol II. Gimnasjum v Korytówe a Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Slovak)
26 July 2022
0 references
Is-suġġett tal-proġett huwa termomodernizzazzjoni profonda u komprensiva ta’ tliet binjiet pubbliċi fil-Komun ta’ Bukowiec f’distrett sekulari. Dawn huma binjiet: l-Uffiċċju tal-Muniċipalità f’Bukowc, il-Gimnasjum Ġwanni Pawlu II f’Korytów u l-Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Maltese)
26 July 2022
0 references
O tema do projeto é uma modernização térmica profunda e abrangente de três edifícios públicos na comuna de Bukowiec no distrito secular.Estes são edifícios:Gmina Office em Bucowiec, Ginásio João Paulo II em Korytów e a Escola Primária do Pe. O principal objectivo do projecto é aumentar a eficiência energética dos edifícios através da sua modernização térmica, contribuindo para a redução da perda de calor e redução das emissões de poluentes para a atmosfera.Investimento.No edifício UG em Bukovec será planeado para aquecer as paredes e tectos, substituição parcial dos bancos das janelas e portas, a instalação das aberturas nas outras janelas incluirá o interior interno da instalação do c.o. e c.w. (Portuguese)
26 July 2022
0 references
Hankkeen aiheena on kolmen julkisen rakennuksen syvä ja kattava lämpömodernisointi Bukowiecin kunnassa maallisella alueella.Ne ovat rakennuksia: Bukowcin kunnanvirasto, Johannes Paavali II Gimnasjum Korytówissa ja Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Finnish)
26 July 2022
0 references
Predmet projekta je globoka in celovita termomodernizacija treh javnih stavb v občini Bukowiec v posvetnem okrožju.To so stavbe: občinski urad v Bukowcu, Janez Pavel II Gimnasjum v Korytówu in Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Slovenian)
26 July 2022
0 references
Předmětem projektu je hluboká a komplexní termo-modernizace tří veřejných budov v obci Bukowiec v sekulární čtvrti. Jedná se o budovy: obecní úřad v Bukowci, Jan Pavel II. Gimnasjum v Korytów a Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Czech)
26 July 2022
0 references
Projekto tema – gilus ir visapusiškas trijų viešųjų pastatų Bukowiec komunoje pasaulietiniame rajone modernizavimas.Jie yra pastatai: Bukowc savivaldybės biuras, Jono Pauliaus II Gimnasjumas Korytuve ir Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Lithuanian)
26 July 2022
0 references
Projekta priekšmets ir padziļināta un visaptveroša trīs sabiedrisko ēku termomodernizācija Bukowiec komūnā laicīgajā rajonā.Tie ir ēkas: pašvaldības birojs Bukowc, John Paul II Gimnasjum Korytów un Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Latvian)
26 July 2022
0 references
Предмет на проекта е дълбока и всеобхватна термомодернизация на три обществени сгради в комуна Буковик в светски район.Те са сгради: Общинската служба в Буков, Йоан Павел II Гимнасюм в Коритов и Фр. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Bulgarian)
26 July 2022
0 references
A projekt tárgya három középület mély és átfogó termomodernizálása a szekuláris kerület Bukowiec községében. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Hungarian)
26 July 2022
0 references
Is é ábhar an tionscadail ná nuachóiriú teirmeafosfáití domhain agus cuimsitheach ar thrí fhoirgneamh phoiblí sa Commune Bukowiec i gceantar secular.Is foirgnimh iad: Oifig an Bhardais i Bukowc, an John Paul II Gimnasjum i Korytów agus an tAthair. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Irish)
26 July 2022
0 references
Ämnet för projektet är en djup och omfattande termomodernisering av tre offentliga byggnader i Bukowiec kommun i ett sekulärt distrikt.De är byggnader: kommunkontoret i Bukowc, John Paul II Gimnasjum i Korytów och Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Swedish)
26 July 2022
0 references
Projekti teemaks on ilmalikus piirkonnas Bukowie kommuunis asuva kolme avaliku hoone sügav ja põhjalik termomoderniseerimine.Need on hooned: Bukowci linnavalitsus, John Paul II Gimnasjum Korytówis ja Fr. The main objective of the project is to increase the energy efficiency of buildings through their thermomodernisation, contributing to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere. investment.In the building of the UG in Bukovec, it is planned to warm the walls and rooftops, partial replacement of window and door joinery, installation of windmills in other windows, a thorough modernisation of the installation of c.o. and c.w.u., together with the replacement of the building’s interiors and the installation of the building’s interiors, as well as the installation of the installation of the building with the need to replace the building’s needs.The main purpose of the project is to increase the energy efficiency of buildings, to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.The installation of ventilation units in the building, the main purpose of the building, the modernisation of the installation of the buildings, the renovation of the building will be carried out with the installation of the windows and the windows, as well as the installation of the building’s, as well as the installation of the building’s premises, the main purpose of the construction of the building’s premises, the main purpose of the project is to increase the energy efficiency of buildings by means of their thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the construction of the building in Bukovec, it is planned to warm the walls and the rooftops, together with the replacement of the heating system for the heat pump system, together with the installation of the walls, the walls of the building will be replaced by the entrance to the building, the main purpose of the building will be to warm the building, as well as the ventilation of the building, as well as the installation of the windows and the windows, as well as the installation of the building’s as well as the installation of the building, the main purpose of the project is to increase the energy efficiency of buildings by thermomodernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, installation of ventilation units in other windows, a thorough modernisation of the installation of c.o. and c.w., together with the renovation of the building’s, as well as the renovation of the building’s, as well as the renovation of the building’s walls, the entrance to the building will be necessary to replace the building, as well as the renovation of the building’s, as well as the installation of the windows and the windows, as well as the installation of the building’s on-site, as well as the installation of the building’s/replacement.The main goal of the building will be to increase the energy efficiency of buildings, as well as to increase the energy efficiency of buildings through thermo-modernisation, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation units in the building, the major renovation of the buildings, the main renovation of the buildings, the renovation of the buildings will be carried out with the installation of the building, as well as the installation of the building’s/replacement.The building will be equipped with the installation of the building, the main purpose of the building is to increase the energy efficiency of buildings, their thermal modernisation of the buildings, which contribute to the reduction of heat losses and the reduction of pollutant emissions to the atmosphere.In the building, the installation of ventilation in the windows, a thorough renovation of the installation of c.o. (Estonian)
26 July 2022
0 references
WOJ.: KUJAWSKO-POMORSKIE, POW.: świecki
0 references
24 May 2023
0 references
Identifiers
RPKP.03.03.00-04-0051/16
0 references