Increase the potential of the power network ENEA Operator Sp. z o.o. in order to collect energy from renewable sources in the Kujawsko-Pomorskie Voivodship (Q98074)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q98074 in Poland
Language Label Description Also known as
English
Increase the potential of the power network ENEA Operator Sp. z o.o. in order to collect energy from renewable sources in the Kujawsko-Pomorskie Voivodship
Project Q98074 in Poland

    Statements

    0 references
    11,310,826.73 zloty
    0 references
    2,514,396.78 Euro
    13 January 2020
    0 references
    27,525,190.0 zloty
    0 references
    6,118,849.74 Euro
    13 January 2020
    0 references
    41.09 percent
    0 references
    18 May 2020
    0 references
    31 December 2023
    0 references
    ENEA OPERATOR SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°7'19.06"N, 18°0'0.90"E
    0 references

    53°11'31.78"N, 17°49'31.80"E
    0 references

    52°45'52.99"N, 18°19'27.73"E
    0 references

    53°5'41.42"N, 17°35'50.64"E
    0 references

    52°49'20.53"N, 17°41'26.45"E
    0 references
    Głównym celem projektu jest zwiększenie potencjału sieci energetycznej do odbioru energii z odnawialnych źródeł.Założenia projektu, zgodnie z przyjętą koncepcją, zostaną zrealizowane poprzez:• automatyzację sieci SN zasilanej z 3 stacji WN/SN wraz z przebudową 3 stacji elektroenergetycznych WN/SN, • przebudowę ok. 7,58 km sieci SN, • zabudowę 2 kompaktowych stacji SN/nn wraz z transformatorami z podobciążeniową regulacją napięcia.Inwestycja swoim zakresem obejmować będzie gminy z województwa kujawsko-pomorskiego wskazane w pkt B.4 wniosku. (Polish)
    0 references
    The main objective of the project is to increase the potential of the power grid to receive energy from renewable sources.The project assumptions, according to the adopted concept, will be implemented through:• automation of the SN network powered from 3 WN/SN stations together with reconstruction of 3 WN/SN power stations, • reconstruction of approx. 7.58 km of SN network, • construction of 2 compact SN/nn stations together with transformers with subload voltage regulation.The investment will include communes from Kujawsko-Pomorskie voivodship indicated in point B.4 of the proposal. (English)
    15 October 2020
    0.8066113556454368
    0 references
    L’objectif principal du projet est d’accroître le potentiel du réseau électrique pour recevoir de l’énergie à partir de sources renouvelables.Les hypothèses du projet, selon le concept adopté, seront réalisées par:• l’automatisation du réseau SN alimenté à partir de 3 stations WN/SN ainsi que la conversion de 3 centrales électriques WN/SN, • reconstruction d’environ. 7,58 km du réseau SN, • le développement de 2 stations SN/nn compactes ainsi que des transformateurs avec régulation de la tension de sous-charge. L’investissement comprendra les communes de la voïvodie de Kujawsko-Pomorskie indiquée au point B.4 de la proposition. (French)
    1 December 2021
    0 references
    Das Hauptziel des Projekts ist es, das Potenzial des Stromnetzes zu erhöhen, um Energie aus erneuerbaren Quellen zu erhalten.Die Annahmen des Projekts werden nach dem angenommenen Konzept realisiert durch:• Automatisierung des SN-Netzes, das von 3 WN/SN-Stationen angetrieben wird, zusammen mit dem Umbau von 3 Kraftwerken WN/SN, • Rekonstruktion von ca. 7,58 km des SN-Netzes, • die Entwicklung von 2 kompakten SN/n-Stationen zusammen mit Transformatoren mit Unterlastspannungsregelung.Die Investition umfasst Gemeinden aus der Woiwodschaft Kujawsko-Pomorskie gemäß Punkt B.4 des Vorschlags. (German)
    7 December 2021
    0 references
    De belangrijkste doelstelling van het project is het vergroten van het potentieel van het elektriciteitsnet om energie uit hernieuwbare bronnen te ontvangen.De aannames van het project, volgens het goedgekeurde concept, zullen worden gerealiseerd door:• automatisering van het SN-netwerk op basis van 3 WN/SN-stations samen met de conversie van 3 centrales WN/SN, • reconstructie van ca. 7,58 km van het SN-netwerk, • de ontwikkeling van 2 compacte SN/nn-stations samen met transformatoren met sublastspanningsregeling.De investering omvat gemeenten van het woiwodschap Kujawsko-Pomorskie, zoals vermeld in punt B.4 van het voorstel. (Dutch)
    17 December 2021
    0 references
    L'obiettivo principale del progetto è quello di aumentare il potenziale della rete elettrica di ricevere energia da fonti rinnovabili.Le ipotesi del progetto, secondo il concetto adottato, saranno realizzate attraverso: • l'automazione della rete SN alimentata da 3 stazioni WN/SN insieme alla conversione di 3 centrali WN/SN, • ricostruzione di ca. 7,58 km della rete SN, • sviluppo di 2 stazioni compatte SN/nn insieme a trasformatori con regolazione della tensione sottocarico.L'investimento comprenderà i comuni del Voivodato Kujawsko-Pomorskie indicato al punto B.4 della proposta. (Italian)
    16 January 2022
    0 references
    El objetivo principal del proyecto es aumentar el potencial de la red eléctrica para recibir energía de fuentes renovables. Los supuestos del proyecto, de acuerdo con el concepto adoptado, se realizarán a través de: • automatización de la red SN alimentada desde 3 estaciones WN/SN junto con la conversión de 3 centrales eléctricas WN/SN, • reconstrucción de aprox. 7,58 km de la red SN, • el desarrollo de 2 estaciones compactas SN/nn junto con transformadores con regulación de tensión de subcarga. La inversión incluirá municipios del Voivodato Kujawsko-Pomorskie indicado en el punto B.4 de la propuesta. (Spanish)
    20 January 2022
    0 references
    Hovedformålet med projektet er at øge elnettets potentiale til at modtage energi fra vedvarende energikilder.Projektets antagelser vil ifølge det vedtagne koncept blive realiseret gennem:• automatisering af SN-nettet drevet fra 3 WN/SN-anlæg sammen med ombygning af 3 kraftværker WN/SN, • genopbygning af ca. 7,58 km af SN-nettet • udvikling af 2 kompakte SN/nn-stationer sammen med transformatorer med regulering af subbelastningsspænding.Investeringen vil omfatte kommuner fra Kujawsko-Pomorskie Voivodeship, der er angivet i forslagets punkt B.4. (Danish)
    26 July 2022
    0 references
    Ο κύριος στόχος του έργου είναι η αύξηση των δυνατοτήτων του δικτύου ηλεκτρικής ενέργειας να λαμβάνει ενέργεια από ανανεώσιμες πηγές.Οι παραδοχές του έργου, σύμφωνα με την υιοθετημένη έννοια, θα υλοποιηθούν μέσω:• αυτοματοποίησης του δικτύου SN που τροφοδοτείται από 3 σταθμούς WN/SN μαζί με τη μετατροπή 3 σταθμών WN/SN, • ανακατασκευής περίπου. 7,58 km του δικτύου SN, • ανάπτυξη 2 συμπαγών σταθμών SN/nn μαζί με μετασχηματιστές με ρύθμιση της τάσης υποφόρτισης. Η επένδυση θα περιλαμβάνει δήμους του Voivodeship Kujawsko-Pomorskie που αναφέρεται στο σημείο B.4 της πρότασης. (Greek)
    26 July 2022
    0 references
    Glavni cilj projekta je povećanje potencijala elektroenergetske mreže za primanje energije iz obnovljivih izvora.Pretpostavke projekta, prema usvojenom konceptu, ostvarit će se kroz: • automatizaciju SN mreže napajane iz 3 WN/SN stanice zajedno s prenamjenom 3 elektrane WN/SN, • rekonstrukcije cca. 7,58 km SN mreže, • razvoj 2 kompaktne SN/nn stanice zajedno s transformatorima s regulacijom napona podopterećenja.Ulaganje će uključivati općine iz Kujawsko-Pomorskog vojvodstva navedene u točki B.4 prijedloga. (Croatian)
    26 July 2022
    0 references
    Obiectivul principal al proiectului este creșterea potențialului rețelei electrice de a primi energie din surse regenerabile.Asumațiile proiectului, conform conceptului adoptat, vor fi realizate prin:• automatizarea rețelei SN alimentate de la 3 stații WN/SN împreună cu conversia a 3 centrale WN/SN, • reconstrucția a cca. 7,58 km din rețeaua SN, • dezvoltarea a 2 stații compacte SN/nn împreună cu transformatoare cu reglare a tensiunii de subsarcină.Investiția va include municipalitățile din Voievodatul Kujawsko-Pomorskie indicate la punctul B.4 din propunere. (Romanian)
    26 July 2022
    0 references
    Hlavným cieľom projektu je zvýšiť potenciál elektrickej siete prijímať energiu z obnoviteľných zdrojov. Predpoklady projektu, podľa prijatej koncepcie, budú realizované prostredníctvom:• automatizácie siete SN poháňanej z 3 WN/SN staníc spolu s prestavbou 3 elektrární WN/SN, • rekonštrukciou cca. 7,58 km siete SN, • vývoj 2 kompaktných staníc SN/nn spolu s transformátormi s reguláciou napätia pod zaťažením. Investície budú zahŕňať obce z Kujawsko-Pomorského vojvodstva uvedené v bode B.4 návrhu. (Slovak)
    26 July 2022
    0 references
    L-għan ewlieni tal-proġett huwa li jiżdied il-potenzjal tal-grilja tal-elettriku li tirċievi enerġija minn sorsi rinnovabbli.Is-suppożizzjonijiet tal-proġett, skont il-kunċett adottat, se jitwettqu permezz ta’:• l-awtomatizzazzjoni tan-netwerk SN li jaħdem minn 3 stazzjonijiet WN/SN flimkien mal-konverżjoni ta’ 3 impjanti tal-enerġija WN/SN, • ir-rikostruzzjoni ta’ madwar. 7.58 km tan-netwerk SN, • l-iżvilupp ta’ 2 stazzjonijiet SN/nn kompatti flimkien ma’ transformers b’regolazzjoni tal-vultaġġ taħt it-tagħbija.L-investiment se jinkludi muniċipalitajiet mill-Voivodeship Kujawsko-Pomorskie indikati fil-punt B.4 tal-proposta. (Maltese)
    26 July 2022
    0 references
    O principal objetivo do projeto é aumentar o potencial da rede elétrica para receber energia proveniente de fontes renováveis.Os pressupostos do projeto, de acordo com o conceito adotado, serão implementados através de:• automatização da rede SN alimentada a partir de 3 estações WN/SN juntamente com a reconstrução de 3 estações WN/SN, • reconstrução de cerca de 7,58 km da rede SN, • construção de 2 estações SN/nn compactas juntamente com transformadores com regulação da tensão de subcarga.O investimento incluirá municípios do voivodato de Kujawsko-Pomorskie indicados no ponto B.4 da proposta. (Portuguese)
    26 July 2022
    0 references
    Hankkeen päätavoitteena on lisätä sähköverkon potentiaalia saada energiaa uusiutuvista energialähteistä. Hankkeen oletukset toteutetaan hyväksytyn konseptin mukaisesti seuraavasti:• 3 WN/SN -voimaloista toimivan SN-verkon automatisointi sekä kolmen WN/SN-voimalan muuntaminen • n. 7,58 km SN-verkosta • kahden kompaktin SN/n-aseman kehittäminen yhdessä alikuormajännitteellä toimivien muuntajien kanssa.investointi käsittää ehdotuksen kohdassa B.4 mainitut Kujawsko-Pomorskie Voivodeshipin kunnat. (Finnish)
    26 July 2022
    0 references
    Glavni cilj projekta je povečati potencial električnega omrežja za sprejemanje energije iz obnovljivih virov.Predpostavke projekta bodo v skladu s sprejetim konceptom uresničene z: • avtomatizacijo omrežja SN, ki ga poganjajo 3 WN/SN, skupaj s pretvorbo 3 elektrarn WN/SN, • rekonstrukcijo pribl. 7,58 km omrežja SN, • razvoj dveh kompaktnih SN/nn postaj skupaj s transformatorji z regulacijo napetosti pod obremenitvijo.Naložba bo vključevala občine iz Kujawsko-Pomorskie Voivodeship, navedene v točki B.4 predloga. (Slovenian)
    26 July 2022
    0 references
    Hlavním cílem projektu je zvýšit potenciál energetické sítě pro získávání energie z obnovitelných zdrojů.Předpoklady projektu budou podle přijaté koncepce realizovány prostřednictvím:• automatizace sítě SN napájené ze 3 WN/SN stanic spolu s přeměnou 3 elektráren WN/SN, • rekonstrukce cca. 7,58 km sítě SN, • vývoj 2 kompaktních SN/nn stanic spolu s transformátory s regulací napětí pod zatížením.Investice bude zahrnovat obce z Kujawsko-Pomorského vojvodství uvedené v bodě B.4 návrhu. (Czech)
    26 July 2022
    0 references
    Pagrindinis projekto tikslas – padidinti elektros tinklo potencialą gauti energiją iš atsinaujinančių šaltinių.Projekto prielaidos pagal patvirtintą koncepciją bus įgyvendintos:• automatizuojant SN tinklą, maitinamą iš 3 WN/SN stočių, kartu su 3 elektrinių WN/SN pertvarkymu, • rekonstruojant maždaug 3 WN/SN jėgaines. 7,58 km SN tinklo, • 2 kompaktinių SN/nn stočių plėtra kartu su transformatoriais, kuriems taikomas dalinės apkrovos įtampos reguliavimas.Investicijos apims pasiūlymo B.4 punkte nurodytas Kujavijos Pamario vaivadijos savivaldybes. (Lithuanian)
    26 July 2022
    0 references
    Projekta galvenais mērķis ir palielināt elektrotīkla potenciālu saņemt enerģiju no atjaunojamiem energoresursiem.Projekta pieņēmumi saskaņā ar pieņemto koncepciju tiks realizēti, izmantojot:• SN tīkla automatizāciju, kas tiek darbināta no 3 WN/SN stacijām, līdz ar 3 spēkstaciju pārveidošanu WN/SN, • rekonstrukciju apm. 7,58 km no SN tīkla, • 2 kompakto SN/nn staciju izstrāde kopā ar transformatoriem ar zemslodzes sprieguma regulēšanu. Ieguldījumi ietvers pašvaldības no Kujawsko-Pomorskie vojevodistes, kas norādītas priekšlikuma B.4. punktā. (Latvian)
    26 July 2022
    0 references
    Основната цел на проекта е да се увеличи потенциалът на електроенергийната мрежа за получаване на енергия от възобновяеми източници.Предположенията на проекта, съгласно приетата концепция, ще бъдат реализирани чрез: • автоматизация на SN мрежата, захранвана от 3 WN/SN станции, заедно с преобразуването на 3 електроцентрали WN/SN, • реконструкция на прибл. 7,58 км от SN мрежата, • разработване на 2 компактни SN/nn станции заедно с трансформатори с регулиране на поднатоварното напрежение.Инвестицията ще включва общините от Куявско-Поморското войводство, посочени в точка Б.4 от предложението. (Bulgarian)
    26 July 2022
    0 references
    A projekt fő célja, hogy növelje a villamosenergia-hálózatban rejlő potenciált a megújuló energiaforrásokból származó energia fogadására.A projekt feltételezései az elfogadott koncepció szerint a következőkön keresztül valósulnak meg:• az SN hálózat 3 WN/SN erőműből történő automatizálása, valamint 3 WN/SN erőmű átalakítása, • kb. 7,58 km SN hálózat, • 2 kompakt SN/nn állomás fejlesztése a részterhelési feszültségszabályozással rendelkező transzformátorokkal együtt.A beruházás a javaslat B.4. pontjában megjelölt Kujawsko-Pomorskie vajdaság településeit is magában foglalja. (Hungarian)
    26 July 2022
    0 references
    Is é príomhchuspóir an tionscadail acmhainneacht na heangaí cumhachta a mhéadú chun fuinneamh a fháil ó fhoinsí in-athnuaite.Toimhdí an tionscadail, de réir an choincheapa glactha, bainfear amach iad trí:• uathoibriú an líonra SN faoi thiomáint ó stáisiúin 3 WN/SN mar aon le tiontú 3 stáisiúin chumhachta WN/SN, • atógáil thart. 7.58 km den líonra SN, • forbairt 2 stáisiún dlúth SN/nn mar aon le claochladáin le rialachán voltais fo-ualach. Áireofar san infheistíocht bardais ón Kujawsko-Pomorskie Voivodeship a léirítear i bpointe B.4 den togra. (Irish)
    26 July 2022
    0 references
    Huvudsyftet med projektet är att öka elnätets potential att ta emot energi från förnybara energikällor.Projektets antaganden, enligt det antagna konceptet, kommer att realiseras genom:• automatisering av det SN-nät som drivs från 3 WN/SN-stationer tillsammans med omvandlingen av 3 kraftverk WN/SN, • rekonstruktion av ca. 7,58 km från SN-nätet, • utveckling av två kompakta SN/nn-stationer tillsammans med transformatorer med reglering av underlastspänning.Investeringen kommer att omfatta kommuner från Kujawsko-Pomorskie Voivodeship som anges i punkt B.4 i förslaget. (Swedish)
    26 July 2022
    0 references
    Projekti peamine eesmärk on suurendada elektrivõrgu potentsiaali saada energiat taastuvatest energiaallikatest.Projekti eeldused, vastavalt vastuvõetud kontseptsioonile, realiseeritakse järgmiselt:• 3 WN/SN jaamadest toidetava SN-võrgu automatiseerimine koos kolme elektrijaama ümberehitamisega WN/SN, • ümberehitamine umbes. 7,58 km SN võrku, • kahe kompaktse SN/nn jaama arendamine koos alamkoormuse pinge reguleerimisega trafodega.Investeeringud hõlmavad ettepaneku punktis B.4 osutatud Kujawsko-Pomorskie vojevoodkonna omavalitsusi. (Estonian)
    26 July 2022
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: Bydgoszcz
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: bydgoski
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: inowrocławski
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: nakielski
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: żniński
    0 references
    13 December 2023
    0 references

    Identifiers

    RPKP.03.01.00-04-0001/18
    0 references