Tworóg-Kędzierzyn gas pipeline (Q86120)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q86120 in Poland
Language Label Description Also known as
English
Tworóg-Kędzierzyn gas pipeline
Project Q86120 in Poland

    Statements

    0 references
    147,118,170.52 zloty
    0 references
    32,704,369.31 Euro
    13 January 2020
    0 references
    219,250,004.55 zloty
    0 references
    48,739,276.01 Euro
    13 January 2020
    0 references
    67.1 percent
    0 references
    1 January 2015
    0 references
    31 March 2022
    0 references
    OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
    0 references
    0 references

    50°20'43.8"N, 18°14'41.3"E
    0 references

    50°21'34.9"N, 18°24'29.9"E
    0 references

    50°27'18.4"N, 18°31'5.2"E
    0 references

    50°30'32.0"N, 18°36'45.0"E
    0 references

    50°31'54.8"N, 18°43'7.3"E
    0 references
    Przedmiotem projektu jest budowa gazociągu Tworóg - Kędzierzyn o średnicy DN1000 i maksymalnym ciśnieniu roboczym MOP 8,4 MPa, węzła przesyłu gazu Tworóg wraz ze śluzą uniwersalną nadania i odbioru tłoka inspekcyjnego wraz z infrastrukturą towarzyszącą, liniowych zespołów zaporowo-upustowych z układami obejściowymi wyposażonymi w kolektory umożliwiające podłączanie nowych stacji/odbiorców (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Polish)
    0 references
    The subject of the project is the construction of the Tworóg – Curtain with DN1000 diameter and maximum operating pressure of the ILO 8.4 MPa, the Tworóg gas transfer node with the universal lock of the inspection piston, along with the accompanying infrastructure, linear firewalls with bypass systems equipped with collectors to connect new stations/receivers (ZZU, Blachownia). (English)
    14 October 2020
    0.046619474321851
    0 references
    L’objet du projet est la construction du gazoduc Tworóg-Kędzierzyn d’un diamètre de DN1000 et d’une pression de fonctionnement maximale de 8,4 MPa, la jonction de transmission de gaz Tworóg avec le verrouillage universel de la transmission du piston d’inspection et la réception du piston d’inspection ainsi que l’infrastructure qui l’accompagne, des unités d’amortissement linéaires avec des systèmes de dérivation équipés de collecteurs permettant le raccordement de nouvelles stations/signataires (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (French)
    30 November 2021
    0 references
    Gegenstand des Projekts ist der Bau der Gasleitung Tworóg-Kędzierzyn mit einem Durchmesser von DN1000 und einem maximalen Betriebsdruck von MOP 8,4 MPa, der Gasübertragungsanschluss Tworóg mit der universellen Sperre der Inspektionskolbenübertragung und dem Empfang des Inspektionskolbens zusammen mit der zugehörigen Infrastruktur, lineare Dämpfungseinheiten mit Bypasssystemen mit Kollektoren, die den Anschluss neuer Stationen/Empfänger ermöglichen (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (German)
    7 December 2021
    0 references
    Het onderwerp van het project is de bouw van de Tworóg-Kędzierzyn-gasleiding met een diameter van DN1000 en een maximale werkdruk van MOP 8.4 MPa, de Tworóg-gastransmissieverbinding met het universele slot van de inspectiezuigertransmissie en ontvangst van de inspectiezuiger, samen met de bijbehorende infrastructuur, lineaire dempingseenheden met bypasssystemen die zijn uitgerust met verzamelaars die de aansluiting van nieuwe stations/consignees mogelijk maken (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Dutch)
    16 December 2021
    0 references
    Oggetto del progetto è la costruzione del gasdotto Tworóg-Kędzierzyn con un diametro di DN1000 e una pressione massima di esercizio di MOP 8,4 MPa, la giunzione di trasmissione del gas Tworóg con la serratura universale della trasmissione del pistone di ispezione e la ricezione del pistone di ispezione insieme all'infrastruttura di accompagnamento, unità di smorzamento lineari con sistemi di bypass dotati di collettori che consentono il collegamento di nuove stazioni/destinazioni (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Italian)
    16 January 2022
    0 references
    El objeto del proyecto es la construcción del gasoducto Tworóg-Kędzierzyn con un diámetro de DN1000 y una presión máxima de funcionamiento de MOP 8,4 MPa, la unión de transmisión de gas Tworóg con la cerradura universal de la transmisión del pistón de inspección y recepción del pistón de inspección junto con la infraestructura de acompañamiento, unidades de amortiguación lineales con sistemas de derivación equipados con colectores que permiten la conexión de nuevas estaciones/consignados (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Spanish)
    19 January 2022
    0 references
    Emnet for projektet er opførelsen af gasledningen Tworóg-Kędzierzyn med en diameter på DN1000 og et maksimalt driftstryk på MOP 8,4 MPa, Tworóg-gastransmissionskrydset med den universelle lås af inspektionsstempeltransmissionen og modtagelse af inspektionsstempel sammen med den tilhørende infrastruktur, lineære dæmpningsenheder med bypasssystemer udstyret med samlere, der muliggør tilslutning af nye stationer/modtagere (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Danish)
    26 July 2022
    0 references
    Αντικείμενο του έργου είναι η κατασκευή του αγωγού αερίου Tworóg-Kędzierzyn με διάμετρο DN1000 και μέγιστη πίεση λειτουργίας MOP 8,4 MPa, η διασταύρωση μεταφοράς αερίου Tworóg με την καθολική κλειδαριά της μεταφοράς εμβόλου επιθεώρησης και λήψη του εμβόλου επιθεώρησης μαζί με τη συνοδευτική υποδομή, μονάδες γραμμικής απόσβεσης με συστήματα παράκαμψης εξοπλισμένα με συλλέκτες που επιτρέπουν τη σύνδεση νέων σταθμών/παραλαβών (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Greek)
    26 July 2022
    0 references
    Predmet projekta je izgradnja plinovoda Tworóg-Kędzierzyn promjera DN1000 i maksimalnog radnog tlaka MOP 8,4 MPa, spoja za transport plina Tworóg s univerzalnom bravom inspekcijskog prijenosa klipa i prijemom inspekcijskog klipa uz prateću infrastrukturu, linearne prigušnice sa sustavima zaobilaznica opremljenima kolektorima koji omogućuju spajanje novih postaja/primatelja (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Croatian)
    26 July 2022
    0 references
    Obiectul proiectului este construirea conductei de gaz Tworóg-Kędzierzyn cu un diametru de DN1000 și o presiune maximă de funcționare de 8,4 MPa, joncțiunea de transmisie a gazului Tworóg cu blocarea universală a transmisiei pistonului de inspecție și recepția pistonului de inspecție împreună cu infrastructura însoțitoare, unități de amortizare liniară cu sisteme de bypass echipate cu colectoare care permit conectarea noilor stații/destinatari (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Romanian)
    26 July 2022
    0 references
    Predmetom projektu je výstavba plynovodu Tworóg-Kędzierzyn s priemerom DN1000 a maximálnym prevádzkovým tlakom MOP 8,4 MPa, plynový spoj Tworóg s univerzálnou zámkou inšpekčného piestu a príjem inšpekčného piestu spolu so sprievodnou infraštruktúrou, lineárne tlmiace jednotky s obchvatovými systémami vybavenými zberačmi umožňujúcimi pripojenie nových staníc/príjemcov (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Slovak)
    26 July 2022
    0 references
    Is-suġġett tal-proġett huwa l-kostruzzjoni tal-pipeline tal-gass Tworóg-Kędzierzyn b’dijametru ta’ DN1000 u pressjoni operattiva massima ta’ MOP 8.4 MPa, il-junction tat-trażmissjoni tal-gass ta’ Tworóg mal-illokkjar universali tat-trażmissjoni tal-pistun tal-ispezzjoni u r-riċeviment tal-pistun tal-ispezzjoni flimkien mal-infrastruttura li takkumpanjah, unitajiet ta’ damping lineari b’sistemi ta’ bypass mgħammra b’kolletturi li jippermettu l-konnessjoni ta’ stazzjonijiet/konsenjaturi ġodda (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Maltese)
    26 July 2022
    0 references
    O objeto do projeto é a construção do gasoduto Tworóg-Kędzierzyn com um diâmetro de DN1000 e uma pressão máxima de funcionamento de MOP 8,4 MPa, a junção de transmissão de gás Tworóg com o bloqueio universal da transmissão do pistão de inspeção e receção do pistão de inspeção juntamente com a infraestrutura de acompanhamento, unidades de amortecimento lineares com sistemas de derivação equipados com coletores que permitem a ligação de novas estações/destinatários (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Portuguese)
    26 July 2022
    0 references
    Hankkeen kohteena on Tworóg-Kędzierzynin kaasuputken rakentaminen, jonka läpimitta on DN1000 ja enimmäiskäyttöpaine MOP 8,4 MPa, Tworóg-kaasunsiirtoyhteys tarkastusmäntäsiirron yleismaailmalliseen lukkoon ja tarkastusmännän vastaanottoon sekä siihen liittyvä infrastruktuuri, lineaariset vaimennusyksiköt, joissa on ohitusjärjestelmät, jotka on varustettu keräilijöillä, jotka mahdollistavat uusien asemien/vastaanottimien (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice) liittämisen. (Finnish)
    26 July 2022
    0 references
    Predmet projekta je gradnja plinovoda Tworóg-Kędzierzyn s premerom DN1000 in maksimalnim obratovalnim tlakom MOP 8,4 MPa, vozlišče za prenos plina Tworóg z univerzalno ključavnico inšpekcijskega prenosa bata in sprejem inšpekcijskega bata skupaj s spremljajočo infrastrukturo, linearne dušilne enote z obvodnimi sistemi, opremljenimi z zbiralniki, ki omogočajo priključitev novih postaj/prejemnikov (ZZU Blachownia, ZZU Poniszowice, ZZU Gawice). (Slovenian)
    26 July 2022
    0 references
    Předmětem projektu je výstavba plynovodu Tworóg-Kędzierzyn o průměru DN1000 a maximálním provozním tlaku MOP 8,4 MPa, plynovodu Tworóg s univerzálním uzamčením inspekčního pístu a příjmem kontrolního pístu spolu s doprovodnou infrastrukturou, lineární tlumicí jednotky s obtokovými systémy vybavenými sběračem umožňujícím připojení nových stanic/přijímačů (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Czech)
    26 July 2022
    0 references
    Projekto objektas – DN1000 skersmens dujotiekio „Tworóg-Kędzierzyn“ tiesimas ir maksimalus MOP 8,4 MPa darbinis slėgis, „Tworóg“ dujų perdavimo jungtis su universalia tikrinimo stūmoklio perdavimo spyna ir tikrinimo stūmoklio priėmimu, linijiniai slopintuvai su aplinkkelio sistemomis su kolektoriais, leidžiančiais sujungti naujas stotis/gavitus (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Lithuanian)
    26 July 2022
    0 references
    Projekta priekšmets ir gāzes cauruļvada Tworóg-Kędzierzyn būvniecība ar diametru DN1000 un maksimālo darba spiedienu MOP 8,4 MPa, Tworóg gāzes pārvades savienojumu ar universālo kontroles virzuļa slēdzeni un pārbaudes virzuļa saņemšanu kopā ar pievienoto infrastruktūru, lineārās amortizācijas iekārtas ar apvedceļa sistēmām, kas aprīkotas ar kolektoriem, kas ļauj pieslēgt jaunas stacijas/saņēmējus (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Latvian)
    26 July 2022
    0 references
    Предмет на проекта е изграждането на газопровода Tworóg-Kędzierzyn с диаметър DN1000 и максимално работно налягане от MOP 8,4 MPa, газопреносната връзка Tworóg с универсално заключване на инспекционното бутало и приемане на инспекционното бутало заедно със съпътстващата инфраструктура, линейни амортисьори с обходни системи, оборудвани с колекционери, позволяващи свързването на нови станции/получатели (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Bulgarian)
    26 July 2022
    0 references
    A projekt tárgya a Tworóg-Kędzierzyn gázvezeték építése, amelynek átmérője DN1000, maximális üzemi nyomása MOP 8,4 MPa, a Tworóg gázszállító csomópont az ellenőrző dugattyú átvitelének egyetemes zárjával és az ellenőrző dugattyú vételével, valamint a kísérő infrastruktúrával, az új állomások/szállítmányok (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice, ZZU Blachownia, ZZU Poniszowice, ZZU Blachownia, ZZU Poniszowice, ZZU Poniszowice, ZZU Blachownia, ZZU Poniszowice, ZZU Poniszowice, ZZU Blachownia, ZZU Poniszowice, ZZU Blachownia, ZZU Poniszowice, ZZU Blachownia, ZZU Poniszowice, ZZU Poniszowice, ZZU Blachownia, ZZU Poniszowice, ZZU Poniszowice, ZZU Blachownia, ZZU Blachownia, ZZU Poniszowice, ZZU Poniszowice, ZZU Blachownia, ZZU Blachownia, ZZU Blachownia, ZZU Blachownia, ZZU Poniszowice, ZZU Poniszowice, ZZU Blachownia, ZZU Blachownia, ZZUU Blachownia, ZZU Poni (Hungarian)
    26 July 2022
    0 references
    Is é ábhar an tionscadail tógáil na píblíne gáis Tworóg-Kędzierzyn le trastomhas de DN1000 agus brú oibriúcháin uasta de MOP 8.4 MPa, an acomhal tarchuir gáis Tworóg leis an glas uilíoch ar an tarchur loine cigireachta agus fáiltiú an loine cigireachta chomh maith leis an mbonneagar a ghabhann leis, aonaid damping líneach le córais seachbhóthar atá feistithe le bailitheoirí ar chumas an nasc stáisiúin nua/consignees (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Irish)
    26 July 2022
    0 references
    Föremålet för projektet är byggandet av gasledningen Tworóg-Kędzierzyn med en diameter på DN1000 och ett maximalt driftstryck på MOP 8,4 MPa, tvåróg-gasöverföringskopplingen med det universella låset för inspektionskolvöverföringen och mottagning av inspektionskolven tillsammans med tillhörande infrastruktur, linjära dämpningsenheter med bypasssystem utrustade med uppsamlare som möjliggör anslutning av nya stationer/avsändare (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Swedish)
    26 July 2022
    0 references
    Projekti ese on Tworóg-Kędzierzyni gaasijuhtme ehitamine, mille läbimõõt on DN1000 ja maksimaalne töörõhk 8,4 MPa, Tworóg gaasi ülekandeühendus koos kontrollkolbide universaalse lukuga ning sellega kaasnev infrastruktuur, lineaarsed summutusseadmed koos kollektoritega varustatud ümbersõidusüsteemidega, mis võimaldavad ühendada uusi jaamasid/saatjaid (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Estonian)
    26 July 2022
    0 references
    WOJ.: OPOLSKIE, POW.: kędzierzyńsko-kozielski
    0 references
    WOJ.: ŚLĄSKIE, POW.: gliwicki
    0 references
    WOJ.: ŚLĄSKIE, POW.: tarnogórski
    0 references
    24 May 2023
    0 references

    Identifiers

    POIS.07.01.00-00-0008/17
    0 references