Reconstruction of Lomza communication system on national road No 63 (Q85950)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q85950 in Poland
Language Label Description Also known as
English
Reconstruction of Lomza communication system on national road No 63
Project Q85950 in Poland

    Statements

    0 references
    9,001,546.59 zloty
    0 references
    2,001,043.81 Euro
    13 January 2020
    0 references
    10,590,054.84 zloty
    0 references
    2,354,169.19 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 February 2014
    0 references
    31 March 2018
    0 references
    MIASTO ŁOMŻA
    0 references
    0 references

    53°10'56.6"N, 22°3'7.9"E
    0 references
    Projekt obejmuje 3 zadania inwestycyjne w ciągu dr. krajowej nr 63, położonej poza siecią TEN-T. W wyniku jego realizacji zapewniony zostanie standard nośności drogi 115kN/oś. (Polish)
    0 references
    The project comprises 3 investment tasks within the National Dr. No. 63, located outside the TEN-T network. As a result of this project, the load capacity standard of 115kN/axis will be ensured. (English)
    14 October 2020
    0.0078291574370249
    0 references
    Le projet comprend trois tâches d’investissement au sein du dr. 63 national, situé en dehors du réseau RTE-T. En raison de sa mise en œuvre, la norme de capacité de charge de la route 115kN/essieu sera assurée. (French)
    30 November 2021
    0 references
    Das Projekt umfasst drei Investitionsaufgaben innerhalb der nationalen dr. 63, die sich außerhalb des TEN-V-Netzes befinden. Dadurch wird der Tragfähigkeitsstandard der 115kN/Achse gewährleistet. (German)
    7 December 2021
    0 references
    Het project omvat 3 investeringstaken binnen de nationale dr. 63, die zich buiten het TEN-T-netwerk bevinden. (Dutch)
    16 December 2021
    0 references
    Il progetto comprende 3 compiti di investimento all'interno del dr. 63 nazionale, situati al di fuori della rete TEN-T. A seguito della sua attuazione, sarà garantito lo standard di capacità di carico della strada 115kN/asse. (Italian)
    16 January 2022
    0 references
    El proyecto incluye 3 tareas de inversión dentro del dr. 63 nacional, situado fuera de la red RTE-T. Como resultado de su aplicación, se garantizará la norma de capacidad de carga de la carretera de 115kN/eje. (Spanish)
    19 January 2022
    0 references
    Projektet omfatter 3 investeringsopgaver inden for den nationale dr. 63, der er beliggende uden for TEN-T-nettet. Som følge af dets gennemførelse vil lastekapacitetsstandarden for 115 kN/akslet vej sikres. (Danish)
    26 July 2022
    0 references
    Το έργο περιλαμβάνει 3 επενδυτικά καθήκοντα εντός του εθνικού δρ. 63, που βρίσκονται εκτός του δικτύου ΔΕΔ-Μ. Ως αποτέλεσμα της υλοποίησής του, θα διασφαλιστεί το πρότυπο χωρητικότητας φορτίου της οδού 115kN/άξονα. (Greek)
    26 July 2022
    0 references
    Projekt uključuje tri investicijska zadatka unutar nacionalnog dr. 63, koji se nalaze izvan mreže TEN-T. Kao rezultat njegove provedbe, osigurat će se standard nosivosti ceste 115 kN/osovine. (Croatian)
    26 July 2022
    0 references
    Proiectul include 3 sarcini de investiții în cadrul dr. 63 național, situat în afara rețelei TEN-T. Ca urmare a punerii sale în aplicare, va fi asigurat standardul capacității de încărcare a drumului de 115kN/axă. (Romanian)
    26 July 2022
    0 references
    Projekt zahŕňa 3 investičné úlohy v rámci vnútroštátnej dr. 63, ktorá sa nachádza mimo siete TEN-T. V dôsledku jeho realizácie sa zabezpečí norma nosnosti cesty 115kN/náprava. (Slovak)
    26 July 2022
    0 references
    Il-proġett jinkludi 3 kompiti ta’ investiment fi ħdan id-dr. 63 nazzjonali, li jinsabu barra min-netwerk TEN-T. Bħala riżultat tal-implimentazzjoni tiegħu, se jiġi żgurat l-istandard tal-kapaċità tat-tagħbija tat-triq ta’ 115kN/fus. (Maltese)
    26 July 2022
    0 references
    O projeto compreende 3 tarefas de investimento no âmbito do Dr. Nacional n.o 63, localizado fora da rede RTE-T. Como resultado deste projeto, será assegurado o padrão de capacidade de carga de 115kN/eixo. (Portuguese)
    26 July 2022
    0 references
    Hankkeeseen sisältyy kolme investointitehtävää kansallisen dr. 63:n sisällä, jotka sijaitsevat TEN-T-verkon ulkopuolella. Sen toteuttamisen tuloksena varmistetaan 115 kN/akselitien kantavuustaso. (Finnish)
    26 July 2022
    0 references
    Projekt vključuje tri investicijske naloge znotraj nacionalnega dr. 63, ki se nahajajo zunaj omrežja TEN-T. Zaradi njegove izvedbe bo zagotovljen standard nosilnosti 115kN/osne ceste. (Slovenian)
    26 July 2022
    0 references
    Projekt zahrnuje tři investiční úkoly v rámci vnitrostátního dr. 63, které se nacházejí mimo síť TEN-T. V důsledku jeho realizace bude zajištěn standard únosnosti 115kN/nápravové silnice. (Czech)
    26 July 2022
    0 references
    Projektas apima 3 investicines užduotis nacionaliniame dr. 63, esančiame už TEN-T tinklo ribų. Įgyvendinus projektą bus užtikrintas 115 kN/ašies kelio apkrovos pajėgumo standartas. (Lithuanian)
    26 July 2022
    0 references
    Projekts ietver 3 investīciju uzdevumus valsts dr. 63 ietvaros, kas atrodas ārpus TEN-T tīkla. Tā īstenošanas rezultātā tiks nodrošināts 115kN/ass ceļa kravnesības standarts. (Latvian)
    26 July 2022
    0 references
    Проектът включва 3 инвестиционни задачи в рамките на националния д-р 63, разположен извън мрежата TEN-T. В резултат на изпълнението му ще бъде осигурен стандартът за товароносимост на пътя 115kN/ос. (Bulgarian)
    26 July 2022
    0 references
    A projekt 3 beruházási feladatot foglal magában a nemzeti dr. 63-on belül, amelyek a TEN-T hálózaton kívül helyezkednek el. (Hungarian)
    26 July 2022
    0 references
    Áirítear leis an tionscadal 3 thasc infheistíochta laistigh den dr. 63 náisiúnta, atá lonnaithe lasmuigh de ghréasán TEN-T. Mar thoradh ar a chur chun feidhme, áiritheofar caighdeán acmhainne ualaigh an bhóthair 115kN/acastóra. (Irish)
    26 July 2022
    0 references
    Projektet omfattar tre investeringsuppgifter inom den nationella dr. 63, som ligger utanför TEN-T-nätet. Till följd av dess genomförande kommer lastkapacitetsstandarden för 115kN/axelvägen att säkerställas. (Swedish)
    26 July 2022
    0 references
    Projekt hõlmab kolme investeerimisülesannet riiklikus dr 63-s, mis asuvad väljaspool TEN-T võrku. Selle rakendamise tulemusena tagatakse 115kN/telgetee koormusstandard. (Estonian)
    26 July 2022
    0 references
    WOJ.: PODLASKIE, POW.: Łomża
    0 references
    24 May 2023
    0 references

    Identifiers

    POIS.04.02.00-00-0012/16
    0 references