(10360.14072017.115000034) 03.18_3126_FERMI (Q4934377)
Jump to navigation
Jump to search
Project Q4934377 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000034) 03.18_3126_FERMI |
Project Q4934377 in Italy |
Statements
158,921.44 Euro
0 references
600,000.0 Euro
0 references
26.49 percent
0 references
1 September 2017
0 references
6 September 2021
0 references
COMUNE DI PRATO
0 references
ALLO SCOPO DI PERSEGUIRE GLI OBIETTIVI DI EFFICIENTAMENTO ENERGETICO DELL?EDIFICIO IN ESAME, SI ? PREDISPOSTO UNO SPECIFICO PROGETTO CHE SI ARTICOLA SECONDO I SEGUENTI CONTENUTI.- INFISSI: ? PREVISTA LA RIMOZIONE DI TUTTI QUEGLI INFISSI ESISTENTI CHE NON RISPONDONO AI REQUISITI PRESTAZIONALI DI CUI AL DECRETO REQUISITI MINIMI 26/06/2015; PARALLELAMENTE, SI PROCEDER? ALLA POSA IN OPERA DI NUOVI SERRAMENTI IN ALLUMINIO, A TAGLIO TERMICO, CON VETRO-CAMERA BASSO-EMISSIVO (BE), RISPONDENTI AI REQUISITI PRESTAZIONALI DEL D.M. 16.02.2016 (CONTO TERMICO 2.0) CON UW < 1,67 W7MQ.K. L'INSTALLAZIONE AVVERR? CON PARTICOLARE ATTENZIONE ALLA CORREZIONE DEI C.D. ?PONTI TERMICI? PREVEDENDO QUINDI ANCHE LA SOSTITUZIONE DELLE ATTUALI SOGLIE CON NUOVE SOGLIE A TAGLIO TERMICO. LE VETRATE CON ORIENTAMENTO SUD-EST-SUD-SUD-OVEST SARANNO DOTATE DI RIVESTIMENTO SELETTIVO (VETRO A CONTROLLO SOLARE) CON FATTORE SOLARE DEL VETRO G, GL,N < 0,35.- ISOLAMENTO TERMICO STRUTTURE ORIZZONTALI E VERTICALI: L (Italian)
0 references
ЗА ДА СЕ ПРЕСЛЕДВАТ ЦЕЛИТЕ ЗА ЕНЕРГИЙНА ЕФЕКТИВНОСТ НА РАЗГЛЕЖДАНАТА СГРАДА, ДА? ПОДГОТВИ КОНКРЕТЕН ПРОЕКТ, КОЙТО Е СЪЧЛЕНЕН В СЪОТВЕТСТВИЕ СЪС СЛЕДНИТЕ CONTENTS.- ОСВЕТИТЕЛНИ ТЕЛА: ПЛАНИРАНО ОТСТРАНЯВАНЕ НА ВСИЧКИ СЪЩЕСТВУВАЩИ ПРИСПОСОБЛЕНИЯ, КОИТО НЕ ОТГОВАРЯТ НА ЕКСПЛОАТАЦИОННИТЕ ИЗИСКВАНИЯ, ОПРЕДЕЛЕНИ В НАРЕДБАТА ЗА МИНИМАЛНИ ИЗИСКВАНИЯ 26/06/2015; УСПОРЕДНО С ТОВА, ЩЕ ПРОДЪЛЖИМ ЛИ? В POSA in OPERA OF NEW ALUMINIUM SERVICES, THERMAL SIZE, С LOW-Emissive GLASS-CAMERA (BE), RESPONSENT TO THE Prestational Requests of D.M. 16.2.2016 (TERMICO CONTO 2.0) С UW < 1.67 W7MQ.K. ИНСТАЛАЦИЯ ЩЕ СЕ СЛУЧИ? С ОСОБЕНО ВНИМАНИЕ КЪМ КОРЕКЦИЯТА НА C.D.? ПОРАДИ ТОВА В НЕГО СЕ ПРЕДВИЖДА И ЗАМЯНАТА НА НАСТОЯЩИТЕ ПРАГОВЕ С НОВИ ПРАГОВЕ ЗА ТОПЛИННО ПРЕКЪСВАНЕ. Ветеранът с най-южно-южно-сухоземната ориентация ще бъде селективен преглед (с ДДС на ООН за контрол) с GLASS SOLAR Fattor G, GL, N < 0.35.- ТОПЛОИЗОЛАЦИОННИ ХОРИЗОНТАЛНИ И ВЕРТИКАЛНИ КОНСТРУКЦИИ: L (Bulgarian)
0 references
ABY BYLO MOŽNÉ DOSÁHNOUT CÍLŮ V OBLASTI ENERGETICKÉ ÚČINNOSTI UVAŽOVANÉ BUDOVY, ANO? PŘIPRAVILA KONKRÉTNÍ PROJEKT, KTERÝ JE ARTIKULOVÁN PODLE NÁSLEDUJÍCÍCH KONTENTS.- SVÍTIDEL: PLÁNOVANÉ ODSTRANĚNÍ VŠECH STÁVAJÍCÍCH ZAŘÍZENÍ, KTERÁ NESPLŇUJÍ POŽADAVKY NA VÝKON STANOVENÉ V MINIMÁLNÍCH POŽADAVCÍCH VYHLÁŠKY Č. 26/06/2015; SOUBĚŽNĚ, BUDEME POKRAČOVAT? Na POSA IN OPERA NEW ALUMINIUM SERVICES, THERMAL SIZE, with LOW-Emissive GLASS-CAMERA (BE), REZPEČENÝ na prestatní požadavky D.M. 16.2.2016 (TERMICO CONTO 2.0) s UW < 1.67 W7MQ.K. INSTALACE? SE ZVLÁŠTNÍM DŮRAZEM NA KOREKCI C.D. „TEPELNÝCH MOSTŮ“? PROTO ROVNĚŽ PŘEDPOKLÁDÁ NAHRAZENÍ STÁVAJÍCÍCH PRAHOVÝCH HODNOT NOVÝMI PRAHOVÝMI HODNOTAMI TEPELNÉHO ZLOMU. Hodnocení s Jihem-EST-SOUTH-SOUTH-SUD-OVEST ORIENTACE bude SELECTIVE REVIEW (SUN CONTROL VATTOR) s GLASS SOLAR Fattor G, GL,N & AMP;LT; 0,35.- TEPELNĚ IZOLAČNÍ HORIZONTÁLNÍ A VERTIKÁLNÍ KONSTRUKCE: L (Czech)
0 references
FOR AT FORFØLGE ENERGIEFFEKTIVITETSMÅLENE FOR DEN PÅGÆLDENDE BYGNING, JA? UDARBEJDET ET SPECIFIKT PROJEKT, DER ER FORMULERET I HENHOLD TIL FØLGENDE CONTENTS.- ARMATURER: PLANLAGT FJERNELSE AF ALLE EKSISTERENDE ARMATURER, DER IKKE OPFYLDER PRÆSTATIONSKRAVENE I DEKRETETS MINIMUMSKRAV 26/06/2015 PARALLELT HERMED FORTSÆTTER VI? I POSA IN OPERA OF NEW ALUMINIUM SERVICES, THERMAL SIZE, MED LOW-Emissive GLASS-CAMERA (BE), RESPONSENT TIL de præstationelle krav i D.M. 16.2.2016 (TERMICO CONTO 2.0) med UW < 1.67 W7MQ.K. INSTALLATION VIL FOREKOMME? MED SÆRLIG OPMÆRKSOMHED PÅ KORREKTION AF C.D.?TERMISKE BROER? DEN INDEHOLDER DERFOR OGSÅ BESTEMMELSER OM, AT DE NUVÆRENDE TÆRSKLER SKAL ERSTATTES MED NYE TERMISKE BRUDGRÆNSER. VETRATE MED SOUTH-SOUTH-SUD-OVEST ORIENTATION vil være SELECTIVE REVIEW (UN CONTROL VATTOR) med GLASS SOLAR Fattor G, GL,N & AMP;LT; 0,35.- VARMEISOLERING HORISONTALE OG VERTIKALE STRUKTURER: L (Danish)
0 references
UM DIE ENERGIEEFFIZIENZZIELE DES BETREFFENDEN GEBÄUDES ZU VERFOLGEN, JA? EIN SPEZIFISCHES PROJEKT VORBEREITET, DAS NACH DEN FOLGENDEN CONTENTS.- VORRICHTUNGEN ARTIKULIERT IST: GEPLANTE ENTFERNUNG ALLER VORHANDENEN VORRICHTUNGEN, DIE DIE LEISTUNGSANFORDERUNGEN DES DEKRETS 26/06/2015 NICHT ERFÜLLEN; PARALLEL DAZU WERDEN WIR WEITERMACHEN? Am POSA IN OPERA DER NEUE ALUMINIUM DIENSTLEISTUNGEN, THERMAL SIZE, MIT LOW-Emissive GLASS-CAMERA (BE), VERANTWENDUNG DER prästationalen Anforderungen von D.M. 16.2.2016 (TERMICO CONTO 2.0) MIT UW < 1.67 W7MQ.K. INSTALLATION ERFOLGT? MIT BESONDEREM AUGENMERK AUF DIE KORREKTUR VON C.D.?THERMISCHEN BRÜCKEN? SIE SIEHT DAHER AUCH DIE ERSETZUNG DER DERZEITIGEN SCHWELLENWERTE DURCH NEUE THERMISCHE BRUCHSCHWELLEN VOR. Die VETRATE MIT SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION WERDEN SELECTIVE REVIEW (SUN CONTROL VATTOR) MIT GLASS SOLAR Fattor G, GL,N < 0.35.- WÄRMEDÄMMUNG HORIZONTALE UND VERTIKALE STRUKTUREN: L (German)
0 references
ΓΙΑ ΤΗΝ ΕΠΊΤΕΥΞΗ ΤΩΝ ΣΤΌΧΩΝ ΕΝΕΡΓΕΙΑΚΉΣ ΑΠΌΔΟΣΗΣ ΤΟΥ ΥΠΌ ΕΞΈΤΑΣΗ ΚΤΙΡΊΟΥ, ΝΑΙ; ΠΡΟΕΤΟΊΜΑΣΕ ΈΝΑ ΣΥΓΚΕΚΡΙΜΈΝΟ ΈΡΓΟ ΤΟ ΟΠΟΊΟ ΑΡΘΡΏΝΕΤΑΙ ΣΎΜΦΩΝΑ ΜΕ ΤΑ ΑΚΌΛΟΥΘΑ ΠΕΡΙΕΧΌΜΕΝΑ.- ΦΩΤΙΣΤΙΚΆ: ΠΡΟΓΡΑΜΜΑΤΙΣΜΈΝΗ ΑΦΑΊΡΕΣΗ ΌΛΩΝ ΤΩΝ ΥΠΑΡΧΌΝΤΩΝ ΕΓΚΑΤΑΣΤΆΣΕΩΝ ΠΟΥ ΔΕΝ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΕΠΙΔΌΣΕΩΝ ΠΟΥ ΟΡΊΖΟΝΤΑΙ ΣΤΟ ΔΙΆΤΑΓΜΑ ΕΛΑΧΊΣΤΩΝ ΑΠΑΙΤΉΣΕΩΝ 26/06/2015· ΠΑΡΆΛΛΗΛΑ, ΘΑ ΠΡΟΧΩΡΉΣΟΥΜΕ; Στο POSA IN OPERA OF NEW ALUMINIUM SERVICES, THERMAL SIZE, ΜΕ LOW-Emissive GLASS-CAMERA (BE), ΑΝΑΦΟΡΕΣ ΣΤΙΣ ΠΡΟΣΤΑΤΙΚΕΣ ΑΠΑΙΤΗΣΕΙΣ του Δ.Μ. 16.2.2016 (TERMICO CONTO 2.0) ΜΕ UW &LT 1.67 W7MQ.K. ΕΓΚΑΤΆΣΤΑΣΗ ΘΑ ΣΥΜΒΕΊ; ΜΕ ΙΔΙΑΊΤΕΡΗ ΠΡΟΣΟΧΉ ΣΤΗ ΔΙΌΡΘΩΣΗ ΤΩΝ ΘΕΡΜΙΚΏΝ ΓΕΦΥΡΏΝ; ΩΣ ΕΚ ΤΟΎΤΟΥ, ΠΡΟΒΛΈΠΕΙ ΕΠΊΣΗΣ ΤΗΝ ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΤΩΝ ΙΣΧΥΌΝΤΩΝ ΚΑΤΏΤΑΤΩΝ ΟΡΊΩΝ ΜΕ ΝΈΑ ΌΡΙΑ ΘΕΡΜΙΚΉΣ ΔΙΑΚΟΠΉΣ. Το VETRATE ΜΕ ΝΟΤΙΟ-ΣΤ-ΝΟΤΙΟ-ΝΟΤΙΟ-ΝΟΤΙΟ-SUD-OVEST ORIENTATION θα είναι ΕΠΙΛΕΓΜΕΝΗ ΕΠΙΣΚΟΠΗΣΗ (ΕΛΕΓΧΟΣ ΗΛΙΟΥ) ΜΕ ΓΥΑΛΙ SOLAR Fattor G, GL, N < 0.35.- ΟΡΙΖΌΝΤΙΕΣ ΚΑΙ ΚΑΤΑΚΌΡΥΦΕΣ ΔΟΜΈΣ ΘΕΡΜΙΚΉΣ ΜΌΝΩΣΗΣ: L (Greek)
0 references
IN ORDER TO PURSUE THE ENERGY EFFICIENCY OBJECTIVES OF THE BUILDING UNDER CONSIDERATION, YES? PREPARED A SPECIFIC PROJECT THAT IS ARTICULATED ACCORDING TO THE FOLLOWING CONTENTS.- FIXTURES: PLANNED REMOVAL OF ALL EXISTING FIXTURES THAT DO NOT MEET THE PERFORMANCE REQUIREMENTS SET OUT IN THE DECREE MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, WILL WE PROCEED? At the POSA IN OPERA OF NEW ALUMINIUM SERVICES, THERMAL SIZE, WITH LOW-Emissive GLASS-CAMERA (BE), RESPONSENT TO THE PRESTATIONAL REQUIREMENTS OF D.M. 16.2.2016 (TERMICO CONTO 2.0) WITH UW < 1.67 W7MQ.K. INSTALLATION WILL OCCUR? WITH PARTICULAR ATTENTION TO THE CORRECTION OF C.D.?THERMAL BRIDGES? THEREFORE, IT ALSO FORESEES THE REPLACEMENT OF THE CURRENT THRESHOLDS WITH NEW THERMAL BREAK THRESHOLDS. The VETRATE WITH SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION WILL BE SELECTIVE REVIEW (SUN CONTROL VATTOR) WITH GLASS SOLAR FATTOR G, GL,N < 0.35.- THERMAL INSULATION HORIZONTAL AND VERTICAL STRUCTURES: L (English)
0.0585171997933717
0 references
PARA ALCANZAR LOS OBJETIVOS DE EFICIENCIA ENERGÉTICA DEL EDIFICIO CONSIDERADO, ¿SÍ? PREPARÓ UN PROYECTO ESPECÍFICO QUE SE ARTICULA DE ACUERDO CON LOS SIGUIENTES CONTENIDOS.- LUMINARIAS: RETIRADA PLANIFICADA DE TODOS LOS ACCESORIOS EXISTENTES QUE NO CUMPLAN LOS REQUISITOS DE RENDIMIENTO ESTABLECIDOS EN EL DECRETO DE REQUISITOS MÍNIMOS 26/06/2015; PARALELAMENTE, ¿VAMOS A PROCEDER? En la POSA EN OPERA DE NUEVOS SERVICIOS DE ALUMINIO, TÉRMAL, CON GLASS-CAMERA BAJA (BE), RESPONSENTE A LOS REQUISITOS prestacionales DEL D.M. 16.2.2016 (TERMICO CONTO 2.0) CON UW & AMP;LT; 1.67 W7MQ.K. LA INSTALACIÓN OCURRIRÁ? ¿CON ESPECIAL ATENCIÓN A LA CORRECCIÓN DE PUENTES TÉRMICOS C.D.? POR LO TANTO, TAMBIÉN PREVÉ LA SUSTITUCIÓN DE LOS UMBRALES ACTUALES POR NUEVOS UMBRALES DE RUPTURA TÉRMICA. El VETRATO CON ORIENTACIÓN SOUTH-EST-SOUTH-SUD-OVEST SERÁ REVISTA SELECTIVA (IVADOR DE CONTROL SUN) CON GLASS SOLAR Fattor G, GL, N & AMP;LT; 0.35.- ESTRUCTURAS HORIZONTALES Y VERTICALES DE AISLAMIENTO TÉRMICO: L (Spanish)
0 references
ET SAAVUTADA VAADELDAVA HOONE ENERGIATÕHUSUSE EESMÄRKE, JAH? VALMISTAS ETTE KONKREETSE PROJEKTI, MIS ON LIIGENDATUD VASTAVALT JÄRGMISTELE CONTENTS.- RAKISTELE: KÕIGI SELLISTE OLEMASOLEVATE SEADMETE KAVANDATUD KÕRVALDAMINE, MIS EI VASTA DEKREEDI 26/06/2015 MIINIMUMNÕUETELE; KAS PARALLEELSELT JÄTKAME? Uute ALUMINIUMi ERVICES OPERA’s, THERMAL SIZE, WITH LOW-Emissive GLASS-CAMERA (BE), D.M. 16.2.2016 (TERMICO CONTO 2.0) koos UW & AMP;LT; 1.67 W7MQ.K. PAIGALDAMINE TOIMUB? PÖÖRATES ERILIST TÄHELEPANU C.D. SOOJUSSILDADE KORRIGEERIMISELE? SEETÕTTU NÄHAKSE SELLEGA ETTE KA PRAEGUSTE PIIRMÄÄRADE ASENDAMINE UUTE SOOJUSVAHELÄVEDEGA. VETRATE koos SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION on SELECTIVE REVIEW (SUN CONTROL VATTOR) koos GLASS SOLAR Fattor G, GL, N & AMP;LT; 0,35.- SOOJUSISOLATSIOONI HORISONTAALSED JA VERTIKAALSED STRUKTUURID: L (Estonian)
0 references
JOTTA VOITAISIIN SAAVUTTAA TARKASTELTAVANA OLEVAN RAKENNUKSEN ENERGIATEHOKKUUSTAVOITTEET, KYLLÄ? VALMISTELLUT ERITYISEN HANKKEEN, JOKA ON NIVELLETTY SEURAAVIEN CONTENTS.-- VALAISIMIEN MUKAISESTI: KAIKKIEN SELLAISTEN OLEMASSA OLEVIEN KALUSTEIDEN SUUNNITELTU POISTAMINEN, JOTKA EIVÄT TÄYTÄ ASETUKSEN (EU) N:O 26/06/2015 VÄHIMMÄISVAATIMUKSIA; JATKAMMEKO SAMAAN AIKAAN? POSA IN OPERA OF NEW ALUMINIUM SERVICES, THERMAL SIZE, with LOW-Emissive GLASS-CAMERA (BE), RESPONSENT to the prestational REQUIREMENTS OF D.M. 16.2.2016 (TERMICO CONTO 2.0) UW &LT:n kanssa; 1.67 W7MQ.K. ASENNUS TAPAHTUU? KIINNITTÄEN ERITYISTÄ HUOMIOTA C.D.:N LÄMPÖSILTOJEN KORJAAMISEEN? SEN VUOKSI SIINÄ SÄÄDETÄÄN MYÖS NYKYISTEN KYNNYSARVOJEN KORVAAMISESTA UUSILLA LÄMPÖKATKOKYNNYKSILLÄ. Koulutus, jossa on SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION WILL BE SELECTIVE REVIEW (SUN CONTROL VATTOR) with GLASS SOLAR Fattor G, GL, N & AMP;LT; 0,35- HORISONTAALISET JA PYSTYSUORAT LÄMPÖERISTYSRAKENTEET: L (Finnish)
0 references
AFIN DE POURSUIVRE LES OBJECTIFS D’EFFICACITÉ ÉNERGÉTIQUE DU BÂTIMENT CONSIDÉRÉ, OUI? PRÉPARATION D’UN PROJET SPÉCIFIQUE QUI EST ARTICULÉ SELON LES CONTENTS SUIVANTS.- LUMINAIRES: SUPPRESSION PRÉVUE DE TOUS LES APPAREILS EXISTANTS QUI NE RÉPONDENT PAS AUX EXIGENCES DE PERFORMANCE ÉNONCÉES DANS LE DÉCRET DU 26/06/2015; EN PARALLÈLE, ALLONS-NOUS PROCÉDER? Au POSA IN OPERA OF NEW ALUMINIUM SERVICES, THERMAL SIZE, AVEC LOW-Emissive GLASS-CAMERA (BE), RESPONSABLE aux exigences de prestation de D.M. 16.2.2016 (TERMICO CONTO 2.0) AVEC UW & 1.67 W7MQ.K. INSTALLATION AURA LIEU? AVEC UNE ATTENTION PARTICULIÈRE À LA CORRECTION DES PONTS THERMIQUES C.D.? PAR CONSÉQUENT, IL PRÉVOIT ÉGALEMENT LE REMPLACEMENT DES SEUILS ACTUELS PAR DE NOUVEAUX SEUILS DE RUPTURE THERMIQUE. Le VETRATE AVEC L’ORIENTATION SUD-EST-SUD-OVEST SÉLECTIVE (TVATEUR DU CONTRÔLE DU SUN) AVEC GLASS SOLAR Fattor G, GL, N < 0,35.- ISOLATION THERMIQUE DES STRUCTURES HORIZONTALES ET VERTICALES: L (French)
0 references
D’FHONN CUSPÓIRÍ ÉIFEACHTÚLACHTA FUINNIMH AN FHOIRGNIMH ATÁ Á BHREITHNIÚ A SHAOTHRÚ, TÁ? D’ULLMHAIGH SÉ TIONSCADAL SONRACH A CHUIRTEAR IN IÚL I GCOMHRÉIR LEIS NA CONTENTS.- DAINGNEÁIN SEO A LEANAS: GO BHFUIL SÉ BEARTAITHE DEIREADH A CHUR LEIS NA DAINGNEÁIN UILE ATÁ ANN CHEANA NACH GCOMHLÍONANN NA CEANGLAIS FEIDHMÍOCHTA A LEAGTAR AMACH SAN FHORAITHNE MAIDIR LE HÍOSCHEANGLAIS 26/06/2015; AG AN AM CÉANNA, AN LEANFAIMID AR AGHAIDH? Ag an POSA IN OPERA NA SEIRBHÍSÍ ATHBHREITHNIÚ NUA, AN SÉARÁIN, LE LOW-Emissive GLASS-CAMERA (BE), A BHAINEANN LE CÁILÍOCHTAÍ PRESTATIONAL D.M. 16.2.2016 (Termico CONTO 2.0) LE UW & AMP;LT; 1.67 W7MQ.K. BEIDH SUITEÁIL TARLÚ? AGUS AIRD AR LEITH Á TABHAIRT AR DHROICHID THEIRMEACH C.D. A CHEARTÚ? DÁ BHRÍ SIN, FORÁILTEAR ANN FREISIN GO GCUIRFEAR TAIRSEACHA NUA MAIDIR LE SOS TEIRMEACH IN IONAD NA DTAIRSEACH REATHA. An Vetrate LE BHFUIL-EST-SOUTH-SUD-OVEST Oiriúnú ATHBHREITHNIÚ A DHÉANAMH A BHAINEANN LE GLASS SOLAR FATTOR G, GL, N < 0.35.- INSLIÚ TEIRMEACH STRUCHTÚIR CHOTHROMÁNACHA AGUS INGEARACHA: L (Irish)
0 references
KAKO BI SE OSTVARILI CILJEVI ENERGETSKE UČINKOVITOSTI PREDMETNE ZGRADE, DA? PRIPREMILI ODREĐENI PROJEKT KOJI JE ARTIKULIRAN U SKLADU SA SLJEDEĆIM KONTENTI.- ČVORA: PLANIRANO UKLANJANJE SVIH POSTOJEĆIH NAPRAVA KOJE NE ISPUNJAVAJU ZAHTJEVE U POGLEDU RADNIH KARAKTERISTIKA UTVRĐENE UREDBOM O MINIMALNIM ZAHTJEVIMA 26/06/2015; PARALELNO, HOĆEMO LI NASTAVITI? Na POSA IN OPERA NEW ALUMINIJSKE USLUGE, TERMALNI SMJEŠTAJ, S LOW-Emisive GLASS-CAMERA (BE), RESPONSENT to the prestational REQUIREMENTS of D.M. 16.2.2016 (TERMICO CONTO 2.0) S UW & AMP;LT; 1.67 W7MQ.K. INSTALACIJA ĆE SE DOGODITI? S POSEBNIM NAGLASKOM NA KOREKCIJU C.D.?TERMALNIH MOSTOVA? STOGA SE PREDVIĐA I ZAMJENA POSTOJEĆIH PRAGOVA NOVIM PRAGOVIMA TOPLINSKE STANKE. VETRATE S SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION će biti SELECTIVE REVIEW (SUN CONTROL VATTOR) S GLASS SOLAR Fattor G, GL, N & AMP;LT; 0,35 – TOPLINSKA IZOLACIJA VODORAVNE I VERTIKALNE STRUKTURE: L (Croatian)
0 references
A VIZSGÁLT ÉPÜLET ENERGIAHATÉKONYSÁGI CÉLKITŰZÉSEINEK MEGVALÓSÍTÁSA ÉRDEKÉBEN IGEN? KÉSZÍTETT EGY KONKRÉT PROJEKTET, AMELY A KÖVETKEZŐ CONTENTS.- SZERELVÉNYEK SZERINT ARTIKULÁLT: MINDEN OLYAN MEGLÉVŐ SZERELVÉNY TERVEZETT ELTÁVOLÍTÁSA, AMELY NEM FELEL MEG A KORMÁNYRENDELETBEN MEGHATÁROZOTT MINIMÁLIS KÖVETELMÉNYEKNEK (26.06.2015.); EZZEL PÁRHUZAMOSAN FOLYTATJUK? A POSA ÚJ ALUMINIUM SZOLGÁLTATÁSOK, THERMAL SIZE, WITH LOW-Emissive GLASS-CAMERA (BE), RESPONSENT a prestational követelmények D.M. 16.2.2016 (TERMICO CONTO 2.0) UW < 1.67 W7MQ.K. TELEPÍTÉS FOG TÖRTÉNNI? KÜLÖNÖS TEKINTETTEL A C.D. TERMÁLIS HIDAK KORREKCIÓJÁRA? EZÉRT AZT IS ELŐIRÁNYOZZA, HOGY A JELENLEGI KÜSZÖBÉRTÉKEKET ÚJ TERMIKUS SZÜNETI KÜSZÖBÉRTÉKEKKEL KELL FELVÁLTANI. A VETRATE SOUTH-SOUTH-SUD-OVEST ORIENTATIONAL SELECTIVE REVIEW (SUN CONTROL VATTOR) és GLASS SOLAR Fattor G, GL, N < 0,35.- HŐSZIGETELÉS VÍZSZINTES ÉS FÜGGŐLEGES SZERKEZETEK: L (Hungarian)
0 references
SIEKIANT ĮGYVENDINTI APTARIAMO PASTATO ENERGIJOS VARTOJIMO EFEKTYVUMO TIKSLUS, TAIP? PARENGĖ KONKRETŲ PROJEKTĄ, KURIS YRA SUJUNGTAS PAGAL ŠIUOS CONTENTS.- ARMATŪRAS: PLANUOJAMAS VISŲ ESAMŲ ĮRENGINIŲ, NEATITINKANČIŲ DEKRETE NUSTATYTŲ MINIMALIŲ REIKALAVIMŲ NR. 26/06/2015, PAŠALINIMAS; TUO PAČIU METU, AR TĘSIME? Prie naujų ALUMINIUMŲ PASLAUGŲ OPERA, THERMAL SIZE, SU LOW-Emissive GLASS-CAMERA (BE), PASIŪLYMAS Į 2016 m. vasario 16 d. preliminarius reikalavimus (TERMICO CONTO 2.0) SU UW < 1.67 W7MQ.K. MONTAVIMAS ĮVYKS? YPATINGĄ DĖMESĮ SKIRIANT C.D.?TERMINIŲ TILTŲ KOREKCIJAI? TODĖL JAME TAIP PAT NUMATOMA DABARTINES RIBINES VERTES PAKEISTI NAUJOMIS ŠILUMOS PERTRŪKIO RIBINĖMIS VERTĖMIS. VETRATE SU SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION bus SELECTIVE REVIEW (SUN CONTROL VATTOR) su SOLAR Fattor G, GL, N & AMP;LT; 0,35.- ŠILUMOS IZOLIACIJA HORIZONTALIOS IR VERTIKALIOS KONSTRUKCIJOS: L (Lithuanian)
0 references
LAI SASNIEGTU ATTIECĪGĀS ĒKAS ENERGOEFEKTIVITĀTES MĒRĶUS, JĀ? SAGATAVOJA KONKRĒTU PROJEKTU, KAS IR ŠARNĪRVEIDA SASKAŅĀ AR ŠĀDIEM CONTENTS.- ĶERMEŅI: VISU TO ESOŠO ARMATŪRAS PLĀNOTO NOŅEMŠANU, KAS NEATBILST DEKRĒTA MINIMĀLAJĀM PRASĪBĀM 26/06/2015; PARALĒLI, VAI MĒS TURPINĀSIM? Jauno ALUMINIUM PAKALPOJUMU OPERA, THERMAL SIZE, AR LOW-Emissive GLASS-CAMERA (BE), ATZĪMĒJUMIEM D.M. 16.2.2016. (TERMICO CONTO 2.0) ar UW &LT prestatālajām prasībām; 1.67 W7MQ.K. UZSTĀDĪŠANA NOTIKS? ĪPAŠU UZMANĪBU PIEVĒRŠOT C.D.?TERMISKO TILTU KOREKCIJAI? TĀPĒC TAJĀ ARĪ PAREDZĒTS PAŠREIZĒJOS SLIEKŠŅUS AIZSTĀT AR JAUNĀM TERMISKO PĀRTRAUKUMU ROBEŽVĒRTĪBĀM. VETRATE ar SOUTH-EST-SUD-OVEST ORIENTATION būs SELECTIVE REVIEW (SUN CONTROL VATTOR) ar GLASS SOLAR Fattor G, GL,N < 0.35.- SILTUMIZOLĀCIJAS HORIZONTĀLĀS UN VERTIKĀLĀS KONSTRUKCIJAS: L (Latvian)
0 references
SABIEX JINTLAĦQU L-OBJETTIVI TAL-EFFIĊJENZA ENERĠETIKA TAL-BINI LI QED JIĠI KKUNSIDRAT, IVA? IPPREPARA PROĠETT SPEĊIFIKU LI HUWA ARTIKOLAT SKONT IL-KONTENTS.- MUNTAĠĠI LI ĠEJJIN: IT-TNEĦĦIJA PPJANATA TAL-FIXTURES EŻISTENTI KOLLHA LI MA JISSODISFAWX IR-REKWIŻITI TA’ PRESTAZZJONI STABBILITI FID-DIGRIET DWAR IR-REKWIŻITI MINIMI 26/06/2015; B’MOD PARALLEL, SE NIPPROĊEDU? Fil-POSA F’OPERA TAS-SERVIZZI TAL-ALUMINIUM ĠODDA, B’GLASS-KAMRA TAL-LOW Emissivi (BE), RESPONSENTI GĦAR-REKWIŻITI Prestazzjonali tad-D.M. 16.2.2016 (TERMICO CONTO 2.0) B’UW & AMP;LT; 1.67 W7MQ.K. INSTALLAZZJONI SE JSEĦĦU? B’ATTENZJONI PARTIKOLARI GĦALL-KORREZZJONI TA ‘C.D. PONTIJIET TERMALI? GĦALHEKK, TIPPREVEDI WKOLL IS-SOSTITUZZJONI TAL-LIMITI ATTWALI B’LIMITI ĠODDA TA’ WAQFIEN TERMALI. L-ETVRATE WITH SOUTH-SOUTH-SUD-OVEST ORIENTATION WILL BE REVIEW SELECTIVE (VAT TAS-SUN CONTROL) B’GLASS SOLAR Fattor G, GL, N & AMP;LT; 0.35.- INSULAZZJONI TERMALI STRUTTURI ORIZZONTALI U VERTIKALI: L (Maltese)
0 references
OM DE ENERGIE-EFFICIËNTIEDOELSTELLINGEN VAN HET BETREFFENDE GEBOUW NA TE STREVEN, JA? EEN SPECIFIEK PROJECT VOORBEREID DAT IS OPGESTELD VOLGENS DE VOLGENDE CONTENTS.- ARMATUREN: GEPLANDE VERWIJDERING VAN ALLE BESTAANDE ARMATUREN DIE NIET VOLDOEN AAN DE PRESTATIE-EISEN VAN HET DECREET MINIMUMEISEN 26/06/2015; PARALLEL, GAAN WE VERDER? Op de POSA IN OPERA VAN NIEUWE ALUMINIUM DIENSTEN, THERMAL SIZE, MET LOW-Emissive GLASS-CAMERA (BE), RESPONSENT MET DE prestationele eisen van D.M. 16.2.2016 (TERMICO CONTO 2.0) MET UW < 1.67 W7MQ.K. INSTALLATIE ZAL PLAATSVINDEN? MET BIJZONDERE AANDACHT VOOR DE CORRECTIE VAN C.D.?THERMISCHE BRUGGEN? DAAROM VOORZIET ZIJ OOK IN DE VERVANGING VAN DE HUIDIGE DREMPELWAARDEN DOOR NIEUWE THERMISCHE ONDERBREKINGSDREMPELS. De VETRATE met SOUTH-EST-SOUTH-SUD-OVEST ORIENTATIE ZAL SELECTIVE REVIEW (SUN CONTROL VATTOR) met GLASS SOLAR Fattor G, GL,N < 0,35.- THERMISCHE ISOLATIE HORIZONTALE EN VERTICALE STRUCTUREN: L (Dutch)
0 references
A fim de prosseguir os objetivos de eficiência energética do edifício em análise, SIM? PREPARAÇÃO DE UM PROJECTO ESPECÍFICO ARTICULADO EM CONFORMIDADE COM O SEGUINTE CONTEÚDO.- FIXAÇÕES: REMOÇÃO PREVISTA DE TODAS AS FIXIDADES EXISTENTES QUE NÃO CUMPREM OS REQUISITOS DE DESEMPENHO PREVISTOS NOS REQUISITOS MÍNIMOS DECRETADOS 26/06/2015; Em paralelo, vamos avançar? Na POSA EM OPERAÇÃO DE NOVOS SERVIÇOS DE ALUMÍNIO, DIMENSÃO TÉRMICA, COM CÂMERA DE VIDRO DE BAIXA Emissividade (BE), RESPONSÁVEL PELOS REQUISITOS PRESTATIVOS DE D.M. 16.2.2016 (TERMICO CONTO 2.0) COM UW < 1.67 W7MQ.K. A INSTALAÇÃO SERÁ ACURADA? COM ATENÇÃO ESPECIAL À CORRECÇÃO DE C.D.? Por conseguinte, prevê também a substituição dos limiares actuais por novos limiares de ruptura térmica. O VETRATO COM ORIENTAÇÃO SOUTH-EST-SOUTH-SUD-OVEST SERÁ REVISÃO SELECTIVA (IVATOR DE CONTROLO DO SOL) COM FATOR SOLAR DE VIDRO G, GL, N < 0.35.- ESTRUTURAS HORIZONTAIS E VERTICAIS DE INSULAÇÃO TÉRMICA: L (Portuguese)
0 references
PENTRU A URMĂRI OBIECTIVELE DE EFICIENȚĂ ENERGETICĂ ALE CLĂDIRII ÎN CAUZĂ, DA? A PREGĂTIT UN PROIECT SPECIFIC CARE ESTE ARTICULAT ÎN CONFORMITATE CU URMĂTOARELE CONTENTE.- CORPURI DE ILUMINAT: ELIMINAREA PLANIFICATĂ A TUTUROR INSTALAȚIILOR EXISTENTE CARE NU ÎNDEPLINESC CERINȚELE DE PERFORMANȚĂ PREVĂZUTE ÎN DECRETUL PRIVIND CERINȚELE MINIME 26/06/2015; ÎN PARALEL, VOM CONTINUA? La POSA IN OPERA OF NOI ALUMINIUM SERVICES, SIZA THERMALĂ, cu GLASS-CAMERA (BE) cu emisii reduse (BE), RESPONSENT la cerințele prestaționale ale D.M. 16.2.2016 (TERMICO CONTO 2.0) cu UW & AMP;LT; 1.67 W7MQ.K. INSTALARE VA AVEA LOC? CU O ATENȚIE DEOSEBITĂ LA CORECTAREA C.D. PODURI TERMICE? PRIN URMARE, ACESTA PREVEDE, DE ASEMENEA, ÎNLOCUIREA PRAGURILOR ACTUALE CU NOI PRAGURI DE ÎNTRERUPERE TERMICĂ. VETRATE CU SOUTH-EST-SUD-SUD-OVEST ORIENTARE VA fi REVIEW SELECTIV (TVATOR SUN CONTROL) cu GLASS SOLAR Fattor G, GL, N & AMP;LT; 0,35.- STRUCTURI ORIZONTALE ȘI VERTICALE DE IZOLARE TERMICĂ: L (Romanian)
0 references
S CIEĽOM DOSIAHNUŤ CIELE ENERGETICKEJ EFEKTÍVNOSTI POSUDZOVANEJ BUDOVY ÁNO? PRIPRAVIL ŠPECIFICKÝ PROJEKT, KTORÝ JE KĹBOVÝ PODĽA NASLEDUJÚCICH PRVKOV CONTENTS.-: PLÁNOVANÉ ODSTRÁNENIE VŠETKÝCH EXISTUJÚCICH ZARIADENÍ, KTORÉ NESPĹŇAJÚ VÝKONNOSTNÉ POŽIADAVKY STANOVENÉ VO VYHLÁŠKE O MINIMÁLNYCH POŽIADAVKÁCH 26/06/2015; PARALELNE, BUDEME POKRAČOVAŤ? V POSA IN OPERA OF NOVÉ ALUMINIUM SERVICES, THERMAL SIZE, S LOW-Emissive GLASS-CAMERA (BE), REŠPONSENT NA preŠtátne požiadavky D.M. 16.2.2016 (TERMICO CONTO 2.0) S UW & AMP;LT; 1.67 W7MQ.K. INŠTALÁCIA SA USKUTOČNÍ? S OSOBITNÝM DÔRAZOM NA KOREKCIU C.D. TERMÁLNYCH MOSTOV? PRETO SA V ŇOM PREDPOKLADÁ AJ NAHRADENIE SÚČASNÝCH PRAHOVÝCH HODNÔT NOVÝMI PRAHOVÝMI HODNOTAMI TEPELNÝCH PRESTÁVOK. VETRATE S SOUTH-EST-SUD-SUD-OVEST ORIENTÁCIA bude SELECTIVE REVIEW (SUN CONTROL VATTOR) s GLASS SOLAR Fattor G, GL, N & AMP;LT; 0,35.- TEPELNOIZOLAČNÉ HORIZONTÁLNE A VERTIKÁLNE KONŠTRUKCIE: L (Slovak)
0 references
DA BI DOSEGLI CILJE ENERGETSKE UČINKOVITOSTI OBRAVNAVANE STAVBE, DA? PRIPRAVIL POSEBEN PROJEKT, KI JE OBLIKOVAN V SKLADU Z NASLEDNJIMI CONTENTS.- NAPELJAVAMI: NAČRTOVANA ODSTRANITEV VSEH OBSTOJEČIH NAPRAV, KI NE IZPOLNJUJEJO ZAHTEV GLEDE ZMOGLJIVOSTI, DOLOČENIH V UREDBI O MINIMALNIH ZAHTEVAH 26/06/2015; ALI BOMO VZPOREDNO NADALJEVALI? Na POSA IN OPERA NOVIH ALUMINIJSKIH SERVICES, THERMAL SIZE, Z LOW-Emisivno GLASS-CAMERA (BE), RESPONSENTNO V PREGLEDNIH ZAHTEVAH D.M. 16.2.2016 (TERMICO CONTO 2.0) Z UW < 1.67 W7MQ.K. BO PRIŠLO DO NAMESTITVE? S POSEBNO POZORNOSTJO NA KOREKCIJI C.D.?TERMALNIH MOSTOV? ZATO PREDVIDEVA TUDI NADOMESTITEV SEDANJIH PRAGOV Z NOVIMI PRAGOVI TOPLOTNE PREKINITVE. VETRATE S SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION BO SELECTIVE REVIEW (SUN CONTROL VATTOR) z GLASS SOLAR Fattor G, GL, N & AMP;LT; 0,35.- TOPLOTNA IZOLACIJA VODORAVNE IN VERTIKALNE STRUKTURE: L (Slovenian)
0 references
FÖR ATT UPPNÅ ENERGIEFFEKTIVITETSMÅLEN FÖR DEN BERÖRDA BYGGNADEN, JA? FÖRBEREDDE ETT SPECIFIKT PROJEKT SOM ÄR FORMULERAT ENLIGT FÖLJANDE CONTENTS.- FIXTURER: PLANERAT AVLÄGSNANDE AV ALLA BEFINTLIGA INVENTARIER SOM INTE UPPFYLLER DE PRESTANDAKRAV SOM ANGES I DEKRETETS MINIMIKRAV 26/06/2015. PARALLELLT, KOMMER VI ATT FORTSÄTTA? At the POSA IN OPERA OF NEW ALUMINIUM SERVICES, THERMAL SIZE, WITH LOW-Emissive GLASS-CAMERA (BE), RESPONSENT to the prestationella krav från D.M. 16.2.2016 (TERMICO CONTO 2.0) med UW & AMP;LT; 1.67 W7MQ.K. INSTALLATION KOMMER ATT SKE? MED SÄRSKILD UPPMÄRKSAMHET PÅ KORRIGERINGEN AV C.D. TERMISKA BROAR? DÄRFÖR FÖRUTSES OCKSÅ ATT DE NUVARANDE TRÖSKELVÄRDENA ERSÄTTS MED NYA TERMISKA BROTTSGRÄNSER. VETRATE MED SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION SELECTIVE REVIEW (SUN CONTROL VATTOR) med GLASS SOLAR Fattor G, GL,N < 0,35.- VÄRMEISOLERING HORISONTELLA OCH VERTIKALA STRUKTURER: L (Swedish)
0 references
PRATO
0 references
10 April 2023
0 references