425,000.0 Euro
0 references
850,000.0 Euro
0 references
50.0 percent
0 references
23 March 2018
0 references
23 March 2020
0 references
COMUNE DI PRATO
0 references
ALLO SCOPO DI PERSEGUIRE GLI OBIETTIVI DI EFFICIENTAMENTO ENERGETICO DELL?EDIFICIO IN ESAME, SI ? PREDISPOSTO UNO SPECIFICO PROGETTO CHE SI ARTICOLA SECONDO I SEGUENTI CONTENUTI.- INFISSI: ? PREVISTA LA RIMOZIONE DI TUTTI QUEGLI INFISSI ESISTENTI CHE NON RISPONDONO AI REQUISITI PRESTAZIONALI DI CUI AL DECRETO REQUISITI MINIMI 26/06/2015; PARALLELAMENTE, SI PROCEDER? ALLA POSA IN OPERA DI NUOVI SERRAMENTI IN LEGNO, CON VETRO-CAMERA BASSO-EMISSIVO (BE), RISPONDENTI AI REQUISITI PRESTAZIONALI DEL D.M. 16.02.2016 (CONTO TERMICO 2.0) CON UW < 1,67 W7MQ.K. L'INSTALLAZIONE AVVERR? CON PARTICOLARE ATTENZIONE ALLA CORREZIONE DEGLI INDEBOLIMENTI SUBITI NEL TEMPO DALLE STRUTTURE LAPIDEE SULLE FACCIATE, PERCI? SARANNO POSATE ANCHE NUOVE PIETRE (DOVE ESISTENTI) PER SOGLIE E CORNICI. LE VETRATE CON ORIENTAMENTO SUD-EST-SUD-SUD-OVEST SARANNO DOTATE DI RIVESTIMENTO SELETTIVO (VETRO A CONTROLLO SOLARE) CON FATTORE SOLARE DEL VETRO G, GL,N < 0,35.SARANNO INOLTRE ELIMINATE LE ATTUALI PERSIA (Italian)
0 references
ЗА ДА СЕ ПРЕСЛЕДВАТ ЦЕЛИТЕ ЗА ЕНЕРГИЙНА ЕФЕКТИВНОСТ НА РАЗГЛЕЖДАНАТА СГРАДА, ДА? ПОДГОТВИ КОНКРЕТЕН ПРОЕКТ, КОЙТО Е СЪЧЛЕНЕН В СЪОТВЕТСТВИЕ СЪС СЛЕДНИТЕ CONTENTS.- ОСВЕТИТЕЛНИ ТЕЛА: ПЛАНИРАНО ОТСТРАНЯВАНЕ НА ВСИЧКИ СЪЩЕСТВУВАЩИ ПРИСПОСОБЛЕНИЯ, КОИТО НЕ ОТГОВАРЯТ НА ЕКСПЛОАТАЦИОННИТЕ ИЗИСКВАНИЯ, ОПРЕДЕЛЕНИ В НАРЕДБАТА ЗА МИНИМАЛНИ ИЗИСКВАНИЯ 26/06/2015; УСПОРЕДНО С ТОВА, ЩЕ ПРОДЪЛЖИМ ЛИ? В POSA in OPERA OF NEW WOOD SERVICES, С LOW-Emissionive GLASS-CAMERA (BE), RESPONSANT TO THE Prestational Requests of D.M. 16.2.2016 (TERMICO CONTO 2.0) С UW < 1.67 W7MQ.K. ИНСТАЛАЦИЯ ЩЕ СЕ СЛУЧИ? С ОСОБЕНО ВНИМАНИЕ КЪМ КОРИГИРАНЕТО НА ОТСЛАБВАНЕТО, ПРЕТЪРПЯНО С ТЕЧЕНИЕ НА ВРЕМЕТО ОТ КАМЕННИ КОНСТРУКЦИИ ПО ФАСАДИТЕ, ТАКА ЛИ? НОВИ КАМЪНИ (КЪДЕТО СЪЩЕСТВУВАТ) СЪЩО ЩЕ БЪДАТ ПОСТАВЕНИ ЗА ПРАГОВЕ И РАМКИ. Ветеранът с най-южно-южно-сухоземната ориентация ще бъде селективен преглед (с ДДС на ООН за контрол) с GLASS SOLAR Fattor G, GL, N < 0.35.СЕГА ПЕРСИЯ СЪЩО ЩЕ БЪДЕ ЕЛИМИНИРАНА (Bulgarian)
0 references
ABY BYLO MOŽNÉ DOSÁHNOUT CÍLŮ V OBLASTI ENERGETICKÉ ÚČINNOSTI UVAŽOVANÉ BUDOVY, ANO? PŘIPRAVILA KONKRÉTNÍ PROJEKT, KTERÝ JE ARTIKULOVÁN PODLE NÁSLEDUJÍCÍCH KONTENTS.- SVÍTIDEL: PLÁNOVANÉ ODSTRANĚNÍ VŠECH STÁVAJÍCÍCH ZAŘÍZENÍ, KTERÁ NESPLŇUJÍ POŽADAVKY NA VÝKON STANOVENÉ V MINIMÁLNÍCH POŽADAVCÍCH VYHLÁŠKY Č. 26/06/2015; SOUBĚŽNĚ, BUDEME POKRAČOVAT? Na POSA V OPERA NEW WOOD SLUŽBY, S LOW-Emissive GLASS-CAMERA (BE), REZPEČNOSTNÍ NA Předstatní požadavky D.M. 16.2.2016 (TERMICO CONTO 2.0) s UW < 1.67 W7MQ.K. INSTALACE? SE ZVLÁŠTNÍ POZORNOSTÍ NA KOREKCI OSLABENÍ, KTERÉ V PRŮBĚHU ČASU UTRPĚLY KAMENNÉ KONSTRUKCE NA FASÁDÁCH, TAKŽE? NOVÉ KAMENY (KDE EXISTUJÍ) BUDOU ROVNĚŽ POLOŽENY PRO PRAHOVÉ HODNOTY A RÁMY. Hodnocení s Jihem-EST-SOUTH-SOUTH-SUD-OVEST ORIENTACE bude SELECTIVE REVIEW (SUN CONTROL VATTOR) s GLASS SOLAR Fattor G, GL,N & AMP;LT; 0,35.THE AKTUÁLNÍ PERSIE BUDE TAKÉ ODSTRANĚNA (Czech)
0 references
FOR AT FORFØLGE ENERGIEFFEKTIVITETSMÅLENE FOR DEN PÅGÆLDENDE BYGNING, JA? UDARBEJDET ET SPECIFIKT PROJEKT, DER ER FORMULERET I HENHOLD TIL FØLGENDE CONTENTS.- ARMATURER: PLANLAGT FJERNELSE AF ALLE EKSISTERENDE ARMATURER, DER IKKE OPFYLDER PRÆSTATIONSKRAVENE I DEKRETETS MINIMUMSKRAV 26/06/2015 PARALLELT HERMED FORTSÆTTER VI? I POSA IN OPERA OF NEW WOOD SERVICES, MED LOW-Emissive GLASS-CAMERA (BE), RESPONSANT TIL de præstationelle krav i D.M. 16.2.2016 (TERMICO CONTO 2.0) med UW < 1.67 W7MQ.K. INSTALLATION VIL FOREKOMME? MED SÆRLIG OPMÆRKSOMHED PÅ KORREKTIONEN AF SVÆKKELSEN LIDT OVER TID AF STENSTRUKTURER PÅ FACADERNE, SÅ? DER VIL OGSÅ BLIVE LAGT NYE STEN (HVOR DER FINDES) TIL TÆRSKLER OG RAMMER. VETRATE MED SOUTH-SOUTH-SUD-OVEST ORIENTATION vil være SELECTIVE REVIEW (UN CONTROL VATTOR) med GLASS SOLAR Fattor G, GL,N & AMP;LT; 0,35.DEN NUVÆRENDE PERSIEN VIL OGSÅ BLIVE ELIMINERET (Danish)
0 references
UM DIE ENERGIEEFFIZIENZZIELE DES BETREFFENDEN GEBÄUDES ZU VERFOLGEN, JA? EIN SPEZIFISCHES PROJEKT VORBEREITET, DAS NACH DEN FOLGENDEN CONTENTS.- VORRICHTUNGEN ARTIKULIERT IST: GEPLANTE ENTFERNUNG ALLER VORHANDENEN VORRICHTUNGEN, DIE DIE LEISTUNGSANFORDERUNGEN DES DEKRETS 26/06/2015 NICHT ERFÜLLEN; PARALLEL DAZU WERDEN WIR WEITERMACHEN? Am POSA IN OPERA NEUER WOOD DIENSTLEISTUNGEN, MIT LOW-Emissive GLASS-CAMERA (BE), VERANTWORTUNG DER prästationalen Anforderungen von D.M. 16.2.2016 (TERMICO CONTO 2.0) MIT UW < 1.67 W7MQ.K. INSTALLATION ERFOLGT? MIT BESONDEREM AUGENMERK AUF DIE KORREKTUR DER IM LAUFE DER ZEIT ERLITTENEN SCHWÄCHUNG DURCH STEINKONSTRUKTIONEN AN DEN FASSADEN, ALSO? NEUE STEINE (WO VORHANDEN) WERDEN AUCH FÜR SCHWELLEN UND RAHMEN VERLEGT. Die VETRATE MIT SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION WERDEN SELECTIVE REVIEW (SUN CONTROL VATTOR) MIT GLASS SOLAR Fattor G, GL,N < 0.35.DAS DERZEITIGE PERSIEN WIRD EBENFALLS ELIMINIERT (German)
0 references
ΓΙΑ ΤΗΝ ΕΠΊΤΕΥΞΗ ΤΩΝ ΣΤΌΧΩΝ ΕΝΕΡΓΕΙΑΚΉΣ ΑΠΌΔΟΣΗΣ ΤΟΥ ΥΠΌ ΕΞΈΤΑΣΗ ΚΤΙΡΊΟΥ, ΝΑΙ; ΠΡΟΕΤΟΊΜΑΣΕ ΈΝΑ ΣΥΓΚΕΚΡΙΜΈΝΟ ΈΡΓΟ ΤΟ ΟΠΟΊΟ ΑΡΘΡΏΝΕΤΑΙ ΣΎΜΦΩΝΑ ΜΕ ΤΑ ΑΚΌΛΟΥΘΑ ΠΕΡΙΕΧΌΜΕΝΑ.- ΦΩΤΙΣΤΙΚΆ: ΠΡΟΓΡΑΜΜΑΤΙΣΜΈΝΗ ΑΦΑΊΡΕΣΗ ΌΛΩΝ ΤΩΝ ΥΠΑΡΧΌΝΤΩΝ ΕΓΚΑΤΑΣΤΆΣΕΩΝ ΠΟΥ ΔΕΝ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΕΠΙΔΌΣΕΩΝ ΠΟΥ ΟΡΊΖΟΝΤΑΙ ΣΤΟ ΔΙΆΤΑΓΜΑ ΕΛΑΧΊΣΤΩΝ ΑΠΑΙΤΉΣΕΩΝ 26/06/2015· ΠΑΡΆΛΛΗΛΑ, ΘΑ ΠΡΟΧΩΡΉΣΟΥΜΕ; Στο POSA IN OPERA OF NEW WOOD SERVICES, ΜΕ ΧΑΛΥΤΕΡΟ ΑΠΑΓΟΡΕΥΤΙΚΟ ΓΥΑΛΙ-ΚΑΜΕΡΑ (BE), ΑΝΑΦΟΡΑ ΣΤΙΣ ΠΡΟΣΤΑΤΙΚΕΣ ΑΠΑΙΤΗΣΕΙΣ του Δ.Μ. 16.2.2016 (TERMICO CONTO 2.0) ΜΕ UW & AMP;LT; 1.67 W7MQ.K. ΕΓΚΑΤΆΣΤΑΣΗ ΘΑ ΣΥΜΒΕΊ; ΜΕ ΙΔΙΑΊΤΕΡΗ ΠΡΟΣΟΧΉ ΣΤΗ ΔΙΌΡΘΩΣΗ ΤΗΣ ΑΠΟΔΥΝΆΜΩΣΗΣ ΠΟΥ ΥΠΈΣΤΗ ΜΕ ΤΗΝ ΠΆΡΟΔΟ ΤΟΥ ΧΡΌΝΟΥ ΑΠΌ ΠΈΤΡΙΝΕΣ ΔΟΜΈΣ ΣΤΙΣ ΠΡΟΣΌΨΕΙΣ, ΈΤΣΙ; ΘΑ ΚΑΘΟΡΙΣΤΟΎΝ ΕΠΊΣΗΣ ΝΈΟΙ ΛΊΘΟΙ (ΌΠΟΥ ΥΠΆΡΧΟΥΝ) ΓΙΑ ΤΑ ΚΑΤΏΦΛΙΑ ΚΑΙ ΤΑ ΠΛΑΊΣΙΑ. Το VETRATE ΜΕ ΝΟΤΙΟ-ΣΤ-ΝΟΤΙΟ-ΝΟΤΙΟ-ΝΟΤΙΟ-SUD-OVEST ORIENTATION θα είναι ΕΠΙΛΕΓΜΕΝΗ ΕΠΙΣΚΟΠΗΣΗ (ΕΛΕΓΧΟΣ ΗΛΙΟΥ) ΜΕ ΓΥΑΛΙ SOLAR Fattor G, GL, N < 0.35.Η ΣΗΜΕΡΙΝΉ ΠΕΡΣΊΑ ΘΑ ΕΞΑΛΕΙΦΘΕΊ ΕΠΊΣΗΣ (Greek)
0 references
IN ORDER TO PURSUE THE ENERGY EFFICIENCY OBJECTIVES OF THE BUILDING UNDER CONSIDERATION, YES? PREPARED A SPECIFIC PROJECT THAT IS ARTICULATED ACCORDING TO THE FOLLOWING CONTENTS.- FIXTURES: PLANNED REMOVAL OF ALL EXISTING FIXTURES THAT DO NOT MEET THE PERFORMANCE REQUIREMENTS SET OUT IN THE DECREE MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, WILL WE PROCEED? At the POSA IN OPERA OF NEW WOOD SERVICES, WITH LOW-Emissive GLASS-CAMERA (BE), RESPONSANT TO THE PRESTATIONAL REQUIREMENTS OF D.M. 16.2.2016 (TERMICO CONTO 2.0) WITH UW < 1.67 W7MQ.K. INSTALLATION WILL OCCUR? WITH PARTICULAR ATTENTION TO THE CORRECTION OF THE WEAKENING SUFFERED OVER TIME BY STONE STRUCTURES ON THE FACADES, SO? NEW STONES (WHERE EXISTING) WILL ALSO BE LAID FOR THRESHOLDS AND FRAMES. The VETRATE WITH SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION WILL BE SELECTIVE REVIEW (SUN CONTROL VATTOR) WITH GLASS SOLAR FATTOR G, GL,N < 0.35.THE CURRENT PERSIA WILL ALSO BE ELIMINATED (English)
0.0359170824718503
0 references
PARA ALCANZAR LOS OBJETIVOS DE EFICIENCIA ENERGÉTICA DEL EDIFICIO CONSIDERADO, ¿SÍ? PREPARÓ UN PROYECTO ESPECÍFICO QUE SE ARTICULA DE ACUERDO CON LOS SIGUIENTES CONTENIDOS.- LUMINARIAS: RETIRADA PLANIFICADA DE TODOS LOS ACCESORIOS EXISTENTES QUE NO CUMPLAN LOS REQUISITOS DE RENDIMIENTO ESTABLECIDOS EN EL DECRETO DE REQUISITOS MÍNIMOS 26/06/2015; PARALELAMENTE, ¿VAMOS A PROCEDER? En la POSA EN OPERA DE NUEVOS SERVICIOS DE MUJERES, CON GLASS-CAMERA BAJO (BE), RESPONSANTE A LOS REQUISITOS prestacionales DEL D.M. 16.2.2016 (TERMICO CONTO 2.0) CON UW & AMP;LT; 1.67 W7MQ.K. LA INSTALACIÓN OCURRIRÁ? CON ESPECIAL ATENCIÓN A LA CORRECCIÓN DEL DEBILITAMIENTO SUFRIDO CON EL TIEMPO POR ESTRUCTURAS DE PIEDRA EN LAS FACHADAS, ASÍ? TAMBIÉN SE COLOCARÁN NUEVAS PIEDRAS (DONDE EXISTAN) PARA UMBRALES Y MARCOS. El VETRATO CON ORIENTACIÓN SOUTH-EST-SOUTH-SUD-OVEST SERÁ REVISTA SELECTIVA (IVADOR DE CONTROL SUN) CON GLASS SOLAR Fattor G, GL, N & AMP;LT; 0.35.LA PERSIA ACTUAL TAMBIÉN SERÁ ELIMINADA (Spanish)
0 references
ET SAAVUTADA VAADELDAVA HOONE ENERGIATÕHUSUSE EESMÄRKE, JAH? VALMISTAS ETTE KONKREETSE PROJEKTI, MIS ON LIIGENDATUD VASTAVALT JÄRGMISTELE CONTENTS.- RAKISTELE: KÕIGI SELLISTE OLEMASOLEVATE SEADMETE KAVANDATUD KÕRVALDAMINE, MIS EI VASTA DEKREEDI 26/06/2015 MIINIMUMNÕUETELE; KAS PARALLEELSELT JÄTKAME? UW & AMP;LT – UW & AMP;LT, UW & AMP;LT, UW & AMP;LT, UW & AMP;LT, UW & AMP;LT, UW & AMP;LT OSA juures UW & AMP;LT; 1.67 W7MQ.K. PAIGALDAMINE TOIMUB? PÖÖRATES ERILIST TÄHELEPANU AJA JOOKSUL FASSAADIDE KIVIKONSTRUKTSIOONIDE POOLT KANNATATUD NÕRGENEMISE KORRIGEERIMISELE, NII ET? KÜNNISTE JA RAAMIDE JAOKS KEHTESTATAKSE KA UUED KIVID (KUI NEED ON OLEMAS). VETRATE koos SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION on SELECTIVE REVIEW (SUN CONTROL VATTOR) koos GLASS SOLAR Fattor G, GL, N & AMP;LT; 0.35.THE PRAEGUNE PÄRSIA KÕRVALDATAKSE KA (Estonian)
0 references
JOTTA VOITAISIIN SAAVUTTAA TARKASTELTAVANA OLEVAN RAKENNUKSEN ENERGIATEHOKKUUSTAVOITTEET, KYLLÄ? VALMISTELLUT ERITYISEN HANKKEEN, JOKA ON NIVELLETTY SEURAAVIEN CONTENTS.-- VALAISIMIEN MUKAISESTI: KAIKKIEN SELLAISTEN OLEMASSA OLEVIEN KALUSTEIDEN SUUNNITELTU POISTAMINEN, JOTKA EIVÄT TÄYTÄ ASETUKSEN (EU) N:O 26/06/2015 VÄHIMMÄISVAATIMUKSIA; JATKAMMEKO SAMAAN AIKAAN? POSA IN OPERA OF NEW WOOD PALVELUT, jossa LOW-Emissive GLASS-CAMERA (BE), RESPONSANT to the prestational REQUIREMENTS OF D.M. 16.2.2016 (TERMICO CONTO 2.0) UW < 1.67 W7MQ.K. ASENNUS TAPAHTUU? KIINNITTÄEN ERITYISTÄ HUOMIOTA JULKISIVUJEN KIVIRAKENTEIDEN HEIKKENEMISEN KORJAAMISEEN, JOTEN? UUSIA KIVIÄ (JOS OLEMASSA) ASETETAAN MYÖS KYNNYKSILLE JA KEHYKSILLE. Koulutus, jossa on SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION WILL BE SELECTIVE REVIEW (SUN CONTROL VATTOR) with GLASS SOLAR Fattor G, GL, N & AMP;LT; 0.35.THE NYKYINEN PERSIA MYÖS ELIMINOIDAAN (Finnish)
0 references
AFIN DE POURSUIVRE LES OBJECTIFS D’EFFICACITÉ ÉNERGÉTIQUE DU BÂTIMENT CONSIDÉRÉ, OUI? PRÉPARATION D’UN PROJET SPÉCIFIQUE QUI EST ARTICULÉ SELON LES CONTENTS SUIVANTS.- LUMINAIRES: SUPPRESSION PRÉVUE DE TOUS LES APPAREILS EXISTANTS QUI NE RÉPONDENT PAS AUX EXIGENCES DE PERFORMANCE ÉNONCÉES DANS LE DÉCRET DU 26/06/2015; EN PARALLÈLE, ALLONS-NOUS PROCÉDER? Au POSA IN OPERA OF NEW WOOD SERVICES, AVEC LOW-Emissive GLASS-CAMERA (BE), RESPONSANT DES EXIGENCES DE D.M. 16.2.2016 (TERMICO CONTO 2.0) AVEC UW & 1.67 W7MQ.K. INSTALLATION AURA LIEU? AVEC UNE ATTENTION PARTICULIÈRE À LA CORRECTION DE L’AFFAIBLISSEMENT SUBI AU FIL DU TEMPS PAR LES STRUCTURES EN PIERRE SUR LES FAÇADES, DONC? DE NOUVELLES PIERRES (LE CAS ÉCHÉANT) SERONT ÉGALEMENT POSÉES POUR LES SEUILS ET LES CADRES. Le VETRATE AVEC L’ORIENTATION SUD-EST-SUD-OVEST SÉLECTIVE (TVATEUR DU CONTRÔLE DU SUN) AVEC GLASS SOLAR Fattor G, GL, N < 0.35.THE PERSE ACTUELLE SERA ÉGALEMENT ÉLIMINÉE (French)
0 references
D’FHONN CUSPÓIRÍ ÉIFEACHTÚLACHTA FUINNIMH AN FHOIRGNIMH ATÁ Á BHREITHNIÚ A SHAOTHRÚ, TÁ? D’ULLMHAIGH SÉ TIONSCADAL SONRACH A CHUIRTEAR IN IÚL I GCOMHRÉIR LEIS NA CONTENTS.- DAINGNEÁIN SEO A LEANAS: GO BHFUIL SÉ BEARTAITHE DEIREADH A CHUR LEIS NA DAINGNEÁIN UILE ATÁ ANN CHEANA NACH GCOMHLÍONANN NA CEANGLAIS FEIDHMÍOCHTA A LEAGTAR AMACH SAN FHORAITHNE MAIDIR LE HÍOSCHEANGLAIS 26/06/2015; AG AN AM CÉANNA, AN LEANFAIMID AR AGHAIDH? Ag an POSA IN OPERA NA SEIRBHÍSÍ WOOD NUA, le GLASS-CAMERA LOW-Emissive (BE), IARRATAS D.M. 16.2.2016 (Termico CONTO 2.0) LE UW & AMP;LT; 1.67 W7MQ.K. BEIDH SUITEÁIL TARLÚ? LE HAIRD AR LEITH AR CHEARTÚ AN LAGÚ A D’FHULAING STRUCHTÚIR CLOICHE AR NA FACADES LE HIMEACHT AMA, MAR SIN? LEAGFAR CLOCHA NUA (MÁS ANN DÓIBH) LE HAGHAIDH TAIRSEACHA AGUS FRÁMAÍ FREISIN. An Vetrate LE BHFUIL-EST-SOUTH-SUD-OVEST Oiriúnú ATHBHREITHNIÚ A DHÉANAMH A BHAINEANN LE GLASS SOLAR FATTOR G, GL, N < BEIDH 0.35.THE PERSIA ATÁ ANN FAOI LÁTHAIR A DHÍCHUR FREISIN (Irish)
0 references
KAKO BI SE OSTVARILI CILJEVI ENERGETSKE UČINKOVITOSTI PREDMETNE ZGRADE, DA? PRIPREMILI ODREĐENI PROJEKT KOJI JE ARTIKULIRAN U SKLADU SA SLJEDEĆIM KONTENTI.- ČVORA: PLANIRANO UKLANJANJE SVIH POSTOJEĆIH NAPRAVA KOJE NE ISPUNJAVAJU ZAHTJEVE U POGLEDU RADNIH KARAKTERISTIKA UTVRĐENE UREDBOM O MINIMALNIM ZAHTJEVIMA 26/06/2015; PARALELNO, HOĆEMO LI NASTAVITI? Na POSA IN OPERA NEW WOOD SERVICES, S LOW-Emisive GLASS-CAMERA (BE), RESPONSANT to the prestational REQUIREMENTS of D.M. 16.2.2016 (TERMICO CONTO 2.0) S UW & AMP;LT; 1.67 W7MQ.K. INSTALACIJA ĆE SE DOGODITI? S POSEBNOM POZORNOŠĆU NA ISPRAVLJANJE SLABLJENJA KOJE SU TIJEKOM VREMENA PRETRPJELE KAMENE STRUKTURE NA FASADAMA, TAKO? NOVI KAMENI (GDJE POSTOJE) TAKOĐER ĆE BITI POSTAVLJENI ZA PRAGOVE I OKVIRE. VETRATE S SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION će biti SELECTIVE REVIEW (SUN CONTROL VATTOR) S GLASS SOLAR Fattor G, GL, N & AMP;LT; SADAŠNJA PERZIJA TAKOĐER ĆE BITI ELIMINIRANA. (Croatian)
0 references
A VIZSGÁLT ÉPÜLET ENERGIAHATÉKONYSÁGI CÉLKITŰZÉSEINEK MEGVALÓSÍTÁSA ÉRDEKÉBEN IGEN? KÉSZÍTETT EGY KONKRÉT PROJEKTET, AMELY A KÖVETKEZŐ CONTENTS.- SZERELVÉNYEK SZERINT ARTIKULÁLT: MINDEN OLYAN MEGLÉVŐ SZERELVÉNY TERVEZETT ELTÁVOLÍTÁSA, AMELY NEM FELEL MEG A KORMÁNYRENDELETBEN MEGHATÁROZOTT MINIMÁLIS KÖVETELMÉNYEKNEK (26.06.2015.); EZZEL PÁRHUZAMOSAN FOLYTATJUK? A POSA IN OPERA OF ÚJ WOOD SERVICES, LOW-Emissive GLASS-CAMERA (BE), RESPONSANT a D.M. 16.2.2016 (TERMICO CONTO 2.0) prestacionális követelményeinek UW < 1.67 W7MQ.K. TELEPÍTÉS FOG TÖRTÉNNI? KÜLÖNÖS FIGYELMET FORDÍTVA A HOMLOKZATOK KŐSZERKEZETEI ÁLTAL IDŐVEL ELSZENVEDETT GYENGÜLÉS KORREKCIÓJÁRA, TEHÁT? ÚJ KÖVEKET (AHOL MÁR LÉTEZNEK) A KÜSZÖBÖKRE ÉS KERETEKRE IS MEG KELL HATÁROZNI. A VETRATE SOUTH-SOUTH-SUD-OVEST ORIENTATIONAL SELECTIVE REVIEW (SUN CONTROL VATTOR) és GLASS SOLAR Fattor G, GL, N < 0.35.A JELENLEGI PERZSIA IS MEGSZŰNIK (Hungarian)
0 references
SIEKIANT ĮGYVENDINTI APTARIAMO PASTATO ENERGIJOS VARTOJIMO EFEKTYVUMO TIKSLUS, TAIP? PARENGĖ KONKRETŲ PROJEKTĄ, KURIS YRA SUJUNGTAS PAGAL ŠIUOS CONTENTS.- ARMATŪRAS: PLANUOJAMAS VISŲ ESAMŲ ĮRENGINIŲ, NEATITINKANČIŲ DEKRETE NUSTATYTŲ MINIMALIŲ REIKALAVIMŲ NR. 26/06/2015, PAŠALINIMAS; TUO PAČIU METU, AR TĘSIME? 2016 m. vasario 16 d. (TERMICO CONTO 2.0) SU UW &LT NAUJŲ WOOD SERVICES OPERA OPERA PASLAUGOS, SU LOW-Emissive GLASS-CAMERA (BE), PASIŪLYMAS Į 2016 m. vasario 16 d. preliminarius reikalavimus (TERMICO CONTO 2.0); 1.67 W7MQ.K. MONTAVIMAS ĮVYKS? YPATINGĄ DĖMESĮ SKIRIANT SUSILPNĖJIMO, KURĮ LAIKUI BĖGANT PATYRĖ AKMENS KONSTRUKCIJOS ANT FASADŲ, KOREKCIJAI, TAIP? TAIP PAT BUS NUSTATYTI NAUJI AKMENYS (JEI YRA) SLENKSČIAMS IR RĖMAMS. VETRATE SU SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION bus SELECTIVE REVIEW (SUN CONTROL VATTOR) su SOLAR Fattor G, GL, N & AMP;LT; 0.35. DABARTINĖ PERSIJA TAIP PAT BUS PAŠALINTA (Lithuanian)
0 references
LAI SASNIEGTU ATTIECĪGĀS ĒKAS ENERGOEFEKTIVITĀTES MĒRĶUS, JĀ? SAGATAVOJA KONKRĒTU PROJEKTU, KAS IR ŠARNĪRVEIDA SASKAŅĀ AR ŠĀDIEM CONTENTS.- ĶERMEŅI: VISU TO ESOŠO ARMATŪRAS PLĀNOTO NOŅEMŠANU, KAS NEATBILST DEKRĒTA MINIMĀLAJĀM PRASĪBĀM 26/06/2015; PARALĒLI, VAI MĒS TURPINĀSIM? POSA IN OPERA OF NEW WOOD PARVICES, AR LOW-Emissive GLASS-CAMERA (BE), ATZINĪGI VĒRTĒ D.M. 16.2.2016. predikatīvās prasības (TERMICO CONTO 2.0) AR UW < 1.67 W7MQ.K. UZSTĀDĪŠANA NOTIKS? AR ĪPAŠU UZMANĪBU UZ KOREKCIJU VĀJINĀŠANĀS CIETA LAIKA GAITĀ AKMENS KONSTRUKCIJAS UZ FASĀDĒM, TĀ? JAUNI AKMEŅI (JA TĀDI IR) TIKS NOTEIKTI ARĪ SLIEKŠŅIEM UN RĀMJIEM. VETRATE ar SOUTH-EST-SUD-OVEST ORIENTATION būs SELECTIVE REVIEW (SUN CONTROL VATTOR) ar GLASS SOLAR Fattor G, GL,N < 0.35.THE PAŠREIZĒJĀ PERSIA TIKS LIKVIDĒTA ARĪ (Latvian)
0 references
SABIEX JINTLAĦQU L-OBJETTIVI TAL-EFFIĊJENZA ENERĠETIKA TAL-BINI LI QED JIĠI KKUNSIDRAT, IVA? IPPREPARA PROĠETT SPEĊIFIKU LI HUWA ARTIKOLAT SKONT IL-KONTENTS.- MUNTAĠĠI LI ĠEJJIN: IT-TNEĦĦIJA PPJANATA TAL-FIXTURES EŻISTENTI KOLLHA LI MA JISSODISFAWX IR-REKWIŻITI TA’ PRESTAZZJONI STABBILITI FID-DIGRIET DWAR IR-REKWIŻITI MINIMI 26/06/2015; B’MOD PARALLEL, SE NIPPROĊEDU? Fil-POSA F’OPERA TAS-SERVIZZI KONĠUNTA ĠODDA, B’GLASS-Emissivi LOW (BE), RIŻOLUZZJONIJIET GĦAR-REKWIŻI Prestazzjonali tad-D.M. 16.2.2016 (TERMICO CONTO 2.0) B’UW & AMP;LT; 1.67 W7MQ.K. INSTALLAZZJONI SE JSEĦĦU? B’ATTENZJONI PARTIKOLARI GĦALL-KORREZZJONI TAD-DGĦUFIJA MĠARRBA MATUL IŻ-ŻMIEN MILL-ISTRUTTURI TAL-ĠEBEL FUQ IL-FAĊĊATI, HEKK? SE JIĠU STABBILITI WKOLL ĠEBEL ĠDID (FEJN JEŻISTI) GĦAL-LIMITI U L-OQFSA. L-ETVRATE WITH SOUTH-SOUTH-SUD-OVEST ORIENTATION WILL BE REVIEW SELECTIVE (VAT TAS-SUN CONTROL) B’GLASS SOLAR Fattor G, GL, N & AMP;LT; IL-PERSJA ATTWALI SE TIĠI ELIMINATA WKOLL (Maltese)
0 references
OM DE ENERGIE-EFFICIËNTIEDOELSTELLINGEN VAN HET BETREFFENDE GEBOUW NA TE STREVEN, JA? EEN SPECIFIEK PROJECT VOORBEREID DAT IS OPGESTELD VOLGENS DE VOLGENDE CONTENTS.- ARMATUREN: GEPLANDE VERWIJDERING VAN ALLE BESTAANDE ARMATUREN DIE NIET VOLDOEN AAN DE PRESTATIE-EISEN VAN HET DECREET MINIMUMEISEN 26/06/2015; PARALLEL, GAAN WE VERDER? Op de POSA IN OPERA VAN NIEUWE WOOD SERVICES, MET LOW-Emissive GLASS-CAMERA (BE), RESPONSANT MET DE prestationele eisen van D.M. 16.2.2016 (TERMICO CONTO 2.0) MET UW < 1.67 W7MQ.K. INSTALLATIE ZAL PLAATSVINDEN? MET BIJZONDERE AANDACHT VOOR DE CORRECTIE VAN DE VERZWAKKING DIE IN DE LOOP VAN DE TIJD WERD GELEDEN DOOR STENEN STRUCTUREN OP DE GEVELS, DUS? ER ZULLEN OOK NIEUWE STENEN (INDIEN AANWEZIG) WORDEN GELEGD VOOR DREMPELS EN KOZIJNEN. De VETRATE met SOUTH-EST-SOUTH-SUD-OVEST ORIENTATIE ZAL SELECTIVE REVIEW (SUN CONTROL VATTOR) met GLASS SOLAR Fattor G, GL,N < 0.35.THE HUIDIGE PERZIË ZAL OOK WORDEN GEËLIMINEERD (Dutch)
0 references
A fim de prosseguir os objetivos de eficiência energética do edifício em análise, SIM? PREPARAÇÃO DE UM PROJECTO ESPECÍFICO ARTICULADO EM CONFORMIDADE COM O SEGUINTE CONTEÚDO.- FIXAÇÕES: REMOÇÃO PREVISTA DE TODAS AS FIXIDADES EXISTENTES QUE NÃO CUMPREM OS REQUISITOS DE DESEMPENHO PREVISTOS NOS REQUISITOS MÍNIMOS DECRETADOS 26/06/2015; Em paralelo, vamos avançar? Na POSA EM FUNÇÃO DE NOVOS SERVIÇOS DE MADEIRA, COM CÂMERA DE VIDRO DE BAIXA Emissividade (BE), RESPONSÁVEL PELOS REQUISITOS PRESTATIVOS DO D.M. 16.2.2016 (TERMICO CONTO 2.0) COM UW < 1.67 W7MQ.K. A INSTALAÇÃO SERÁ ACURADA? Com especial atenção à correção dos danos sofridos ao longo do tempo pelas estruturas de pedra nas fachadas, então? PEDRAS NOVAS (onde existirem) também serão colocadas para limões e franjas. O VETRATO COM ORIENTAÇÃO SOUTH-EST-SOUTH-SUD-OVEST SERÁ REVISÃO SELECTIVA (IVATOR DE CONTROLO DO SOL) COM FATOR SOLAR DE VIDRO G, GL, N < 0.35.A PERSIA ATUAL TAMBÉM SERÁ ELIMINADA (Portuguese)
0 references
PENTRU A URMĂRI OBIECTIVELE DE EFICIENȚĂ ENERGETICĂ ALE CLĂDIRII ÎN CAUZĂ, DA? A PREGĂTIT UN PROIECT SPECIFIC CARE ESTE ARTICULAT ÎN CONFORMITATE CU URMĂTOARELE CONTENTE.- CORPURI DE ILUMINAT: ELIMINAREA PLANIFICATĂ A TUTUROR INSTALAȚIILOR EXISTENTE CARE NU ÎNDEPLINESC CERINȚELE DE PERFORMANȚĂ PREVĂZUTE ÎN DECRETUL PRIVIND CERINȚELE MINIME 26/06/2015; ÎN PARALEL, VOM CONTINUA? La POSA IN OPERA OF NOW WOOD SERVICES, cu LOW-Emissive GLASS-CAMERA (BE), Responsabil la cerințele prestaționale ale D.M. 16.2.2016 (TERMICO CONTO 2.0) cu UW & AMP;LT; 1.67 W7MQ.K. INSTALARE VA AVEA LOC? CU O ATENȚIE DEOSEBITĂ LA CORECTAREA SLĂBIRII SUFERITĂ DE-A LUNGUL TIMPULUI DE STRUCTURILE DE PIATRĂ DE PE FAȚADE, AȘA? PIETRE NOI (ÎN CAZUL ÎN CARE EXISTĂ) VOR FI, DE ASEMENEA, STABILITE PENTRU PRAGURI ȘI CADRE. VETRATE CU SOUTH-EST-SUD-SUD-OVEST ORIENTARE VA fi REVIEW SELECTIV (TVATOR SUN CONTROL) cu GLASS SOLAR Fattor G, GL, N & AMP;LT; 0.35.PERSIA ACTUALĂ VA FI, DE ASEMENEA, ELIMINATĂ (Romanian)
0 references
S CIEĽOM DOSIAHNUŤ CIELE ENERGETICKEJ EFEKTÍVNOSTI POSUDZOVANEJ BUDOVY ÁNO? PRIPRAVIL ŠPECIFICKÝ PROJEKT, KTORÝ JE KĹBOVÝ PODĽA NASLEDUJÚCICH PRVKOV CONTENTS.-: PLÁNOVANÉ ODSTRÁNENIE VŠETKÝCH EXISTUJÚCICH ZARIADENÍ, KTORÉ NESPĹŇAJÚ VÝKONNOSTNÉ POŽIADAVKY STANOVENÉ VO VYHLÁŠKE O MINIMÁLNYCH POŽIADAVKÁCH 26/06/2015; PARALELNE, BUDEME POKRAČOVAŤ? V POSA IN OPERA OF NOVÉ WOOD SLUŽBY, S LOW-Emissive GLASS-CAMERA (BE), RESPONSANT NA PREŠTOVANIA D.M. 16.2.2016 (TERMICO CONTO 2.0) S UW & AMP;LT; 1.67 W7MQ.K. INŠTALÁCIA SA USKUTOČNÍ? S OSOBITNOU POZORNOSŤOU NA KOREKCIU OSLABENIA UTRPENÉHO V PRIEBEHU ČASU KAMENNÝMI ŠTRUKTÚRAMI NA FASÁDACH, TAK? NOVÉ KAMENE (AK EXISTUJÚ) BUDÚ POLOŽENÉ AJ PRE PRAHY A RÁMY. VETRATE S SOUTH-EST-SUD-SUD-OVEST ORIENTÁCIA bude SELECTIVE REVIEW (SUN CONTROL VATTOR) s GLASS SOLAR Fattor G, GL, N & AMP;LT; 0,35.THE SÚČASNÝ PERSIA BUDE TIEŽ ELIMINOVANÝ (Slovak)
0 references
DA BI DOSEGLI CILJE ENERGETSKE UČINKOVITOSTI OBRAVNAVANE STAVBE, DA? PRIPRAVIL POSEBEN PROJEKT, KI JE OBLIKOVAN V SKLADU Z NASLEDNJIMI CONTENTS.- NAPELJAVAMI: NAČRTOVANA ODSTRANITEV VSEH OBSTOJEČIH NAPRAV, KI NE IZPOLNJUJEJO ZAHTEV GLEDE ZMOGLJIVOSTI, DOLOČENIH V UREDBI O MINIMALNIH ZAHTEVAH 26/06/2015; ALI BOMO VZPOREDNO NADALJEVALI? Na POSA IN OPERA NOVIH WOOD SERVICES, Z LOW-Emisivno GLASS-CAMERA (BE), OPOZORILO na pretacijske zahteve iz D.M. 16.2.2016 (TERMICO CONTO 2.0) Z UW & AMP;LT; 1.67 W7MQ.K. BO PRIŠLO DO NAMESTITVE? S POSEBNO POZORNOSTJO NA KOREKCIJO OSLABITVE, KI SO JO SČASOMA UTRPELE KAMNITE STRUKTURE NA FASADAH, TOREJ? NOVI KAMNI (KJER OBSTAJAJO) BODO POSTAVLJENI TUDI ZA PRAGOVE IN OKVIRJE. VETRATE S SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION BO SELECTIVE REVIEW (SUN CONTROL VATTOR) z GLASS SOLAR Fattor G, GL, N & AMP;LT; 0,35.THE TRENUTNA PERZIJA BO PRAV TAKO ODPRAVLJENA (Slovenian)
0 references
FÖR ATT UPPNÅ ENERGIEFFEKTIVITETSMÅLEN FÖR DEN BERÖRDA BYGGNADEN, JA? FÖRBEREDDE ETT SPECIFIKT PROJEKT SOM ÄR FORMULERAT ENLIGT FÖLJANDE CONTENTS.- FIXTURER: PLANERAT AVLÄGSNANDE AV ALLA BEFINTLIGA INVENTARIER SOM INTE UPPFYLLER DE PRESTANDAKRAV SOM ANGES I DEKRETETS MINIMIKRAV 26/06/2015. PARALLELLT, KOMMER VI ATT FORTSÄTTA? At the POSA IN OPERA OF NEW WOOD SERVICES, WITH LOW-Emissive GLASS-CAMERA (BE), RESPONSANT to the prestationella krav från D.M. 16.2.2016 (TERMICO CONTO 2.0) med UW & AMP;LT; 1.67 W7MQ.K. INSTALLATION KOMMER ATT SKE? MED SÄRSKILD UPPMÄRKSAMHET PÅ KORRIGERINGEN AV DEN FÖRSVAGNING SOM MED TIDEN LIDIT AV STENKONSTRUKTIONER PÅ FASADERNA, SÅ? NYA STENAR (DÄR SÅDANA FINNS) KOMMER OCKSÅ ATT LÄGGAS FÖR TRÖSKLAR OCH RAMAR. VETRATE MED SOUTH-EST-SOUTH-SUD-OVEST ORIENTATION SELECTIVE REVIEW (SUN CONTROL VATTOR) med GLASS SOLAR Fattor G, GL,N < 0,35.THE NUVARANDE PERSIEN KOMMER OCKSÅ ATT ELIMINERAS (Swedish)
0 references
PRATO
0 references
10 April 2023
0 references