Modernisation of infrastructure electrical installation Moinesti Municipal Emergency Hospital (Q4609388)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q4609388 in Romania
Language Label Description Also known as
English
Modernisation of infrastructure electrical installation Moinesti Municipal Emergency Hospital
Project Q4609388 in Romania

    Statements

    0 references
    9,898,800.0 Romanian Leu
    0 references
    1,979,760.0 Euro
    0 references
    9,898,800.0 Romanian Leu
    0 references
    1,979,760.0 Euro
    0 references
    100.0 percent
    0 references
    1 September 2021
    0 references
    31 December 2023
    0 references
    u.a.t. municipiul moineşti
    0 references
    0 references

    44°25'31.91"N, 26°0'54.32"E
    0 references
    OBIECTIVUL GENERAL al proiectului „Modernizare infrastructură instalație electrică Spitalul Municipal de Urgență Moinești” este acela de a crește capacitatea de furnizare a serviciilor medicale optime în contextul răspândirii virusului SARS-CoV-2, asigurând un nivel ridicat de siguranță. Potrivit aspectelor reiesite din cadrul documentatiei tehnico-economice, instalația electrică existenta din toate corpurile de clădiri ale Spitalului Municipal de Urgenta Moinesti, prezintă un grad avansat de uzură datorat atât perioadei îndelungate de utilizare cât si a consumului actual crescut de energie prin suplimentarea consumatorilor. Din aceste motive, instalația electrică existentă este subdimensionată, nu corespunde normelor tehnice actuale și astfel nu este posibilă asigurarea funcționării în condiții de siguranță ceea ce poate conduce oricând la declanșarea unui incediu. Odată cu implementarea acestui proiect se elimină, pe de o parte, acest pericol, iar pe de altă parte intervenția determina o optimizare a modului în care sunt îngrijiți și tratați pacienții infectați cu virusul SARS-CoV-2. In acest fel, prin prezentul proiect de modernizare a instalatiilor electrice ale cladirilor in care functioneaza Spitalul Municipal de Urgenta Moinesti – structura spitaliceasca publica- se asigura un răspuns în timp util și eficient al sistemului medical public din municipiul Moinesti la criza COVID – 19. Referitor la indicatorul de rezultat 2S132 „Capacitate adecvată de îngrijire și tratament a cazurilor de infecție cu virusul SARS-CoV-2/de gestionare a crizei sanitare” situația existentă și cea preconizată a îndeplinirii acestui indicator în cazul SMUM, este: - Înainte de intervenția POIM: NU - Ulterior intervenției POIM: DA. Deci, proiectul contribuie la atingerea indicatorului de rezultat al programului, respectiv 2S132 „Capacitate adecvată de îngrijire și tratament a cazurilor de infecție cu virusul SARS-CoV-2/de gestionare a crizei sanitare” prin intervenții menite sa dezvolte capacitatea de asigurare a serviciilor medicale si prin includerea unor metode alternative de alimentare a consumatorilor cu energie electrică sporind astfel capacitatea Spitalului Municipal de Urgenta Moinesti de gestionare a contextului pandemic si de ingrijire optima a pacienților sai. (Romanian)
    0 references
    El objetivo general del proyecto «Modernización de la instalación eléctrica de la infraestructura del Hospital Municipal de Emergencia de Moinesti» es aumentar la capacidad de prestación de servicios médicos óptimos en el contexto de la propagación del virus SARS-CoV-2, garantizando un alto nivel de seguridad. De acuerdo con los aspectos de la documentación técnica y económica, la instalación eléctrica existente en todos los edificios del Hospital Municipal de Emergencia Moinesti tiene un grado avanzado de desgaste debido tanto al largo período de uso como al aumento actual del consumo de energía al complementar a los consumidores. Por estas razones, la instalación eléctrica existente está subdimensionada, no cumple con las normas técnicas actuales y, por lo tanto, no es posible garantizar un funcionamiento seguro que pueda provocar un incendio en cualquier momento. Con la implementación de este proyecto, se elimina este peligro, por un lado, y por otro, la intervención conduce a una optimización de la forma en que los pacientes infectados con el virus SARS-CoV-2 son atendidos y tratados. De esta manera, a través del presente proyecto de modernización de las instalaciones eléctricas de los edificios en los que opera el Hospital Municipal de Emergencias de Moinesti -la estructura hospitalaria pública- se asegura una respuesta oportuna y eficiente del sistema médico público en el municipio de Moinesti a la crisis del COVID-19. Por lo que se refiere al indicador de resultados 2S132 «Capacidad adecuada de atención y tratamiento para los casos de gestión de crisis sanitarias SARS-CoV-2/», el cumplimiento actual y previsto de este indicador para SMUM es: — Antes de la intervención LIOP: No — Después de la intervención LIOP: SÍ, SÍ. Por lo tanto, el proyecto contribuye a lograr el indicador de resultados del programa, a saber, 2S132 «Capacidad adecuada de atención y tratamiento para casos de infección por SARS-CoV-2/gestión de crisis sanitarias» a través de intervenciones destinadas a desarrollar la capacidad de prestación de servicios médicos e incluir métodos alternativos de suministro de electricidad a los consumidores aumentando así la capacidad del Hospital Municipal de Emergencias de Moinesti para gestionar el contexto pandémico y la atención óptima de sus pacientes. (Spanish)
    0 references
    A „Moinesti városi sürgősségi kórház infrastruktúrájának korszerűsítése” elnevezésű projekt általános célja a SARS-CoV-2 vírus terjedésével összefüggésben az optimális orvosi szolgáltatások nyújtásának kapacitásának növelése, magas szintű biztonságot biztosítva. A műszaki és gazdasági dokumentáció szempontjai szerint a Moinesti Sürgősségi Városi Kórház összes épületében a meglévő elektromos berendezés a hosszú használati idő és a fogyasztók kiegészítésével megnövekedett energiafogyasztás miatt fejlett mértékű kopás. Emiatt a meglévő elektromos berendezés méreten alul van, nem felel meg a jelenlegi műszaki szabványoknak, és így nem biztosítható a biztonságos működés, amely bármikor tűzhöz vezethet. A projekt megvalósításával ez a veszély egyrészt megszűnik, másrészt a beavatkozás a SARS-CoV-2 vírussal fertőzött betegek gondozásának és kezelésének optimalizálásához vezet. Ily módon a Moinesti Városi Sürgősségi Kórházban működő épületek elektromos berendezéseinek korszerűsítésére irányuló jelenlegi projekt révén – az állami kórházi struktúra – biztosítja Moinesti település állami egészségügyi rendszerének időben történő és hatékony reagálását a Covid-válságra. A 2S132 „Megfelelő gondozási és kezelési kapacitás a SARS-CoV-2/egészségügyi válságkezelés eseteiben” eredménymutató tekintetében e mutató jelenlegi és várható teljesítése a következő: A LIOP beavatkozás előtt: Nem – A LIOP beavatkozás után: IGEN, IGEN, IGEN. Ezért a projekt hozzájárul a program eredménymutatójának eléréséhez, nevezetesen a 2S132 „Megfelelő ellátás és kezelési kapacitás a SARS-CoV-2/egészségügyi válságkezeléssel való fertőzöttség esetén” olyan beavatkozások révén, amelyek célja az orvosi szolgáltatások nyújtásának kapacitásának fejlesztése, és alternatív módszerek bevezetése a fogyasztók villamosenergia-ellátására, ezáltal növelve a Moinesti Városi Sürgősségi Kórház kapacitását a pandémiás körülmények kezelésére és a betegek optimális ellátására. (Hungarian)
    0 references
    The general objective of the project “Modernisation of infrastructure electrical installation Moinesti Municipal Emergency Hospital” is to increase the capacity to provide optimal medical services in the context of the spread of SARS-CoV-2 virus, ensuring a high level of safety. According to the aspects of the technical and economic documentation, the existing electrical installation in all buildings of the Moinesti Emergency Municipal Hospital has an advanced degree of wear due to both the long period of use and the current increased energy consumption by supplementing consumers. For these reasons, the existing electrical installation is undersised, does not comply with current technical standards and thus it is not possible to ensure safe operation which can lead to a fire at any time. With the implementation of this project, this danger is eliminated, on the one hand, and on the other hand, the intervention leads to an optimisation of the way in which patients infected with SARS-CoV-2 virus are cared for and treated. In this way, through the present project to modernise the electrical installations of the buildings in which the Moinesti Municipal Emergency Hospital operates — the public hospital structure — ensures a timely and efficient response of the public medical system in the municipality of Moinesti to the COVID crisis — 19. As regards the result indicator 2S132 ‘Appropriate care and treatment capacity for cases of SARS-CoV-2/health crisis management’, the existing and expected fulfilment of this indicator for SMUM is: — Before LIOP intervention: No — After the LIOP intervention: YES, YES. Therefore, the project contributes to achieving the result indicator of the program, namely 2S132 “Appropriate care and treatment capacity for cases of infection with SARS-CoV-2/health crisis management” through interventions aimed at developing the capacity to provide medical services and by including alternative methods of supplying consumers with electricity thus increasing the capacity of the Moinesti Municipal Emergency Hospital to manage the pandemic context and optimal care of its patients. (English)
    0.8106418650352466
    0 references
    Projekta “Infrastruktūras elektroinstalācijas Moinesti pašvaldības ārkārtas slimnīcas modernizācija” vispārējais mērķis ir palielināt spēju nodrošināt optimālus medicīniskos pakalpojumus SARS-CoV-2 vīrusa izplatīšanās kontekstā, nodrošinot augstu drošības līmeni. Saskaņā ar tehniskās un ekonomiskās dokumentācijas aspektiem esošās elektroinstalācijas visās Moinesti avārijas pašvaldības slimnīcas ēkās ir paaugstinātas nodiluma pakāpes dēļ gan ilgstošas lietošanas, gan pašreizējā palielinātā enerģijas patēriņa dēļ, papildinot patērētājus. Šo iemeslu dēļ esošā elektroiekārta ir pārāk maza, neatbilst pašreizējiem tehniskajiem standartiem un tādējādi nav iespējams nodrošināt drošu ekspluatāciju, kas var izraisīt ugunsgrēku jebkurā laikā. Īstenojot šo projektu, šis apdraudējums tiek novērsts, no vienas puses, un, no otras puses, iejaukšanās noved pie tā, kā ar SARS-CoV-2 vīrusu inficētie pacienti tiek aprūpēti un ārstēti. Šādā veidā, izmantojot šo projektu par elektroinstalāciju modernizēšanu ēkās, kurās darbojas Moinesti pašvaldības ārkārtas slimnīca — publiskās slimnīcas struktūra — nodrošina Moinesti pašvaldības publiskās medicīnas sistēmas savlaicīgu un efektīvu reakciju uz Covid krīzi — 19. Attiecībā uz rezultātu rādītāju 2S132 “Pienācīga aprūpes un ārstēšanas spēja SARS-CoV-2/veselības krīzes pārvarēšanas gadījumos” pašreizējā un gaidāmā SMUM rādītāja izpilde ir šāda: — Pirms LIOP iejaukšanās: Nē — pēc LIOP iejaukšanās: JĀ, JĀ. Tāpēc projekts palīdz sasniegt programmas rezultātu rādītāju, proti, 2S132 “Pienācīgas aprūpes un ārstēšanas spējas SARS-CoV-2/veselības krīzes pārvarēšanas gadījumos”, izmantojot intervences pasākumus, kuru mērķis ir attīstīt spēju sniegt medicīniskos pakalpojumus, un iekļaujot alternatīvas metodes patērētāju apgādei ar elektroenerģiju, tādējādi palielinot Moinesti pašvaldības ārkārtas slimnīcas spēju pārvaldīt pandēmijas kontekstu un optimālu pacientu aprūpi. (Latvian)
    0 references
    Projekti „Infrastruktuuri elektripaigaldise Moinesti munitsipaalhaigla moderniseerimine“ üldeesmärk on suurendada SARS-CoV-2 viiruse leviku kontekstis optimaalsete meditsiiniteenuste osutamise suutlikkust, tagades kõrge ohutustaseme. Vastavalt tehnilise ja majandusliku dokumentatsiooni aspektidele on Moinesti erakorralise munitsipaalhaigla kõigis hoonetes olemasoleval elektripaigaldisel täiustatud kulumisaste, mis on tingitud nii pikaajalisest kasutusajast kui ka praegusest suurenenud energiatarbimisest, täiendades tarbijaid. Nendel põhjustel on olemasolev elektripaigaldis alamõõduline, ei vasta kehtivatele tehnilistele standarditele ja seega ei ole võimalik tagada ohutut käitamist, mis võib igal ajal põhjustada tulekahju. Selle projekti rakendamisega kõrvaldatakse see oht ühelt poolt ja teiselt poolt toob sekkumine kaasa SARS-CoV-2 viirusega nakatunud patsientide ravimise ja ravi optimeerimise. Sel viisil tagab Moinesti munitsipaalhaigla käitatavate hoonete elektripaigaldiste ajakohastamise projekt – avalik-õiguslik haiglastruktuur – Moinesti omavalitsusüksuse riikliku meditsiinisüsteemi õigeaegse ja tõhusa reageerimise COVIDi kriisile – 19. Tulemusnäitaja 2S132 „Asjakohane ravi- ja ravisuutlikkus SARS-CoV-2/tervisekriisiohje korral“ puhul on SMUMi näitaja praegune ja eeldatav täitmine järgmine: – Enne LIOP sekkumist: Ei – pärast LIOP sekkumist: JAH, JAH. Seetõttu aitab projekt saavutada programmi tulemusnäitajat 2S132 „Asjakohane ravi- ja ravisuutlikkus SARS-CoV-2/tervisekriisiohje juhtumite korral“, sekkumiste kaudu, mille eesmärk on arendada meditsiiniteenuste osutamise suutlikkust ja kaasata alternatiivseid meetodeid tarbijate varustamiseks elektrienergiaga, suurendades seega Moinesti munitsipaalhaigla suutlikkust pandeemiaga toime tulla ja patsientide optimaalset hooldamist. (Estonian)
    0 references
    L'obiettivo generale del progetto "Modernizzazione dell'impianto elettrico infrastrutturale Moinesti Municipal Emergency Hospital" è quello di aumentare la capacità di fornire servizi medici ottimali nel contesto della diffusione del virus SARS-CoV-2, garantendo un elevato livello di sicurezza. Secondo gli aspetti della documentazione tecnica ed economica, l'impianto elettrico esistente in tutti gli edifici dell'Ospedale Comunale di Emergenza Moinesti ha un grado di usura avanzato sia per il lungo periodo di utilizzo che per l'attuale aumento del consumo energetico, integrando i consumatori. Per questi motivi, l'impianto elettrico esistente è sottodimensionato, non è conforme alle attuali norme tecniche e quindi non è possibile garantire un funzionamento sicuro che possa provocare un incendio in qualsiasi momento. Con l'attuazione di questo progetto, questo pericolo viene eliminato, da un lato, e dall'altro, l'intervento porta ad un'ottimizzazione del modo in cui i pazienti infettati dal virus SARS-CoV-2 sono curati e curati. In questo modo, attraverso il presente progetto di ammodernamento degli impianti elettrici degli edifici in cui opera l'Ospedale Comunale di Emergenza Moinesti — la struttura ospedaliera pubblica — assicura una risposta tempestiva ed efficiente del sistema medico pubblico nel comune di Moinesti alla crisi COVID-19. Per quanto riguarda l'indicatore di risultato 2S132 "Appropriate care and treatment capacity for case of SARS-CoV-2/health crisis management", l'attuale e atteso adempimento di questo indicatore per lo SMUM è: — Prima dell'intervento LIOP: No — Dopo l'intervento LIOP: SÌ, SÌ. Pertanto, il progetto contribuisce al raggiungimento dell'indicatore di risultato del programma, vale a dire 2S132 "Appropriate cure e capacità di trattamento per i casi di infezione da SARS-CoV-2/health crisis management" attraverso interventi volti a sviluppare la capacità di fornire servizi medici e includendo metodi alternativi di fornitura di energia elettrica ai consumatori aumentando così la capacità del Moinesti Municipal Emergency Hospital di gestire il contesto pandemico e la cura ottimale dei propri pazienti. (Italian)
    0 references
    Obecným cílem projektu „Modernizace infrastruktury elektrické instalace Moinesti Municipal Emergency Hospital“ je zvýšit kapacitu pro poskytování optimálních zdravotnických služeb v souvislosti s šířením viru SARS-CoV-2 a zajistit vysokou úroveň bezpečnosti. Podle aspektů technické a ekonomické dokumentace má stávající elektrická instalace ve všech budovách Nouzové nemocnice Moinesti pokročilý stupeň opotřebení, a to jak z důvodu dlouhé doby užívání, tak i současné zvýšené spotřeby energie doplněním spotřebitelů. Z těchto důvodů je stávající elektrická instalace podhodnocena, není v souladu s aktuálními technickými normami, a proto není možné zajistit bezpečný provoz, který může kdykoli vést k požáru. S realizací tohoto projektu je toto nebezpečí na jedné straně eliminováno a na druhé straně intervence vede k optimalizaci způsobu, jakým jsou pacienti infikovaní virem SARS-CoV-2 léčeni a léčeni. Tímto způsobem prostřednictvím stávajícího projektu modernizace elektrických zařízení budov, v nichž působí Městská záchranná nemocnice Moinesti – veřejné nemocniční struktury – zajišťuje včasnou a účinnou reakci veřejného zdravotnického systému v obci Moinesti na krizi COVID-19. Pokud jde o ukazatel výsledků 2S132 „Apropriate care and treatment capacity for cases of SARS-CoV-2/health crisis management“ (Vhodná kapacita péče a léčby v případech SARS-CoV-2/zdravotní krizové řízení), stávajícím a očekávaným plněním tohoto ukazatele pro SMUM je: — Před zásahem LIOP: Ne – Po zásahu LIOP: ANO, ANO, ANO. Projekt proto přispívá k dosažení ukazatele výsledků programu, konkrétně 2S132 „Vhodná péče a léčebná kapacita pro případy infekce SARS-CoV-2/zdravotní krizové řízení“ prostřednictvím intervencí zaměřených na rozvoj kapacity pro poskytování lékařských služeb a zahrnutím alternativních metod zásobování spotřebitelů elektřinou, čímž se zvýší kapacita Městské záchranné nemocnice Moinesti pro řízení kontextu pandemie a optimální péče o své pacienty. (Czech)
    0 references
    Det overordnede mål med projektet "Modernisering af infrastrukturel installation Moinesti Municipal Emergency Hospital" er at øge kapaciteten til at levere optimale medicinske tjenester i forbindelse med spredningen af SARS-CoV-2 virus, hvilket sikrer et højt sikkerhedsniveau. Ifølge aspekterne af den tekniske og økonomiske dokumentation har den eksisterende elektriske installation i alle bygninger på Moinesti Emergency Kommunalhospitalet en høj grad af slid på grund af både den lange anvendelsesperiode og det nuværende øgede energiforbrug ved at supplere forbrugerne. Af disse grunde er den eksisterende elektriske installation undervurderet, ikke overholder de nuværende tekniske standarder, og det er derfor ikke muligt at sikre sikker drift, der kan føre til brand på noget tidspunkt. Med gennemførelsen af dette projekt elimineres denne fare på den ene side, og på den anden side fører interventionen til en optimering af den måde, hvorpå patienter smittet med SARS-CoV-2-virus plejes og behandles. På denne måde sikrer det nuværende projekt om modernisering af elinstallationerne i de bygninger, hvor Moinesti kommunale akuthospital opererer — den offentlige hospitalsstruktur — en rettidig og effektiv reaktion fra det offentlige sundhedssystem i Moinesti kommune på covid-krisen — 19. For så vidt angår resultatindikator 2S132 "Tilpassende pleje- og behandlingskapacitet i tilfælde af SARS-CoV-2/sundhedskrisestyring" er den eksisterende og forventede opfyldelse af denne indikator for SMUM: — Før LIOP-interventionen: Nej — Efter LIOP-interventionen: JA, JA. Projektet bidrager derfor til at opnå programmets resultatindikator, nemlig 2S132 "Tilpassende pleje- og behandlingskapacitet i tilfælde af infektion med SARS-CoV-2/sundhedskrisestyring" gennem interventioner, der har til formål at udvikle kapaciteten til at levere medicinske tjenester og ved at medtage alternative metoder til at forsyne forbrugerne med elektricitet og dermed øge kapaciteten på Moinesti kommunale akuthospital til at styre den pandemiske kontekst og optimal pleje af sine patienter. (Danish)
    0 references
    Splošni cilj projekta „Posodobitev infrastrukture električne inštalacije Moinesti Mestna urgentna bolnišnica“ je povečati zmogljivosti za zagotavljanje optimalnih zdravstvenih storitev v okviru širjenja virusa SARS-CoV-2, kar zagotavlja visoko raven varnosti. Glede na vidike tehnične in ekonomske dokumentacije ima obstoječa električna napeljava v vseh stavbah urgentne bolnišnice Moinesti visoko stopnjo obrabe zaradi dolge uporabe in sedanje povečane porabe energije z dopolnjevanjem potrošnikov. Zaradi tega je obstoječa električna napeljava podmerna, ni v skladu z veljavnimi tehničnimi standardi in zato ni mogoče zagotoviti varnega delovanja, ki bi lahko kadar koli povzročilo požar. Z izvedbo tega projekta se ta nevarnost po eni strani odpravi, po drugi strani pa intervencija vodi k optimizaciji načina oskrbe in zdravljenja bolnikov, okuženih z virusom SARS-CoV-2. Na ta način s sedanjim projektom posodobitve električnih inštalacij stavb, v katerih deluje Mestna urgentna bolnišnica Moinesti – javna bolnišnica – zagotavlja pravočasen in učinkovit odziv javnega zdravstvenega sistema v občini Moinesti na krizo zaradi COVID-19. V zvezi s kazalnikom rezultatov 2S132 „Ustrezna zmogljivost oskrbe in zdravljenja za primere kriznega upravljanja SARS-CoV-2/zdravstveno upravljanje“ je obstoječa in pričakovana izpolnitev tega kazalnika za SMUM: — Pred posredovanjem LIOP: Ne – po intervenciji LIOP: JA, JA. Zato projekt prispeva k doseganju kazalnika rezultatov programa, in sicer 2S132 „Ustrezna zmogljivost oskrbe in zdravljenja v primerih okužbe s SARS-CoV-2/zdravstvenim kriznim upravljanjem“, in sicer z intervencijami, namenjenimi razvoju zmogljivosti za zagotavljanje zdravstvenih storitev in z vključitvijo alternativnih metod oskrbe odjemalcev z električno energijo, s čimer se poveča zmogljivost občinske urgentne bolnišnice Moinesti za obvladovanje pandemije in optimalno oskrbo njenih pacientov. (Slovenian)
    0 references
    Bendras projekto „Infrastruktūros elektros instaliacijos Moinesti savivaldybės skubios pagalbos ligoninės modernizavimas“ tikslas – padidinti pajėgumus teikti optimalias medicinos paslaugas SARS-CoV-2 viruso plitimo kontekste, užtikrinant aukštą saugos lygį. Remiantis techninės ir ekonominės dokumentacijos aspektais, esama elektros instaliacija visuose Moinesti avarinės savivaldybės ligoninės pastatuose turi aukštą nusidėvėjimo laipsnį dėl ilgo naudojimo laikotarpio ir dėl dabartinio padidėjusio energijos suvartojimo papildant vartotojus. Dėl šių priežasčių esamas elektros įrenginys yra nepakankamai įrengtas, neatitinka dabartinių techninių standartų, todėl neįmanoma užtikrinti saugaus eksploatavimo, dėl kurio bet kuriuo metu gali kilti gaisras. Įgyvendinus šį projektą, šis pavojus pašalinamas, kita vertus, intervencija leidžia optimizuoti SARS-CoV-2 virusu užsikrėtusių pacientų priežiūrą ir gydymą. Tokiu būdu šiuo projektu, kuriuo siekiama modernizuoti pastatų, kuriuose veikia Moinesti savivaldybės skubios pagalbos ligoninė (viešosios ligoninės struktūra), elektros įrenginius, užtikrinama, kad Moinesti savivaldybės viešoji medicinos sistema laiku ir veiksmingai reaguotų į COVID krizę – 19. Kalbant apie rezultatų rodiklį 2S132 „Tinkamas sveikatos priežiūros ir gydymo pajėgumas SARS-CoV-2/sveikatos krizių valdymo atvejais“, dabartinis ir numatomas šio SMUM rodiklio įgyvendinimas yra toks: – Prieš LIOP intervenciją: Ne – po LIOP intervencijos: TAIP, TAIP. Todėl projektas padeda pasiekti programos rezultatų rodiklį, t. y. 2S132 „Tinkamas sveikatos priežiūros ir gydymo pajėgumas SARS-CoV-2/sveikatos krizių valdymo atvejais“ intervencijomis, kuriomis siekiama plėtoti gebėjimą teikti medicinos paslaugas ir įtraukti alternatyvius elektros energijos tiekimo vartotojams metodus, taip padidinant Moinesti savivaldybės skubios pagalbos ligoninės pajėgumą valdyti pandemijos kontekstą ir optimalią pacientų priežiūrą. (Lithuanian)
    0 references
    L-objettiv ġenerali tal-proġett “Modernizzazzjoni tal-installazzjoni elettrika tal-infrastruttura tal-Isptar ta’ Emerġenza Muniċipali Moinesti” huwa li tiżdied il-kapaċità li jiġu pprovduti servizzi mediċi ottimali fil-kuntest tat-tixrid tal-virus tas-SARS-CoV-2 li jiżgura livell għoli ta’ sikurezza. Skont l-aspetti tad-dokumentazzjoni teknika u ekonomika, l-installazzjoni elettrika eżistenti fil-binjiet kollha tal-Isptar Muniċipali ta’ Emerġenza Moinesti għandha livell avvanzat ta’ xedd kemm minħabba l-perjodu twil ta’ użu kif ukoll minħabba l-konsum tal-enerġija attwali miżjud billi tissupplimenta lill-konsumaturi. Għal dawn ir-raġunijiet, l-installazzjoni elettrika eżistenti hija baxxa wisq, ma tikkonformax mal-istandards tekniċi attwali u għalhekk mhuwiex possibbli li jiġi żgurat tħaddim sikur li jista’ jwassal għal nar fi kwalunkwe ħin. Bl-implimentazzjoni ta’ dan il-proġett, dan il-periklu jiġi eliminat, minn naħa, u min-naħa l-oħra, l-intervent iwassal għal ottimizzazzjoni tal-mod li bih il-pazjenti infettati bil-virus tas-SARS-CoV-2 jiġu kkurati u kkurati. B’dan il-mod, permezz tal-proġett preżenti għall-immodernizzar tal-installazzjonijiet elettriċi tal-bini li fih jopera l-Isptar ta’ Emerġenza Muniċipali ta’ Moinesti — l-istruttura tal-isptarijiet pubbliċi — jiżgura rispons f’waqtu u effiċjenti tas-sistema medika pubblika fil-muniċipalità ta’ Moinesti għall-kriżi tal-COVID-19. Fir-rigward tal-indikatur tar-riżultat 2S132 “Kapaċità xierqa għall-kura u t-trattament għall-każijiet ta’ SARS-CoV-2/ġestjoni tal-kriżi tas-saħħa”, l-issodisfar eżistenti u mistenni ta’ dan l-indikatur għall-SMUM huwa: — Qabel l-intervent LIOP: Le — Wara l-intervent LIOP: IVA, IVA. Għalhekk, il-proġett jikkontribwixxi għall-kisba tal-indikatur tar-riżultati tal-programm, jiġifieri 2S132 “Kura xierqa u kapaċità ta’ trattament għal każijiet ta’ infezzjoni bis-SARS-CoV-2/ġestjoni tal-kriżi tas-saħħa” permezz ta’ interventi mmirati lejn l-iżvilupp tal-kapaċità li jiġu pprovduti servizzi mediċi u billi jiġu inklużi metodi alternattivi ta’ forniment tal-elettriku lill-konsumaturi u b’hekk tiżdied il-kapaċità tal-Isptar ta’ Emerġenza Muniċipali ta’ Moinesti biex jimmaniġġja l-kuntest tal-pandemija u l-kura ottimali tal-pazjenti tiegħu. (Maltese)
    0 references
    Общата цел на проекта „Модернизиране на инфраструктурната електрическа инсталация Монести Общинска спешна болница“ е да се увеличи капацитетът за предоставяне на оптимални медицински услуги в контекста на разпространението на вируса SARS-CoV-2, като се гарантира високо ниво на безопасност. Според аспектите на техническата и икономическата документация, съществуващата електрическа инсталация във всички сгради на Общинска болница Мойнсти има напреднала степен на износване както поради дългия период на употреба, така и поради настоящото увеличено потребление на енергия чрез допълване на потребителите. Поради тези причини съществуващата електрическа инсталация е маломерна, не отговаря на настоящите технически стандарти и следователно не е възможно да се осигури безопасна работа, която може да доведе до пожар по всяко време. С изпълнението на този проект тази опасност се елиминира, от една страна, а от друга страна, интервенцията води до оптимизиране на начина, по който пациентите, заразени с вируса SARS-CoV-2, се грижат и лекуват. По този начин чрез настоящия проект за модернизиране на електрическите инсталации на сградите, в които функционира Общинската болница за спешна помощ Moinesti — структурата на обществените болници — осигурява навременна и ефективна реакция на обществената медицинска система в община Moinesti на кризата с COVID-19. Що се отнася до показателя за резултати 2S132 „Подходящ капацитет за грижи и лечение за случаи на SARS-CoV-2/здравно управление на кризи“, съществуващото и очакваното изпълнение на този показател за SMUM е: — Преди интервенцията на LIOP: Не — След интервенцията на LIOP: ДА, ДА, ДА. Поради това проектът допринася за постигането на показателя за резултати от програмата, а именно 2S132 „Подходящ капацитет за грижи и лечение на случаи на инфекция със SARS-CoV-2/здравно управление на кризи“ чрез интервенции, насочени към развитие на капацитета за предоставяне на медицински услуги и чрез включване на алтернативни методи за снабдяване на потребителите с електричество, като по този начин се увеличава капацитетът на Общинската болница за спешна помощ Мойнсти да управлява пандемичния контекст и оптималното лечение на пациентите ѝ. (Bulgarian)
    0 references
    Das allgemeine Ziel des Projekts „Modernisierung der Infrastruktur-Elektroinstallation Moinesti Municipal Emergency Hospital“ ist es, die Kapazität zur Bereitstellung optimaler medizinischer Dienstleistungen im Zusammenhang mit der Ausbreitung des SARS-CoV-2-Virus zu erhöhen und ein hohes Sicherheitsniveau zu gewährleisten. Nach den Aspekten der technischen und wirtschaftlichen Dokumentation hat die bestehende elektrische Installation in allen Gebäuden des städtischen Krankenhauses Moinesti einen fortgeschrittenen Verschleiß aufgrund der langen Nutzungsdauer und des derzeit erhöhten Energieverbrauchs durch die Ergänzung der Verbraucher. Aus diesen Gründen ist die bestehende elektrische Anlage untermaßig, entspricht nicht den aktuellen technischen Standards und ist somit nicht möglich, einen sicheren Betrieb zu gewährleisten, der jederzeit zu einem Brand führen kann. Mit der Umsetzung dieses Projekts wird diese Gefahr einerseits beseitigt, andererseits führt die Intervention zu einer Optimierung der Art und Weise, wie mit dem SARS-CoV-2-Virus infizierte Patienten betreut und behandelt werden. Auf diese Weise gewährleistet das vorliegende Projekt zur Modernisierung der elektrischen Anlagen der Gebäude, in denen das städtische Notkrankenhaus Moinesti tätig ist – die öffentliche Krankenhausstruktur – eine rechtzeitige und effiziente Reaktion des öffentlichen medizinischen Systems in der Gemeinde Moinesti auf die COVID-Krise – 19. In Bezug auf den Ergebnisindikator 2S132 „Angemessene Pflege- und Behandlungskapazität für Fälle von SARS-CoV-2/Gesundheitskrisenmanagement“ ist die derzeitige und die erwartete Erfüllung dieses Indikators für SMUM: — Vor der Intervention des LIOP: Nein – Nach der Intervention des LIOP: JA, JA. Daher trägt das Projekt dazu bei, den Ergebnisindikator des Programms zu erreichen, nämlich 2S132 „Angemessene Pflege- und Behandlungskapazität für Infektionsfälle mit SARS-CoV-2/Gesundheitskrisenmanagement“ durch Interventionen, die darauf abzielen, medizinische Dienstleistungen zu entwickeln und alternative Methoden zur Versorgung der Verbraucher mit Strom aufzunehmen, wodurch die Kapazität des städtischen Notkrankenhauses Moinesti erhöht wird, den Pandemiekontext und die optimale Versorgung seiner Patienten zu bewältigen. (German)
    0 references
    Opći cilj projekta „Modernizacija infrastrukturne električne instalacije Moinesti općinska hitna bolnica” je povećanje kapaciteta za pružanje optimalnih medicinskih usluga u kontekstu širenja virusa SARS-CoV-2, osiguravajući visoku razinu sigurnosti. Prema aspektima tehničke i ekonomske dokumentacije, postojeća električna instalacija u svim zgradama Općinske bolnice Moinesti Hitna ima napredni stupanj trošenja zbog dugog razdoblja korištenja i trenutne povećane potrošnje energije dopunjavanjem potrošača. Zbog toga je postojeća električna instalacija nedovoljna, nije u skladu s važećim tehničkim standardima i stoga nije moguće osigurati siguran rad koji može dovesti do požara u bilo kojem trenutku. Provedbom ovog projekta ova se opasnost uklanja, s jedne strane, a s druge strane, intervencija dovodi do optimizacije načina na koji se pacijenti zaraženi virusom SARS-CoV-2 brinu i liječe. Na taj način ovim projektom modernizacije električnih instalacija zgrada u kojima djeluje općinska hitna bolnica Moinesti – struktura javne bolnice – osigurava se pravovremen i učinkovit odgovor javnog zdravstvenog sustava u općini Moinesti na krizu uzrokovanu COVID-om – 19. Kad je riječ o pokazatelju rezultata 2S132 „Odgovarajući kapaciteti skrbi i liječenja za slučajeve SARS-CoV-2/zdravstvenog upravljanja krizom”, postojeće i očekivano ispunjavanje tog pokazatelja za SMUM jest: — Prije intervencije LIOP-a: Ne – nakon intervencije LIOP-a: DA, MOLIM TE. Stoga projekt pridonosi postizanju pokazatelja rezultata programa, odnosno 2S132 „Odgovarajuća sposobnost skrbi i liječenja za slučajeve infekcije virusom SARS-CoV-2/zdravstveno upravljanje krizom” kroz intervencije usmjerene na razvoj kapaciteta za pružanje medicinskih usluga i uključivanje alternativnih metoda opskrbe potrošača električnom energijom čime se povećava kapacitet hitne bolnice Moinesti za upravljanje kontekstom pandemije i optimalnom skrbi o pacijentima. (Croatian)
    0 references
    O objetivo geral do projeto «Modernização da instalação elétrica de infraestruturas Moinesti Hospital Municipal de Emergência» é aumentar a capacidade de prestar serviços médicos otimizados no contexto da propagação do vírus SARS-CoV-2, garantindo um elevado nível de segurança. De acordo com os aspetos da documentação técnica e econômica, a instalação elétrica existente em todos os edifícios do Hospital Municipal de Emergência de Moinesti tem um grau avançado de desgaste devido ao longo período de uso e ao aumento atual do consumo de energia, complementando os consumidores. Por estas razões, a instalação elétrica existente é subdimensionada, não está em conformidade com as normas técnicas atuais e, por conseguinte, não é possível garantir um funcionamento seguro que possa conduzir a um incêndio a qualquer momento. Com a implementação deste projeto, este perigo é eliminado, por um lado, e, por outro, a intervenção leva a uma otimização da forma como os doentes infetados pelo vírus SARS-CoV-2 são tratados e tratados. Desta forma, através do presente projeto de modernização das instalações elétricas dos edifícios em que o Hospital Municipal de Emergência de Moinesti opera — a estrutura hospitalar pública — garante uma resposta atempada e eficiente do sistema médico público do concelho de Moinesti à crise da COVID-19. No que diz respeito ao indicador de resultados 2S132 «Cuidados adequados e capacidade de tratamento para casos de gestão de crises sanitárias SARS-CoV-2/», o cumprimento atual e esperado deste indicador para a Smum é o seguinte: — Antes da intervenção LIOP: Não — Após a intervenção do LIOP: SIM, SIM. Portanto, o projeto contribui para alcançar o indicador de resultados do programa, ou seja, 2S132 «Cuidados adequados e capacidade de tratamento para casos de infeção por SARS-CoV-2/gestão de crises de saúde» através de intervenções destinadas a desenvolver a capacidade de prestação de serviços médicos e pela inclusão de métodos alternativos de fornecimento de eletricidade aos consumidores, aumentando assim a capacidade do Hospital Municipal de Emergência de Moinesti para gerir o contexto pandémico e o melhor atendimento de seus pacientes. (Portuguese)
    0 references
    Infrastruktuurin sähköasennuksen Moinestin päivystyssairaalan nykyaikaistamishankkeen yleisenä tavoitteena on lisätä valmiuksia tarjota optimaalisia lääketieteellisiä palveluja SARS-CoV-2-viruksen leviämisen yhteydessä ja varmistaa korkea turvallisuustaso. Teknisen ja taloudellisen dokumentoinnin näkökohtien mukaan Moinestin päivystyssairaalan kaikissa rakennuksissa käytössä oleva sähköasennus on pitkälle edennyt sekä pitkän käyttöajan että nykyisen energiankulutuksen lisääntymisen vuoksi täydentämällä kuluttajia. Näistä syistä nykyinen sähkölaitteisto on alamittainen, se ei ole nykyisten teknisten standardien mukainen, joten ei ole mahdollista varmistaa turvallista toimintaa, joka voi aiheuttaa tulipalon milloin tahansa. Tämän hankkeen toteutuksen myötä tämä vaara poistuu, ja toisaalta interventio johtaa SARS-CoV-2-virustartunnan saaneiden potilaiden hoidon ja hoidon optimointiin. Tällä tavoin Moinestin kunnan päivystyssairaalan, julkisen sairaalarakenteen, sähköasennusten nykyaikaistamista koskevan hankkeen avulla varmistetaan Moinestin kunnan julkisen terveydenhuoltojärjestelmän oikea-aikainen ja tehokas reagointi covid-19-kriisiin. Tulosindikaattorin 2S132 ”Sopiva hoito- ja hoitokapasiteetti SARS-CoV-2/terveyskriisinhallinnan tapauksissa” osalta tämän indikaattorin nykyinen ja odotettu täyttyminen SMUM:n osalta on seuraava: — Ennen LIOP-toimenpidettä: Ei – LIOP-toimenpiteen jälkeen: KYLLÄ, KYLLÄ. Näin ollen hankkeella edistetään ohjelman tulosindikaattorin 2S132 ”asianmukainen hoito- ja hoitokapasiteetti SARS-CoV-2/terveyskriisinhallinnan tapauksissa” saavuttamista toimenpiteillä, joilla pyritään kehittämään valmiuksia tarjota lääketieteellisiä palveluja ja ottamalla käyttöön vaihtoehtoisia menetelmiä toimittaa kuluttajille sähköä, mikä lisää Moinestin kunnallisen päivystyssairaalan valmiuksia hallita pandemiatilannetta ja potilaiden optimaalista hoitoa. (Finnish)
    0 references
    Všeobecným cieľom projektu „Modernizácia infraštruktúry elektrických inštalácií Moinesti Municipal Emergency Hospital“ je zvýšiť kapacitu poskytovať optimálne zdravotnícke služby v súvislosti so šírením vírusu SARS-CoV-2, čím sa zabezpečí vysoká úroveň bezpečnosti. Podľa aspektov technickej a ekonomickej dokumentácie má existujúca elektrická inštalácia vo všetkých budovách mestskej nemocnice Moinesti pokročilý stupeň opotrebovania vďaka dlhému obdobiu používania a súčasnej zvýšenej spotrebe energie doplnením spotrebiteľov. Z týchto dôvodov je existujúca elektrická inštalácia nedostatočne veľká, nie je v súlade s platnými technickými normami, a preto nie je možné zabezpečiť bezpečnú prevádzku, ktorá môže kedykoľvek viesť k požiaru. Pri realizácii tohto projektu je toto nebezpečenstvo odstránené na jednej strane a na druhej strane intervencia vedie k optimalizácii spôsobu, akým sú pacienti infikovaní vírusom SARS-CoV-2 opatrovaní a liečení. Týmto spôsobom prostredníctvom súčasného projektu modernizácie elektrických inštalácií budov, v ktorých pôsobí Mestská pohotovostná nemocnica Moinesti – štruktúra verejnej nemocnice – zabezpečuje včasnú a efektívnu reakciu verejného zdravotníckeho systému v obci Moinesti na krízu spôsobenú ochorením COVID-19 – 19. Pokiaľ ide o ukazovateľ výsledkov 2S132 „Primeraná kapacita starostlivosti a liečby v prípadoch SARS-CoV-2/zdravotného krízového riadenia“, existujúce a očakávané plnenie tohto ukazovateľa pre SMUM je: — Pred intervenciou LIOP: Nie – po intervencii LIOP: ÁNO, ÁNO. Projekt preto prispieva k dosiahnutiu ukazovateľa výsledkov programu, konkrétne 2S132 „Primeraná schopnosť starostlivosti a liečby v prípadoch infekcie vírusom SARS-CoV-2/zdravotné krízové riadenie“ prostredníctvom intervencií zameraných na rozvoj kapacít na poskytovanie zdravotníckych služieb a zahrnutím alternatívnych metód zásobovania spotrebiteľov elektrickou energiou, čím sa zvýši kapacita mestskej pohotovostnej nemocnice Moinesti riadiť situáciu pandémie a optimálnu starostlivosť o svojich pacientov. (Slovak)
    0 references
    Is é cuspóir ginearálta an tionscadail “Suiteáil leictreach bonneagair a nuachóiriú Ospidéal Éigeandála Bardasach Moinesti” an acmhainneacht a mhéadú chun seirbhísí leighis barrmhaith a sholáthar i gcomhthéacs leathadh víreas SARS-CoV-2, lena n-áirithítear ardleibhéal sábháilteachta. De réir na gnéithe den doiciméadú teicniúil agus eacnamaíoch, tá an suiteáil leictreach atá ann cheana i ngach foirgneamh den Ospidéal Cathrach Éigeandála Moinesti céim chun cinn de chaitheamh mar gheall ar an tréimhse fhada úsáide agus an tomhaltas fuinnimh atá ann faoi láthair méadaithe trí thomhaltóirí a fhorlíonadh. Ar na cúiseanna seo, tá an tsuiteáil leictreach atá ann cheana róbheag, ní chomhlíonann sé na caighdeáin theicniúla atá ann faoi láthair agus dá bhrí sin ní féidir oibriú sábháilte a chinntiú a d’fhéadfadh tine a bheith mar thoradh air ag am ar bith. Le cur chun feidhme an tionscadail seo, cuirtear deireadh leis an mbaol sin, ar thaobh amháin, agus ar an taobh eile, mar thoradh ar an idirghabháil déantar barrfheabhsú ar an mbealach ina dtugtar aire d’othair atá ionfhabhtaithe le víreas SARS-CoV-2 agus ina gcuirtear cóireáil orthu. Ar an gcaoi sin, tríd an tionscadal reatha chun nuachóiriú a dhéanamh ar shuiteálacha leictreacha na bhfoirgneamh ina bhfeidhmíonn Ospidéal Éigeandála Bardasach Moinesti — struchtúr na n-ospidéal poiblí — cinntíonn sé freagairt thráthúil agus éifeachtúil an chórais leighis phoiblí i mbardas Moinesti ar ghéarchéim COVID-19-19. Maidir leis an táscaire toraidh 2S132 ‘Cúram cuí agus acmhainneacht chóireála do chásanna de bhainistíocht géarchéime sláinte SARS-CoV-2/’, is é comhlíonadh an táscaire seo le haghaidh Smum atá ann cheana agus a bhfuiltear ag súil leis: — Roimh idirghabháil liop: Níl — Tar éis an idirghabháil liop: TÁ, TÁ. Dá bhrí sin, rannchuidíonn an tionscadal le táscaire toraidh an chláir a bhaint amach, eadhon 2S132 “Cúram cuí agus acmhainneacht chóireála le haghaidh cásanna ionfhabhtaithe le SARS-CoV-2/bainistiú géarchéime sláinte” trí idirghabhálacha atá dírithe ar fhorbairt a dhéanamh ar an gcumas seirbhísí leighis a sholáthar agus trí mhodhanna malartacha a áireamh chun leictreachas a sholáthar do thomhaltóirí, rud a mhéadóidh cumas Ospidéal Éigeandála Bardasach Moinesti chun comhthéacs na paindéime agus cúram barrmhaith a chuid othar a bhainistiú. (Irish)
    0 references
    L’objectif général du projet «Modernisation de l’installation électrique d’infrastructure Moinesti Municipal Emergency Hospital» est d’augmenter la capacité à fournir des services médicaux optimaux dans le contexte de la propagation du virus SARS-CoV-2, garantissant un niveau élevé de sécurité. Selon les aspects de la documentation technique et économique, l’installation électrique existante dans tous les bâtiments de l’hôpital municipal d’urgence de Moinesti a un degré d’usure élevé en raison de la longue période d’utilisation et de l’augmentation actuelle de la consommation d’énergie en complétant les consommateurs. Pour ces raisons, l’installation électrique existante est sous-dimensionnée, n’est pas conforme aux normes techniques en vigueur et il n’est donc pas possible d’assurer un fonctionnement sûr qui peut conduire à un incendie à tout moment. Avec la mise en œuvre de ce projet, ce danger est éliminé, d’une part, et d’autre part, l’intervention conduit à une optimisation de la façon dont les patients infectés par le virus SARS-CoV-2 sont soignés et traités. Ainsi, grâce au présent projet de modernisation des installations électriques des bâtiments dans lesquels l’hôpital municipal d’urgence de Moinesti opère — la structure de l’hôpital public — assure une réponse rapide et efficace du système médical public de la municipalité de Moinesti à la crise de la COVID-19. En ce qui concerne l’indicateur de résultat 2S132 «Capacité de soins et de traitement appropriés pour les cas de SARS-CoV-2/gestion des crises sanitaires», le respect actuel et prévu de cet indicateur pour SMUM est: — Avant l’intervention du LIOP: Non — Après l’intervention du LIOP: OUI, OUI. Par conséquent, le projet contribue à l’atteinte de l’indicateur de résultat du programme, à savoir 2S132 «Capacité de soins et de traitement appropriés pour les cas d’infection par le SRAS-CoV-2/gestion de crise sanitaire» par des interventions visant à développer la capacité de fournir des services médicaux et en incluant d’autres méthodes de fourniture d’électricité aux consommateurs, augmentant ainsi la capacité de l’hôpital municipal d’urgence de Moinesti à gérer le contexte pandémique et les soins optimaux à ses patients. (French)
    0 references
    Det allmänna målet med projektet ”Modernisering av infrastruktur för elinstallation Moinesti kommunala akutsjukhus” är att öka kapaciteten att tillhandahålla optimala medicinska tjänster i samband med spridningen av sars-CoV-2-virus, vilket garanterar en hög säkerhetsnivå. Enligt den tekniska och ekonomiska dokumentationen har den befintliga elinstallationen i alla byggnader på Moinesti akutsjukhus en avancerad grad av slitage på grund av både den långa användningsperioden och den nuvarande ökade energiförbrukningen genom att komplettera konsumenterna. Av dessa skäl är den befintliga elektriska installationen underdimensionerad, inte överensstämmer med gällande tekniska standarder och det är därför inte möjligt att säkerställa säker drift som kan leda till en brand när som helst. Med genomförandet av detta projekt elimineras denna fara, å ena sidan, och å andra sidan leder insatsen till en optimering av hur patienter infekterade med SARS-CoV-2-virus vårdas och behandlas. Genom det aktuella projektet för att modernisera elinstallationerna i de byggnader där Moinestis kommunala akutsjukhus är verksamt – den offentliga sjukhusstrukturen – säkerställer på detta sätt ett snabbt och effektivt svar från det offentliga sjukvårdssystemet i Moinesti kommun på covid-19-krisen – 19. När det gäller resultatindikator 2S132 ”Lämplig vård- och behandlingskapacitet i fall av sars-cov-2/hälsokrishantering” är det befintliga och förväntade uppfyllandet av denna indikator för SMUM — Före LIOP-interventionen: Nej – Efter LIOP-ingripandet: JA, JA. Projektet bidrar därför till att uppnå programmets resultatindikator, nämligen 2S132 ”Lämplig vård- och behandlingskapacitet för fall av infektion med SARS-CoV-2/hälsokrishantering” genom insatser som syftar till att utveckla kapaciteten att tillhandahålla medicinska tjänster och genom att inkludera alternativa metoder för att förse konsumenterna med el, vilket ökar kapaciteten hos Moinesti kommunala akutsjukhus för att hantera pandemin och optimal vård av sina patienter. (Swedish)
    0 references
    Γενικός στόχος του έργου «Εκσυγχρονισμός της ηλεκτρολογικής εγκατάστασης υποδομής του δημοτικού νοσοκομείου έκτακτης ανάγκης Moinesti» είναι η αύξηση της ικανότητας παροχής βέλτιστων ιατρικών υπηρεσιών στο πλαίσιο της εξάπλωσης του ιού SARS-CoV-2, εξασφαλίζοντας υψηλό επίπεδο ασφάλειας. Σύμφωνα με τις πτυχές της τεχνικής και οικονομικής τεκμηρίωσης, η υπάρχουσα ηλεκτρική εγκατάσταση σε όλα τα κτίρια του έκτακτου δημοτικού νοσοκομείου Moinesti έχει προχωρημένο βαθμό φθοράς λόγω τόσο της μακράς περιόδου χρήσης όσο και της τρέχουσας αυξημένης κατανάλωσης ενέργειας με τη συμπλήρωση των καταναλωτών. Για τους λόγους αυτούς, η υπάρχουσα ηλεκτρική εγκατάσταση είναι μικρότερη από το μέγεθος, δεν συμμορφώνεται με τα ισχύοντα τεχνικά πρότυπα και, ως εκ τούτου, δεν είναι δυνατόν να διασφαλιστεί η ασφαλής λειτουργία που μπορεί να οδηγήσει σε πυρκαγιά ανά πάσα στιγμή. Με την υλοποίηση αυτού του έργου, ο κίνδυνος αυτός εξαλείφεται, αφενός, και από την άλλη, η παρέμβαση οδηγεί στη βελτιστοποίηση του τρόπου με τον οποίο φροντίζονται και αντιμετωπίζονται οι ασθενείς που έχουν μολυνθεί από τον ιό SARS-CoV-2. Με τον τρόπο αυτό, μέσω του παρόντος έργου εκσυγχρονισμού των ηλεκτρικών εγκαταστάσεων των κτιρίων στα οποία λειτουργεί το Δημοτικό Νοσοκομείο Έκτακτης Ανάγκης Moinesti — η δημόσια νοσοκομειακή δομή — διασφαλίζει την έγκαιρη και αποτελεσματική ανταπόκριση του δημόσιου ιατρικού συστήματος του δήμου Moinesti στην κρίση COVID-19. Όσον αφορά τον δείκτη αποτελεσμάτων 2S132 «Κατάλληλη ικανότητα περίθαλψης και θεραπείας για περιπτώσεις SARS-CoV-2/διαχείριση κρίσεων στον τομέα της υγείας», η υφιστάμενη και αναμενόμενη εκπλήρωση αυτού του δείκτη για το SMUM είναι: — Πριν από την παρέμβαση LIOP: Όχι — Μετά την παρέμβαση LIOP: ΝΑΙ, ΝΑΙ. Ως εκ τούτου, το έργο συμβάλλει στην επίτευξη του δείκτη αποτελεσμάτων του προγράμματος, δηλαδή 2S132 «Κατάλληλη ικανότητα περίθαλψης και θεραπείας για περιπτώσεις λοίμωξης από SARS-CoV-2/διαχείριση κρίσεων στον τομέα της υγείας» μέσω παρεμβάσεων που αποσκοπούν στην ανάπτυξη της ικανότητας παροχής ιατρικών υπηρεσιών και στη συμπερίληψη εναλλακτικών μεθόδων παροχής ηλεκτρικής ενέργειας στους καταναλωτές αυξάνοντας έτσι την ικανότητα του δημοτικού νοσοκομείου έκτακτης ανάγκης Moinesti να διαχειρίζεται το πλαίσιο της πανδημίας και τη βέλτιστη φροντίδα των ασθενών του. (Greek)
    0 references
    De algemene doelstelling van het project „Modernisering van de infrastructuur elektrische installatie Moinesti Municipal Emergency Hospital” is het vergroten van de capaciteit om optimale medische diensten te verlenen in de context van de verspreiding van SARS-CoV-2 virus, waardoor een hoog veiligheidsniveau wordt gewaarborgd. Volgens de aspecten van de technische en economische documentatie heeft de bestaande elektrische installatie in alle gebouwen van het Moinesti Emergency Municipal Hospital een geavanceerde mate van slijtage door zowel de lange gebruiksperiode als het huidige toegenomen energieverbruik door consumenten aan te vullen. Om deze redenen is de bestaande elektrische installatie ondermaats, voldoet niet aan de huidige technische normen en is het dus niet mogelijk om een veilige werking te garanderen die op elk moment tot brand kan leiden. Met de uitvoering van dit project wordt dit gevaar enerzijds geëlimineerd en anderzijds leidt de interventie tot een optimalisatie van de manier waarop patiënten die besmet zijn met het SARS-CoV-2-virus worden verzorgd en behandeld. Op deze manier zorgt het huidige project voor de modernisering van de elektrische installaties van de gebouwen waarin het Moinesti Municipal Emergency Hospital opereert — de openbare ziekenhuisstructuur — voor een tijdige en efficiënte respons van het openbare medische systeem in de gemeente Moinesti op de COVID-crisis — 19. Wat de resultaatindicator 2S132 „Appropriate care and treatment capacity for cases of SARS-CoV-2/health crisis management” betreft, is de bestaande en verwachte vervulling van deze indicator voor SMUM: — Vóór de LIOP-interventie: Nee — Na de LIOP-interventie: JA, JA. Daarom draagt het project bij tot het bereiken van de resultaatindicator van het programma, namelijk 2S132 „Appropriate care and treatment capacity for cases of infection with SARS-CoV-2/health crisis management” door middel van interventies die gericht zijn op de ontwikkeling van de capaciteit voor het verlenen van medische diensten en door het opnemen van alternatieve methoden om consumenten van elektriciteit te voorzien, waardoor de capaciteit van het gemeentelijk noodziekenhuis Moinesti om de pandemiecontext en optimale zorg voor haar patiënten te beheren, wordt vergroot. (Dutch)
    0 references
    20 June 2023
    0 references
    Municipiul Moineşti, Romania
    0 references

    Identifiers

    154527
    0 references