Reducing the energy performance of buildings in the Pejšův Mill area in Sedlčany — The insulation of the shield wall and the installation of the PVE (Q4573480)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q4573480 in Czechia
Language Label Description Also known as
English
Reducing the energy performance of buildings in the Pejšův Mill area in Sedlčany — The insulation of the shield wall and the installation of the PVE
Project Q4573480 in Czechia

    Statements

    0 references
    1,750,588.79 Czech koruna
    0 references
    71,774.14039 Euro
    0 references
    3,416,486.98 Czech koruna
    0 references
    140,075.96618000002 Euro
    0 references
    51.23943981779787 percent
    0 references
    23 April 2019
    0 references
    30 November 2021
    0 references
    Pejšův mlýn Sedlčany spol. s r.o.
    0 references

    49°39'31.32"N, 14°24'49.00"E
    0 references
    26401
    0 references
    Projekt se zabývá snížením energetické náročnosti budovy mlýna prostřednictvím realizace energeticky úsporných opatření v areálu Pejšova mlýna v Sedlčanech, která spočívají v zateplení obvodové stěny, instalaci fotovoltaické elektrárny na střechu objektu mlýna a rekonstrukci stávající zděné odběratelské trafostanice. Projekt navazuje na již dříve zrealizovanou první fázi snížení energetické náročnosti areálu. (Czech)
    0 references
    Projekt se bavi smanjenjem energetskih svojstava mlinske zgrade provođenjem mjera uštede energije u prostorijama Pejšev mlýne u Sedlčanyu, koje se sastoje od izolacije perimetra zida, ugradnje fotonaponske elektrane na krov mlinske zgrade i rekonstrukcije postojeće transformatorske stanice kupca opeke. Projekt slijedi prethodno provedenu prvu fazu smanjenja energetske učinkovitosti kompleksa. (Croatian)
    0 references
    Projekts attiecas uz dzirnavu ēkas energoefektivitātes samazināšanu, īstenojot energotaupības pasākumus Pejšův mlýna telpās Sedlčany, kas sastāv no perimetra sienas izolācijas, fotoelementu spēkstacijas uzstādīšanas uz dzirnavu ēkas jumta un esošās ķieģeļu klientu transformatoru stacijas rekonstrukcijas. Projekts seko iepriekš īstenotajam kompleksa energoefektivitātes samazināšanas pirmajam posmam. (Latvian)
    0 references
    The project deals with the reduction of the energy performance of the mill building through the implementation of energy-saving measures in the premises of Pejšův mlýna in Sedlčany, which consist of insulation of the perimeter wall, the installation of a photovoltaic power plant on the roof of the mill building and the reconstruction of the existing brick customer transformer station. The project follows the previously implemented first phase of reducing the energy performance of the complex. (English)
    0.1661821585497761
    0 references
    Il progetto si occupa della riduzione delle prestazioni energetiche dell'edificio mulino attraverso l'implementazione di misure di risparmio energetico nei locali di Pejšův mlýna a Sedlčany, che consistono nell'isolamento della parete perimetrale, nell'installazione di una centrale fotovoltaica sul tetto dell'edificio del mulino e nella ricostruzione dell'esistente stazione di trasformazione cliente in mattoni. Il progetto segue la prima fase precedentemente implementata di riduzione delle prestazioni energetiche del complesso. (Italian)
    0 references
    Hanke koskee myllyrakennuksen energiatehokkuuden vähentämistä toteuttamalla energiansäästötoimenpiteitä Sedlčanyssa sijaitsevan Pejšův mlýnan tiloissa, jotka koostuvat kehäseinän eristyksestä, aurinkosähkövoimalaitoksen asentamisesta tehdasrakennuksen katolle ja olemassa olevan tiiliasiakasmuuntajaaseman kunnostamisesta. Hanke seuraa aiemmin toteutettua ensimmäistä vaihetta kompleksin energiatehokkuuden vähentämisessä. (Finnish)
    0 references
    Projektis käsitletakse veskihoone energiatõhususe vähendamist, rakendades Sedlčanys Pejšěv mlýna ruumides energiasäästumeetmeid, mis seisnevad perimeetriseina isolatsioonis, fotoelektrijaama paigaldamises veskihoone katusele ning olemasoleva telliskivist klienditrafojaama rekonstrueerimises. Projekt järgneb varem rakendatud esimesele etapile, milleks on kompleksi energiatõhususe vähendamine. (Estonian)
    0 references
    Déileálann an tionscadal le feidhmíocht fuinnimh an fhoirgnimh mhuilinn a laghdú trí bhearta coigilte fuinnimh a chur i bhfeidhm in áitreabh Pejš°v mlýna i Sedlčany, ina bhfuil insliú ar an mballa imlíne, suiteáil gléasra cumhachta fótavoltach ar dhíon foirgneamh an mhuilinn agus atógáil an stáisiúin claochladáin do chustaiméirí bríce atá ann cheana féin. Leanann an tionscadal an chéad chéim a cuireadh i bhfeidhm roimhe seo chun feidhmíocht fuinnimh an choimpléasc a laghdú. (Irish)
    0 references
    El proyecto aborda la reducción de la eficiencia energética del edificio del molino mediante la implementación de medidas de ahorro de energía en las instalaciones de Pejš ​​v mlýna en Sedlčany, que consisten en el aislamiento de la pared perimetral, la instalación de una planta de energía fotovoltaica en el techo del edificio del molino y la reconstrucción de la estación de transformadores de ladrillo existente. El proyecto sigue la primera fase implementada anteriormente para reducir el rendimiento energético del complejo. (Spanish)
    0 references
    Projektu siekiama sumažinti gamyklos pastato energinį naudingumą įgyvendinant energijos taupymo priemones „Pejšův mlýna“ patalpose Sedlčany, kurią sudaro perimetro sienos izoliacija, fotoelektros elektrinės įrengimas ant malūno pastato stogo ir esamos plytų užsakovo transformatorių stoties rekonstrukcija. Projektas vykdomas po anksčiau įgyvendinto pirmojo komplekso energinio naudingumo mažinimo etapo. (Lithuanian)
    0 references
    O projeto diz respeito à redução do desempenho energético do edifício da fábrica através da aplicação de medidas de poupança de energia nas instalações de Pejšův mlýna em Sedlčany, que consistem no isolamento da parede do perímetro, na instalação de uma central fotovoltaica no telhado do edifício da fábrica e na reconstrução da atual estação de transformação de tijolos para clientes. O projeto segue a primeira fase anteriormente implementada de redução do desempenho energético do complexo. (Portuguese)
    0 references
    Le projet porte sur la réduction de la performance énergétique du bâtiment de l’usine grâce à la mise en œuvre de mesures d’économie d’énergie dans les locaux de PejšΔv mlýna à Sedlčany, qui consistent en l’isolation du mur du périmètre, l’installation d’une centrale photovoltaïque sur le toit du bâtiment de l’usine et la reconstruction de la station de transformation existante pour les clients de briques. Le projet fait suite à la première phase précédemment mise en œuvre de la réduction de la performance énergétique du complexe. (French)
    0 references
    Проектът се занимава с намаляване на енергийните характеристики на мелницата чрез прилагане на енергоспестяващи мерки в помещенията на Пейш-v mlýna в Седлчани, които се състоят в изолация на периметърната стена, инсталиране на фотоволтаична електроцентрала на покрива на мелницата и реконструкция на съществуващата тухлена клиентска трансформаторна станция. Проектът следва предварително изпълнената първа фаза на намаляване на енергийните характеристики на комплекса. (Bulgarian)
    0 references
    Projektet beskæftiger sig med reduktion af møllebygningens energimæssige ydeevne gennem gennemførelse af energibesparende foranstaltninger i Pejšův mlýnas lokaler i Sedlčany, som består i isolering af perimetervæggen, installation af et solcelleanlæg på taget af møllebygningen og genopbygning af den eksisterende murstenstransformerstation. Projektet følger den tidligere gennemførte første fase af at reducere kompleksets energimæssige ydeevne. (Danish)
    0 references
    Projekt se ukvarja z zmanjševanjem energetske učinkovitosti mlinske stavbe z izvajanjem ukrepov varčevanja z energijo v prostorih Pejšav mlýna v Sedlčanyju, ki so sestavljeni iz izolacije obodne stene, namestitve fotonapetostne elektrarne na strehi mlinske stavbe in rekonstrukcije obstoječe opečne transformatorske postaje. Projekt sledi predhodno izvedeni prvi fazi zmanjševanja energetske učinkovitosti kompleksa. (Slovenian)
    0 references
    Het project heeft betrekking op de vermindering van de energieprestaties van het molengebouw door de uitvoering van energiebesparende maatregelen in de gebouwen van Pejšův mlýna in Sedlčany, die bestaan uit isolatie van de omtrekmuur, de installatie van een fotovoltaïsche energiecentrale op het dak van het molengebouw en de wederopbouw van het bestaande klantentransformatorstation voor bakstenen. Het project volgt op de eerder geïmplementeerde eerste fase van het verminderen van de energieprestatie van het complex. (Dutch)
    0 references
    Το έργο αφορά τη μείωση της ενεργειακής απόδοσης του κτιρίου του ελαιοτριβείου μέσω της εφαρμογής μέτρων εξοικονόμησης ενέργειας στις εγκαταστάσεις του Pejšрv mlýna στο Sedlčany, οι οποίες συνίστανται στη μόνωση του περιμετρικού τοίχου, στην εγκατάσταση φωτοβολταϊκού σταθμού ηλεκτροπαραγωγής στην οροφή του κτιρίου του ελαιοτριβείου και στην ανακατασκευή του υφιστάμενου σταθμού μετασχηματιστών πελατών τούβλου. Το έργο ακολουθεί την πρώτη φάση μείωσης της ενεργειακής απόδοσης του συγκροτήματος. (Greek)
    0 references
    A projekt a malomépület energiateljesítményének csökkentésével foglalkozik a sedlčanyi Pejšův mlýna energiatakarékossági intézkedések végrehajtásával, amelyek a peremfal szigeteléséből, a malomépület tetején lévő fotovoltaikus erőmű telepítéséből és a meglévő tégla ügyféltranszformátor állomás felújításából állnak. A projekt a komplexum energiahatékonyságának csökkentésére irányuló, korábban megvalósított első szakaszt követi. (Hungarian)
    0 references
    Das Projekt befasst sich mit der Reduzierung der Energieeffizienz des Mühlengebäudes durch die Durchführung von energiesparenden Maßnahmen in den Räumlichkeiten von Pejšův mlýna in Sedlčany, die aus der Isolierung der Perimeterwand, der Installation eines Photovoltaik-Kraftwerks auf dem Dach des Mühlengebäudes und der Rekonstruktion der bestehenden Ziegelkunden-Transformatorstation bestehen. Das Projekt folgt auf die zuvor durchgeführte erste Phase der Reduzierung der Energieeffizienz des Komplexes. (German)
    0 references
    Projekt sa zaoberá redukciou energetickej hospodárnosti mlyna realizáciou energeticky úsporných opatrení v priestoroch Pejšův mlýna v Sedlčanoch, ktoré pozostávajú z izolácie obvodovej steny, inštalácie fotovoltaickej elektrárne na streche mlyna a rekonštrukcie existujúcej tehlovej zákazníckej transformačnej stanice. Projekt nadväzuje na predchádzajúcu prvú fázu znižovania energetickej hospodárnosti komplexu. (Slovak)
    0 references
    Proiectul se referă la reducerea performanței energetice a clădirii morii prin punerea în aplicare a măsurilor de economisire a energiei în incinta Pejšрv mlýna din Sedlčany, care constă în izolarea peretelui perimetrului, instalarea unei centrale electrice fotovoltaice pe acoperișul clădirii morii și reconstrucția stației existente de transformare a clienților din cărămidă. Proiectul urmează prima fază implementată anterior de reducere a performanței energetice a complexului. (Romanian)
    0 references
    Projektet handlar om att minska kvarnbyggnadens energiprestanda genom att genomföra energibesparande åtgärder i Pejšňv mlýnas lokaler i Sedlčany, som består av isolering av omkretsväggen, installation av ett solcellskraftverk på taket till kvarnbyggnaden och återuppbyggnad av den befintliga tegelkundstransformatorstationen. Projektet följer den tidigare genomförda första fasen av att minska energiprestandan i komplexet. (Swedish)
    0 references
    Il-proġett jittratta t-tnaqqis tal-prestazzjoni tal-enerġija tal-bini tal-mitħna permezz tal-implimentazzjoni ta’ miżuri għall-iffrankar tal-enerġija fil-bini ta’ Pejšņv mlýna f’Sedlčany, li jikkonsisti f’iżolament tal-ħajt tal-perimetru, l-installazzjoni ta’ impjant fotovoltajku fuq il-bejt tal-bini tal-mitħna u r-rikostruzzjoni tal-istazzjon eżistenti tat-transformer tal-klijenti tal-briks. Il-proġett isegwi l-ewwel fażi li ġiet implimentata qabel tat-tnaqqis tal-prestazzjoni tal-enerġija tal-kumpless. (Maltese)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/18_183/0017047
    0 references