THREE-YEAR IEFP MISCELLANEOUS SECTORS PATHWAYS (Q4243960)
Jump to navigation
Jump to search
Project Q4243960 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | THREE-YEAR IEFP MISCELLANEOUS SECTORS PATHWAYS |
Project Q4243960 in Italy |
Statements
838,530.0 Euro
0 references
9 July 2020
0 references
ENAIP VENETO IMPRESA SOCIALE
0 references
IL PRESENTE PROGETTO QUADRO CONTIENE 9 INTERVENTI TIPO FI/Q3T, PER LA REALIZZAZIONE DI NUOVI INTERVENTI DI TERZO ANNO AFFERENTI AI COMPARI VARI CIASCUNO DELLA DURATA DI 990 ORE, DI CUI 232 DI STAGE, CON CUI VENGONO AVVIATI NUOVI PERCORSI TRIENNALI CHE GIUNGERANNO A QUALIFICA NELL'A.F. 2020/2021. NELLO SPECIFICO, L'OFFERTA FORMATIVA DI ENAIP VENETO I.S. NEL PRESENTE PROGETTO PER IL NUOVO TRIENNIO SI COMPONE DI: 1 PERCORSO DI OPERATORE DELLA RISTORAZIONE: INDIRIZZO PREPARAZIONE PASTI NELLA SFP DI ISOLA DELLA SCALA 1 PERCORSO DI OPERATORE AI SERVIZI DI PROMOZIONE ED ACCOGLIENZA: INDIRIZZO TURISMO NELLA SFP DI VERONA 3 PERCORSI DI OPERATORE MECCANICO NELLA SFP DI LEGNAGO E ISOLA DELLA SCALA 1 PERCORSO DI OPERATORE ELETTRICO NELLA SFP DI LEGNAGO 2 PERCORSO DI OPERATORE ELETTRONICO NELLA SFP DI VERONA E ISOLA DELLA SCALA 1 PERCORSO DI OPERATORE ALLA RIPARAZIONE DEI VEICOLI A MOTORE NELLA SFP DI LEGNAGO I PERCORSI FORMATIVI VERRANNO REALIZZATI NELLA PROVINCIA DI VERONA IN RISPOSTA AI (Italian)
0 references
THIS FRAMEWORK PROJECT CONTAINS 9 FI/Q3T-TYPE INTERVENTIONS, FOR THE IMPLEMENTATION OF NEW THIRD-YEAR INTERVENTIONS RELATING TO THE VARIOUS MEMBERS EACH LASTING 990 HOURS, OF WHICH 232 OF INTERNSHIPS, WITH WHICH NEW THREE-YEAR COURSES ARE LAUNCHED THAT WILL REACH QUALIFICATION IN THE 2020/2021 A.F. SPECIFICALLY, THE TRAINING OFFER OF ENAIP VENETO I.S. IN THIS PROJECT FOR THE NEW THREE-YEAR PERIOD CONSISTS OF: 1 ROUTE OF RESTAURANT OPERATOR: ADDRESS PREPARATION OF MEALS IN THE SFP ISLAND OF SCALE 1 ROUTE OPERATOR TO PROMOTION AND RECEPTION SERVICES: ADDRESS TOURISM IN THE VERONA SFP 3 ROUTES OF MECHANICAL OPERATOR IN THE SFP OF LEGNAGO AND ISLAND OF THE SCALE 1 ROUTE OF ELECTRIC OPERATOR IN THE SFP OF LEGNAGO 2 ROUTE OF ELECTRONIC OPERATOR IN THE SFP OF VERONA AND ISLAND OF THE SCALE 1 ROUTE OPERATOR TO THE REPAIR OF MOTOR VEHICLES IN THE SFP OF LEGNAGO THE TRAINING PATHS WILL BE CARRIED OUT IN THE PROVINCE OF VERONA IN RESPONSE TO THE (English)
2 February 2022
0.1038135782330862
0 references
CE PROJET-CADRE CONTIENT 9 INTERVENTIONS DE TYPE FI/Q3T, POUR LA MISE EN ŒUVRE DE NOUVELLES INTERVENTIONS DE TROISIÈME ANNÉE CONCERNANT LES DIFFÉRENTS MEMBRES CHACUNE D’UNE DURÉE DE 990 HEURES, DONT 232 DE STAGES, AVEC LESQUELS DE NOUVEAUX COURS DE TROIS ANS SERONT LANCÉS ET QUI SERONT QUALIFIÉS DANS LE 2020/2021 A.F. PLUS PRÉCISÉMENT, L’OFFRE DE FORMATION D’ENAIP VENETO I.S. DANS CE PROJET POUR LA NOUVELLE PÉRIODE DE TROIS ANS COMPREND: 1 ITINÉRAIRE D’OPÉRATEUR DE RESTAURANT: ADRESSEZ LA PRÉPARATION DES REPAS DANS L’ÎLE SFP DE L’OPÉRATEUR DE ROUTE DE L’ÉCHELLE 1 À DES SERVICES DE PROMOTION ET D’ACCUEIL: ADRESSE TOURISME DANS LA VÉRONE SFP 3 ITINÉRAIRES D’OPÉRATEUR MÉCANIQUE DANS LA SFP DE LEGNAGO ET ÎLE DE L’ÉCHELLE 1 ROUTE D’OPÉRATEUR ÉLECTRIQUE DANS LE SFP DE LEGNAGO 2 ROUTE D’OPÉRATEUR ÉLECTRONIQUE DANS LA SFP DE VÉRONE ET ÎLE DE L’OPÉRATEUR DE ROUTE DE L’ÉCHELLE 1 À LA RÉPARATION DE VÉHICULES À MOTEUR DANS LE SFP DE LEGNAGO LES PARCOURS DE FORMATION SERONT EFFECTUÉS DANS LA PROVINCE DE VÉRONE EN RÉPONSE À LA (French)
2 February 2022
0 references
DIESES RAHMENPROJEKT UMFASST 9 INTERVENTIONEN VOM TYP FI/Q3T FÜR DIE DURCHFÜHRUNG NEUER INTERVENTIONEN IM DRITTEN JAHR IN BEZUG AUF DIE VERSCHIEDENEN MITGLIEDER, DIE JEWEILS 990 STUNDEN DAUERN, DAVON 232 PRAKTIKA, MIT DENEN NEUE DREIJÄHRIGE LEHRGÄNGE GESTARTET WERDEN, DIE EINE QUALIFIKATION IM ZEITRAUM 2020/2021 A.F ERREICHEN. INSBESONDERE BESTEHT DAS SCHULUNGSANGEBOT DER ENAIP VENETO I.S. IN DIESEM PROJEKT FÜR DEN NEUEN DREIJAHRESZEITRAUM AUS: 1 ROUTE DES RESTAURANTBETREIBERS: ADRESSIEREN SIE DIE ZUBEREITUNG VON MAHLZEITEN AUF DER SFP-INSEL DER ROUTE 1 ROUTE OPERATOR ZU WERBE- UND EMPFANGSDIENSTEN: ADRESSE TOURISMUS IN DER VERONA SFP 3 ROUTEN DES MECHANISCHEN BETREIBERS IN DER SFP VON LEGNAGO UND INSEL DER SKALA 1 ROUTE DES ELEKTRISCHEN BETREIBERS IN DER SFP VON LEGNAGO 2 ROUTE DES ELEKTRONISCHEN BETREIBERS IN DER SFP VON VERONA UND INSEL DER SKALA 1 ROUTE BETREIBER ZUR REPARATUR VON KRAFTFAHRZEUGEN IN DER SFP VON LEGNAGO WERDEN DIE TRAININGSWEGE IN DER PROVINZ VERONA ALS REAKTION AUF DIE (German)
3 February 2022
0 references
DIT KADERPROJECT OMVAT 9 FI/Q3T-TYPE INTERVENTIES VOOR DE UITVOERING VAN NIEUWE DERDEJAARSINTERVENTIES MET BETREKKING TOT DE VERSCHILLENDE LEDEN DIE ELK 990 UUR DUREN, WAARVAN 232 STAGES, WAARMEE NIEUWE DRIEJARIGE CURSUSSEN WORDEN GELANCEERD DIE IN 2020/2021 EEN KWALIFICATIE BEHALEN. MEER BEPAALD BESTAAT HET OPLEIDINGSAANBOD VAN ENAIP VENETO I.S. IN DIT PROJECT VOOR DE NIEUWE PERIODE VAN DRIE JAAR UIT: 1 ROUTE VAN RESTAURANTEXPLOITANT: AANPAKKEN VAN DE BEREIDING VAN MAALTIJDEN OP HET SFP-EILAND VAN SCHAAL 1-ROUTEOPERATOR TOT PROMOTIE- EN RECEPTIEDIENSTEN: ADRES TOERISME IN VERONA SFP 3 ROUTES VAN MECHANISCHE OPERATOR IN HET SFP VAN LEGNAGO EN EILAND VAN DE SCHAAL 1 ROUTE VAN DE ELEKTRISCHE OPERATOR IN DE SFP VAN LEGNAGO 2 ROUTE VAN ELEKTRONISCHE OPERATOR IN HET SFP VAN VERONA EN EILAND VAN DE SCHAAL 1 ROUTE OPERATOR VOOR DE REPARATIE VAN MOTORVOERTUIGEN IN HET SFP VAN LEGNAGO DE OPLEIDINGSTRAJECTEN ZULLEN WORDEN UITGEVOERD IN DE PROVINCIE VERONA ALS REACTIE OP DE (Dutch)
4 February 2022
0 references
ESTE PROYECTO MARCO CONTIENE 9 INTERVENCIONES DE TIPO FI/Q3T, PARA LA IMPLEMENTACIÓN DE NUEVAS INTERVENCIONES DE TERCER AÑO RELACIONADAS CON LOS DISTINTOS MIEMBROS CADA UNA DE 990 HORAS, DE LAS CUALES 232 DE PASANTÍAS, CON LAS QUE SE LANZAN NUEVOS CURSOS DE TRES AÑOS QUE ALCANZARÁN LA CUALIFICACIÓN EN EL 2020/2021 A.F. EN CONCRETO, LA OFERTA FORMATIVA DE ENAIP VENETO I.S. EN ESTE PROYECTO PARA EL NUEVO PERÍODO DE TRES AÑOS CONSISTE EN: 1 RUTA DEL OPERADOR DE RESTAURANTES: ABORDAR LA PREPARACIÓN DE COMIDAS EN LA ISLA SFP DE OPERADOR DE RUTAS DE ESCALA 1 A LOS SERVICIOS DE PROMOCIÓN Y RECEPCIÓN: DIRECCIÓN TURISMO EN EL VERONA SFP 3 RUTAS DE OPERADOR MECÁNICO EN EL SFP DE LEGNAGO E ISLA DE LA ESCALA 1 RUTA DE OPERADOR ELÉCTRICO EN EL SFP DE LEGNAGO 2 RUTA DE OPERADOR ELECTRÓNICO EN EL SFP DE VERONA E ISLA DE LA ESCALA 1 OPERADOR DE RUTA A LA REPARACIÓN DE VEHÍCULOS DE MOTOR EN EL SFP DE LEGNAGO LOS CAMINOS DE FORMACIÓN SE LLEVARÁN A CABO EN LA PROVINCIA DE VERONA EN RESPUESTA A LA (Spanish)
4 February 2022
0 references
DETTE RAMMEPROJEKT OMFATTER 9 INTERVENTIONER AF FI/Q3T-TYPEN MED HENBLIK PÅ GENNEMFØRELSE AF NYE TREDJEÅRSINTERVENTIONER VEDRØRENDE DE FORSKELLIGE MEDLEMMER, DER HVER ISÆR VARER 990 TIMER, HVORAF 232 PRAKTIKOPHOLD, HVOR DER LANCERES NYE TREÅRIGE KURSER, DER VIL KUNNE KVALIFICERE SIG I A.F. 2020/2021, BESTÅR SPECIFIKT AF UDDANNELSESTILBUDDET FRA ENAIP VENETO I.S. I DETTE PROJEKT FOR DEN NYE TREÅRIGE PERIODE: 1 RUTE FOR RESTAURANTOPERATØR: ADRESSE FORBEREDELSE AF MÅLTIDER PÅ SFP ØEN SKALA 1 RUTE OPERATØR TIL REKLAME- OG MODTAGELSESTJENESTER: ADRESSE TURISME I VERONA SFP 3 RUTER MEKANISK OPERATØR I SFP I LEGNAGO OG Ø AF SKALA 1 RUTE ELEKTRISK OPERATØR I SFP I LEGNAGO 2 RUTE ELEKTRONISK OPERATØR I SFP I VERONA OG Ø AF SKALA 1 RUTE OPERATØR TIL REPARATION AF MOTORKØRETØJER I SFP I LEGNAGO DE UDDANNELSESVEJE VIL BLIVE GENNEMFØRT I PROVINSEN VERONA SOM REAKTION PÅ (Danish)
22 July 2022
0 references
ΤΟ ΕΝ ΛΌΓΩ ΈΡΓΟ-ΠΛΑΊΣΙΟ ΠΕΡΙΛΑΜΒΆΝΕΙ 9 ΠΑΡΕΜΒΆΣΕΙΣ ΤΎΠΟΥ FI/Q3T, ΓΙΑ ΤΗΝ ΥΛΟΠΟΊΗΣΗ ΝΈΩΝ ΠΑΡΕΜΒΆΣΕΩΝ ΤΡΙΕΤΟΎΣ ΔΙΆΡΚΕΙΑΣ ΠΟΥ ΑΦΟΡΟΎΝ ΤΑ ΔΙΆΦΟΡΑ ΜΈΛΗ, ΕΚ ΤΩΝ ΟΠΟΊΩΝ 232 ΘΈΣΕΙΣ ΠΡΑΚΤΙΚΉΣ ΆΣΚΗΣΗΣ, ΜΕ ΤΙΣ ΟΠΟΊΕΣ ΞΕΚΙΝΟΎΝ ΝΈΑ ΤΡΙΕΤΉ ΜΑΘΉΜΑΤΑ ΠΟΥ ΘΑ ΑΠΟΚΤΉΣΟΥΝ ΠΡΟΣΌΝΤΑ ΤΟ 2020/2021 Μ.Χ. ΣΥΓΚΕΚΡΙΜΈΝΑ, Η ΠΡΟΣΦΟΡΆ ΚΑΤΆΡΤΙΣΗΣ ΤΟΥ ENAIP VENETO I.S. ΣΤΟ ΈΡΓΟ ΑΥΤΌ ΓΙΑ ΤΗ ΝΈΑ ΤΡΙΕΤΉ ΠΕΡΊΟΔΟ ΑΠΟΤΕΛΕΊΤΑΙ ΑΠΌ: 1 ΔΙΑΔΡΟΜΉ ΤΟΥ ΦΟΡΈΑ ΕΚΜΕΤΆΛΛΕΥΣΗΣ ΕΣΤΙΑΤΟΡΊΩΝ: ΔΙΕΎΘΥΝΣΗ ΠΡΟΕΤΟΙΜΑΣΊΑΣ ΓΕΥΜΆΤΩΝ ΣΤΗ ΝΉΣΟ SFP ΤΗΣ 1ΗΣ ΚΛΊΜΑΚΑΣ ΦΟΡΈΑ ΕΚΜΕΤΆΛΛΕΥΣΗΣ ΔΡΟΜΟΛΟΓΊΩΝ ΓΙΑ ΥΠΗΡΕΣΊΕΣ ΠΡΟΏΘΗΣΗΣ ΚΑΙ ΥΠΟΔΟΧΉΣ: ΑΝΤΙΜΕΤΏΠΙΣΗ ΤΟΥ ΤΟΥΡΙΣΜΟΎ ΣΤΙΣ ΔΙΑΔΡΟΜΈΣ SFP 3 ΤΗΣ ΒΕΡΌΝΑΣ ΜΗΧΑΝΙΚΟΎ ΦΟΡΈΑ ΕΚΜΕΤΆΛΛΕΥΣΗΣ ΣΤΟ SFP LEGNAGO ΚΑΙ ΝΗΣΊ ΤΗΣ ΚΛΊΜΑΚΑΣ 1 ΔΙΑΔΡΟΜΉ ΤΟΥ ΦΟΡΈΑ ΕΚΜΕΤΆΛΛΕΥΣΗΣ ΗΛΕΚΤΡΙΚΉΣ ΕΝΈΡΓΕΙΑΣ ΣΤΗ ΔΙΑΔΡΟΜΉ SFP LEGNAGO 2 ΤΟΥ ΗΛΕΚΤΡΟΝΙΚΟΎ ΦΟΡΈΑ ΕΚΜΕΤΆΛΛΕΥΣΗΣ ΣΤΟ SFP ΤΗΣ ΒΕΡΌΝΑΣ ΚΑΙ ΝΗΣΊ ΤΟΥ ΦΟΡΈΑ ΕΚΜΕΤΆΛΛΕΥΣΗΣ ΤΗΣ ΚΛΊΜΑΚΑΣ 1 ΓΙΑ ΤΗΝ ΕΠΙΣΚΕΥΉ ΜΗΧΑΝΟΚΊΝΗΤΩΝ ΟΧΗΜΆΤΩΝ ΣΤΟ SFP LEGNAGO, ΟΙ ΔΙΑΔΡΟΜΈΣ ΕΚΠΑΊΔΕΥΣΗΣ ΘΑ ΠΡΑΓΜΑΤΟΠΟΙΗΘΟΎΝ ΣΤΗΝ ΕΠΑΡΧΊΑ ΤΗΣ ΒΕΡΌΝΑΣ ΩΣ ΑΠΆΝΤΗΣΗ ΣΤΗΝ (Greek)
22 July 2022
0 references
OVAJ OKVIRNI PROJEKT SADRŽI 9 INTERVENCIJA TIPA FI/Q3T ZA PROVEDBU NOVIH INTERVENCIJA TREĆE GODINE KOJE SE ODNOSE NA RAZLIČITE ČLANOVE U TRAJANJU OD 990 SATI, OD ČEGA 232 STAŽIRANJA, S KOJIMA SU POKRENUTI NOVI TROGODIŠNJI TEČAJEVI KOJI ĆE DOSEGNUTI KVALIFIKACIJE U 2020./2021., KONKRETNO, PONUDA OSPOSOBLJAVANJA ENAIP VENETO I.S. U OVOM PROJEKTU ZA NOVO TROGODIŠNJE RAZDOBLJE SASTOJI SE OD: 1 RUTA OPERATERA RESTORANA: ADRESA ZA PRIPREMU OBROKA NA SFP OTOKU LJESTVICE 1 OPERATERA RUTE ZA PROMOTIVNE I PRIJEM USLUGA: BAVITI SE TURIZMOM NA LINIJAMA OPERATORA STROJARSTVA VERONA SFP 3 U SFP-U LEGNAGO I OTOKU RUTE ELEKTRIČNOG OPERATERA SKALE 1 NA LINIJI SFP-A LEGNAGO 2 ELEKTRONIČKOG OPERATERA U SFP-U VERONE I OTOKU OPERATORA RUTE SKALE 1 DO POPRAVKA MOTORNIH VOZILA U SFP-U LEGNAGO, STAZE ZA OSPOSOBLJAVANJE PROVEST ĆE SE U POKRAJINI VERONA KAO ODGOVOR NA (Croatian)
22 July 2022
0 references
ACEST PROIECT-CADRU CONȚINE 9 INTERVENȚII DE TIP FI/Q3T, PENTRU PUNEREA ÎN APLICARE A INTERVENȚIILOR NOI DIN AL TREILEA AN LEGATE DE DIFERIȚI MEMBRI, FIECARE CU DURATA DE 990 DE ORE, DIN CARE 232 DE STAGII, CU CARE SE LANSEAZĂ NOI CURSURI DE TREI ANI CARE VOR AJUNGE LA CALIFICARE ÎN SPECIAL ÎN CADRUL A.F. 2020/2021, OFERTA DE FORMARE A ENAIP VENETO I.S. ÎN CADRUL ACESTUI PROIECT PENTRU NOUA PERIOADĂ DE TREI ANI CONSTĂ ÎN: 1 TRASEU AL OPERATORULUI RESTAURANTULUI: ADRESAȚI PREGĂTIREA MESELOR ÎN INSULA SFP DE PE SCARA 1 A OPERATORULUI RUTEI CĂTRE SERVICIILE DE PROMOVARE ȘI RECEPȚIE: ABORDAREA TURISMULUI ÎN VERONA SFP 3 RUTE DE OPERATOR MECANIC ÎN SFP LEGNAGO ȘI INSULA DE SCARA 1 TRASEU DE OPERATOR ELECTRIC ÎN SFP DE LEGNAGO 2 TRASEU DE OPERATOR ELECTRONIC ÎN SFP DIN VERONA ȘI INSULA OPERATORULUI DE TRASEU SCARA 1 PENTRU REPARAREA AUTOVEHICULELOR ÎN SFP DIN LEGNAGO TRASEELE DE FORMARE VOR FI EFECTUATE ÎN PROVINCIA VERONA, CA RĂSPUNS LA (Romanian)
22 July 2022
0 references
TENTO RÁMCOVÝ PROJEKT OBSAHUJE 9 INTERVENCIÍ TYPU FI/Q3T NA REALIZÁCIU NOVÝCH OPATRENÍ TRETIEHO ROKA TÝKAJÚCICH SA RÔZNYCH ČLENOV, Z KTORÝCH KAŽDÝ TRVÁ 990 HODÍN, Z TOHO 232 STÁŽÍ, S KTORÝMI SA ZAČÍNAJÚ NOVÉ TROJROČNÉ KURZY, KTORÉ DOSIAHNU KVALIFIKÁCIU V 2020/2021 A.F., KONKRÉTNE PONUKA ODBORNEJ PRÍPRAVY ENAIP VENETO I.S. V TOMTO PROJEKTE NA NOVÉ TROJROČNÉ OBDOBIE POZOSTÁVA Z: 1 TRASA PREVÁDZKOVATEĽA REŠTAURÁCIE: ADRESNÁ PRÍPRAVA JEDÁL NA OSTROVE SFP STUPNICE 1 PREVÁDZKOVATEĽ TRASY NA PROPAGAČNÉ A RECEPČNÉ SLUŽBY: RIEŠIŤ CESTOVNÝ RUCH NA TRASE VERONA SFP 3 MECHANICKÝCH OPERÁTOROV V SFP LEGNAGO A NA OSTROVE STUPNICE 1 TRASY PREVÁDZKOVATEĽA ELEKTRICKEJ ENERGIE NA TRASE SFP LEGNAGO 2 ELEKTRONICKÉHO OPERÁTORA V SFP VERONA A NA OSTROVE PREVÁDZKOVATEĽA TRASY STUPNICE 1 NA OPRAVU MOTOROVÝCH VOZIDIEL V SFP LEGNAGO, VÝCVIKOVÉ CESTY SA BUDÚ VYKONÁVAŤ V PROVINCII VERONA V REAKCII NA (Slovak)
22 July 2022
0 references
DAN IL-PROĠETT QAFAS FIH 9 INTERVENTI TAT-TIP FI/Q3T, GĦALL-IMPLIMENTAZZJONI TA’ INTERVENTI ĠODDA TAT-TIELET SENA RELATATI MAD-DIVERSI MEMBRI LI KULL WIEĦED IDUM 990 SIEGĦA, LI MINNHOM 232 TA’ APPRENDISTATI, LI PERMEZZ TAGĦHOM JITNEDEW KORSIJIET ĠODDA TA’ TLIET SNIN LI SE JIKSBU KWALIFIKA FL-A.F 2020/2021 B’MOD SPEĊIFIKU, L-OFFERTA TA’ TAĦRIĠ TAL-ENAIP VENETO I.S. F’DAN IL-PROĠETT GĦALL-PERJODU L-ĠDID TA’ TLIET SNIN TIKKONSISTI MINN: ROTTA 1 TA’ OPERATUR TAR-RISTORANTI: TINDIRIZZA T-TĦEJJIJA TAL-IKLIET FIL-GŻIRA SFP TAL-OPERATUR TAR-ROTTA TAL-ISKALA 1 GĦAS-SERVIZZI TA’ PROMOZZJONI U TA’ AKKOLJENZA: TINDIRIZZA T-TURIŻMU FIR-ROTOT VERONA SFP 3 TA’ OPERATUR MEKKANIKU FL-SFP TA’ LEGNAGO U L-GŻIRA TAR-ROTTA SKALA 1 TA’ OPERATUR ELETTRIKU FIR-ROTTA SFP TA’ LEGNAGO 2 TA’ OPERATUR ELETTRONIKU FL-SFP TA’ VERONA U L-GŻIRA TAL-OPERATUR TAR-ROTTA SKALA 1 GĦAT-TISWIJA TA’ VETTURI BIL-MUTUR FL-SFP TA’ LEGNAGO, IL-MOGĦDIJIET TA’ TAĦRIĠ SE JITWETTQU FIL-PROVINĊJA TA’ VERONA B’REAZZJONI GĦALL— (Maltese)
22 July 2022
0 references
O PRESENTE PROJETO-QUADRO CONTÉM 9 INTERVENÇÕES DE TIPO FI/Q3T, PARA A EXECUÇÃO DE NOVAS INTERVENÇÕES DE TERCEIRO ANO RELATIVAS AOS VÁRIOS MEMBROS COM UMA DURAÇÃO CADA 990 HORAS, DAS QUAIS SÃO LANÇADAS 232 INTERNSHIPS, COM AS NOVAS CURSAS DE TRÊS ANOS QUE REALIZARÃO A QUALIFICAÇÃO EM 2020/2021 A.F. ESPECIFICAMENTE, A OFERTA DE FORMAÇÃO DO ENAIP VENETO I.S. NESTE PROJETO PARA O NOVO PERÍODO TRÊS ANOS CONSISTE: 1 VIA DO OPERADOR RESTAURANTE: PREPARAÇÃO DO ENDEREÇO DAS RELAÇÕES NA ILHA SFP DO OPERADOR DE VIA DA ESCALA 1 PARA OS SERVIÇOS DE PROMOÇÃO E RECEÇÃO: TURISMO DE ENDEREÇO NA VERONA SFP 3 VIAS DE OPERADOR MECÂNICO NA SFP DE LEGNAGO E ISLANDA DA SCALE 1 VIA DE OPERADOR ELÉCTRICO NA SFP DE LEGNAGO 2 VIA DE OPERADOR ELECTRÓNICO NA SFP DE VERONA E ISLANDA DA SCALE 1 VIA DE OPERADOR ELÉCTRICO À REPARAÇÃO DE VEÍCULOS A MOTOR NA SFP DE LEGNAGO AS PAS DE FORMAÇÃO SERÃO REALIZADAS NA PROVINCESSÃO DA VERONA EM RESPOSTA À VERONA (Portuguese)
22 July 2022
0 references
TÄMÄ PUITEHANKE SISÄLTÄÄ 9 FI/Q3T-TYYPPISTÄ TOIMENPIDETTÄ, JOIDEN TARKOITUKSENA ON TOTEUTTAA UUSIA KOLMANNEN VUODEN TOIMIA, JOTKA LIITTYVÄT JÄSENIIN, JOTKA KESTÄVÄT 990 TUNTIA. NIISTÄ 232 HARJOITTELUJAKSOA, JOILLA KÄYNNISTETÄÄN UUSIA KOLMIVUOTISIA KURSSEJA, JOTKA SAAVUTTAVAT TUTKINNON 2020/2021 A.F.:SSÄ, ENAIP VENETO I.S.:N KOULUTUSTARJOUS TÄSSÄ HANKKEESSA UUDELLE KOLMIVUOTISJAKSOLLE KOOSTUU SEURAAVISTA: 1 RAVINTOLAOPERAATTORIN REITTI: KÄSITELLÄÄN ATERIOIDEN VALMISTELUA SFP-SAARELLA MITTAKAAVAN 1 REITIN OPERAATTORILLE MYYNNINEDISTÄMIS- JA VASTAANOTTOPALVELUIHIN: OSOITE MATKAILU VERONA SFP 3 MEKAANISEN OPERAATTORIN SFP LEGNAGO JA SAARELLA MITTAKAAVASSA 1 SÄHKÖOPERAATTORIN SFP LEGNAGO 2 REITIN SÄHKÖISEN OPERAATTORIN SFP VERONAN SFP JA SAAREN 1 REITIN OPERAATTORI KORJAUS MOOTTORIAJONEUVOJEN SFP LEGNAGOSSA KOULUTUSREITIT SUORITETAAN VERONAN MAAKUNNASSA VASTAUKSENA (Finnish)
22 July 2022
0 references
NINIEJSZY PROJEKT RAMOWY OBEJMUJE 9 INTERWENCJI TYPU FI/Q3T W CELU REALIZACJI NOWYCH, TRZECIEGO ROKU INTERWENCJI DOTYCZĄCYCH POSZCZEGÓLNYCH CZŁONKÓW TRWAJĄCYCH 990 GODZIN, Z CZEGO 232 STAŻE, W RAMACH KTÓRYCH ROZPOCZYNA SIĘ NOWE TRZYLETNIE KURSY, KTÓRE UZYSKAJĄ KWALIFIKACJE W ROKU 2020/2021, W SZCZEGÓLNOŚCI OFERTA SZKOLENIOWA ENAIP VENETO I.S. W RAMACH TEGO PROJEKTU NA NOWY OKRES TRZECH LAT OBEJMUJE: 1 TRASA OPERATORA RESTAURACJI: ADRES PRZYGOTOWANIA POSIŁKÓW NA WYSPIE SFP W SKALI 1 OPERATORA TRASY DO USŁUG PROMOCYJNYCH I RECEPCYJNYCH: ZAJĄĆ SIĘ TURYSTYKĄ W WERONIE SFP 3 TRAS OPERATORA MECHANICZNEGO W SFP LEGNAGO I WYSPIE SKALI 1 TRASA OPERATORA ELEKTRYCZNEGO W SFP LEGNAGO 2 TRASA OPERATORA ELEKTRONICZNEGO W SFP WERONA I WYSPA OPERATORA W SKALI 1 DO NAPRAWY POJAZDÓW SILNIKOWYCH W RAMACH SFP LEGNAGO ŚCIEŻKI SZKOLENIOWE BĘDĄ PROWADZONE W PROWINCJI WERONA W ODPOWIEDZI NA (Polish)
22 July 2022
0 references
TA OKVIRNI PROJEKT VSEBUJE 9 UKREPOV VRSTE FI/Q3T ZA IZVEDBO NOVIH TRILETNIH INTERVENCIJ V ZVEZI Z RAZLIČNIMI ČLANI, KI TRAJAJO 990 UR, OD TEGA 232 PRIPRAVNIŠTVA, S KATERIMI SE ZAČENJAJO NOVI TRILETNI TEČAJI, KI BODO PRIDOBILI KVALIFIKACIJE V LETU 2020/2021. PONUDBA USPOSABLJANJA ENAIP VENETO I.S. V TEM PROJEKTU ZA NOVO TRILETNO OBDOBJE JE SESTAVLJENA IZ: 1 POT UPRAVLJAVCA RESTAVRACIJE: OBRAVNAVA PRIPRAVO OBROKOV NA OTOKU SFP 1 OPERATORJA PROGE LESTVICE 1 DO STORITEV PROMOCIJE IN SPREJEMA: OBRAVNAVA TURIZEM NA PROGAH STROJNEGA OPERATERJA VERONA SFP 3 V SFP LEGNAGO IN OTOKU NA PROGI 1 ELEKTRIČNEGA OPERATERJA LESTVICE 1 NA PROGI SFP DRUŽBE LEGNAGO 2 ELEKTRONSKEGA OPERATERJA V SFP VERONA IN OTOKU UPRAVLJAVCA PROGE LESTVICE 1 ZA POPRAVILO MOTORNIH VOZIL V SFP LEGNAGO, V POKRAJINI VERONA PA SE BODO KOT ODGOVOR NA (Slovenian)
22 July 2022
0 references
TENTO RÁMCOVÝ PROJEKT OBSAHUJE 9 ZÁSAHŮ TYPU FI/Q3T PRO PROVÁDĚNÍ NOVÝCH TŘÍLETÝCH ZÁSAHŮ TÝKAJÍCÍCH SE JEDNOTLIVÝCH ČLENŮ V DÉLCE 990 HODIN, Z TOHO 232 STÁŽÍ, S NIMIŽ JSOU ZAHÁJENY NOVÉ TŘÍLETÉ KURZY, KTERÉ DOSÁHNOU KVALIFIKACE V ROCE 2020/2021, KONKRÉTNĚ NABÍDKA ODBORNÉ PŘÍPRAVY ENAIP VENETO I.S. V TOMTO PROJEKTU PRO NOVÉ TŘÍLETÉ OBDOBÍ: 1 TRASA PROVOZOVATELE RESTAURACE: ADRESA PŘÍPRAVA JÍDEL NA OSTROVĚ SFP ZE STUPNICE 1 PROVOZOVATELE TRASY NA PROPAGAČNÍ A PŘIJÍMACÍ SLUŽBY: ŘEŠIT CESTOVNÍ RUCH VE VERONA SFP 3 TRASY MECHANICKÉHO PROVOZOVATELE V SFP LEGNAGO A OSTROV 1 TRASY ELEKTRICKÉHO OPERÁTORA V SFP LEGNAGO 2 TRASA ELEKTRONICKÉHO OPERÁTORA V SFP VERONA A OSTROV 1 PROVOZOVATELE TRASY PRO OPRAVY MOTOROVÝCH VOZIDEL V SFP LEGNAGO, VÝCVIKOVÉ TRASY BUDOU PROVÁDĚNY V PROVINCII VERONA V REAKCI NA (Czech)
22 July 2022
0 references
ŠIS PAGRINDŲ PROJEKTAS APIMA 9 FI/Q3T TIPO INTERVENCINES PRIEMONES, SKIRTAS ĮGYVENDINTI NAUJAS TREČIŲJŲ METŲ INTERVENCINES PRIEMONES, SUSIJUSIAS SU ĮVAIRIAIS NARIAIS, KURIŲ KIEKVIENAS TRUNKA 990 VALANDŲ, IŠ KURIŲ 232 STAŽUOČIŲ, SU KURIOMIS PRADEDAMI NAUJI TREJŲ METŲ KURSAI, KURIE ĮGIS KVALIFIKACIJĄ 2020/2021 A.F., KONKREČIAI, ENAIP VENETO I.S. MOKYMO PASIŪLYMAS ŠIAME PROJEKTE NAUJAM TREJŲ METŲ LAIKOTARPIUI APIMA: 1 RESTORANO OPERATORIAUS MARŠRUTAS: SPRĘSTI MAISTO RUOŠIMO SFP SALOJE, KURIOJE YRA 1 MARŠRUTO OPERATORIUS, Į PARDAVIMO SKATINIMO IR PRIĖMIMO PASLAUGAS: ADRESAS TURIZMUI VERONA SFP 3 MECHANINIO OPERATORIAUS MARŠRUTUOSE LEGNAGO SFP IR 1 KLASĖS ELEKTROS OPERATORIAUS SFP LINIJOJE „LEGNAGO 2“ ELEKTRONINIO OPERATORIAUS SFP VERONOS SFP IR 1 MARŠRUTO OPERATORIAUS SALOJE, SIEKIANT REMONTUOTI MOTORINES TRANSPORTO PRIEMONES LEGNAGO SFP, MOKYMO TAKAI BUS VYKDOMI VERONOS PROVINCIJOJE REAGUOJANT Į (Lithuanian)
22 July 2022
0 references
ŠIS PAMATPROJEKTS IETVER 9 FI/Q3T VEIDA INTERVENCES, LAI ĪSTENOTU JAUNAS TREŠO GADU INTERVENCES, KAS SAISTĪTAS AR DAŽĀDIEM DALĪBNIEKIEM UN KAS KATRS ILGST 990 STUNDAS, NO KURĀM 232 PRAKSES VIETAS TIEK UZSĀKTAS, AR KURĀM TIEK UZSĀKTI JAUNI TRĪS GADU KURSI, KAS IEGŪS KVALIFIKĀCIJU 2020./2021. GADA A.F. KONKRĒTI, ENAIP VENETO I.S. MĀCĪBU PIEDĀVĀJUMS ŠAJĀ PROJEKTĀ JAUNAJAM TRĪS GADU PERIODAM IETVER: 1 RESTORĀNA OPERATORA MARŠRUTS: ADRESE MALTĪŠU GATAVOŠANAI SFP 1. MĒROGA SALAS MARŠRUTA OPERATORAM REKLĀMAS UN UZŅEMŠANAS PAKALPOJUMIEM: ADRESĒT TŪRISMU VERONAS SFP 3 MEHĀNISKO IEKĀRTU OPERATORU MARŠRUTOS LEGNAGO SFP UN ELEKTROSAKARU OPERATORA SFP LANGAGO 2 LĪNIJAS MĒROGA 1 MARŠRUTA ELEKTRONIKAS OPERATORA LĪNIJĀ VERONAS SFP UN SKALAS 1 MARŠRUTA OPERATORA SALĀ, LAI VEIKTU MEHĀNISKO TRANSPORTLĪDZEKĻU REMONTU LEGNAGO SFP, VERONAS PROVINCĒ TIKS VEIKTI MĀCĪBU CEĻI, REAĢĒJOT UZ (Latvian)
22 July 2022
0 references
ТОЗИ РАМКОВ ПРОЕКТ СЪДЪРЖА 9 ИНТЕРВЕНЦИИ ОТ ТИПА FI/Q3T ЗА ИЗПЪЛНЕНИЕ НА НОВИ ИНТЕРВЕНЦИИ ЗА ТРЕТА ГОДИНА, СВЪРЗАНИ С РАЗЛИЧНИТЕ ЧЛЕНОВЕ, ВСЕКИ С ПРОДЪЛЖИТЕЛНОСТ 990 ЧАСА, ОТ КОИТО 232 СТАЖОВЕ, С КОИТО СЕ СТАРТИРАТ НОВИ ТРИГОДИШНИ КУРСОВЕ, КОИТО ЩЕ ПОЛУЧАТ КВАЛИФИКАЦИЯ ПО-СПЕЦИАЛНО В 2020/2021 A.F., ПРЕДЛОЖЕНИЕТО ЗА ОБУЧЕНИЕ НА ENAIP VENETO I.S. ПО ТОЗИ ПРОЕКТ ЗА НОВИЯ ТРИГОДИШЕН ПЕРИОД СЕ СЪСТОИ ОТ: 1 МАРШРУТ НА ОПЕРАТОРА НА РЕСТОРАНТА: ОРГАНИЗИРАНЕ НА ПРИГОТВЯНЕТО НА ХРАНА В SFP ISLAND OF SCALE 1 МАРШРУТЕН ОПЕРАТОР ЗА ПРОМОЦИОНАЛНИ И ПРИЕМНИ УСЛУГИ: ДА СЕ ОБЪРНЕ ВНИМАНИЕ НА ТУРИЗМА ПО МАРШРУТИТЕ НА МЕХАНИЧЕН ОПЕРАТОР ВЕРОНА SFP 3 В SFP НА ЛЕГНАГО И ОСТРОВ НА ТРАСЕТО ОТ СКАЛА 1 НА ЕЛЕКТРИЧЕСКИЯ ОПЕРАТОР ПО МАРШРУТА SFP НА LEGNAGO 2 НА ЕЛЕКТРОННИЯ ОПЕРАТОР В SFP НА ВЕРОНА И ОСТРОВ НА ОПЕРАТОРА НА 1-ВА СКАЛА ЗА РЕМОНТ НА МОТОРНИ ПРЕВОЗНИ СРЕДСТВА В SFP НА LEGNAGO, ОБУЧИТЕЛНИТЕ ПЪТЕКИ ЩЕ БЪДАТ ПРОВЕДЕНИ В ПРОВИНЦИЯ ВЕРОНА В ОТГОВОР НА (Bulgarian)
22 July 2022
0 references
EZ A KERETPROJEKT 9 FI/Q3T-TÍPUSÚ BEAVATKOZÁST TARTALMAZ, AMELYEK CÉLJA A KÜLÖNBÖZŐ TAGOKHOZ KAPCSOLÓDÓ ÚJ, 990 ÓRÁS BEAVATKOZÁSOK VÉGREHAJTÁSA, AMELYEK KÖZÜL 232 SZAKMAI GYAKORLAT INDUL, AMELLYEL A 2020/2021-ES AF-BEN KÉPESÍTÉST ELÉRŐ ÚJ HÁROMÉVES TANFOLYAMOK INDULNAK, KONKRÉTAN AZ ENAIP VENETO I.S. KÉPZÉSI KÍNÁLATA EBBEN A PROJEKTBEN AZ ÚJ HÁROMÉVES IDŐSZAKRA A KÖVETKEZŐKBŐL ÁLL: 1 ÉTTERMI ÜZEMELTETŐ ÚTVONALA: AZ ÉTKEZÉSEK ELŐKÉSZÍTÉSE AZ SFP 1-ES SKÁLÁJÚ ÚTVONAL-ÜZEMELTETŐJÉNEK SZIGETÉN PROMÓCIÓS ÉS RECEPCIÓS SZOLGÁLTATÁSOKRA: FOGLALKOZZON TURIZMUSSAL A VERONA SFP 3 MECHANIKUS ÜZEMELTETŐ ÚTVONALAIN A LEGNAGO SFP-BEN ÉS A LEGNAGO 2 SFP ELEKTROMOS ÜZEMELTETŐJÉNEK AZ SFP-BEN VERONA ÉS SZIGETÉN, A LEGNAGOI SFP-BEN ÉS A LEGNAGOI SFP-BEN A GÉPJÁRMŰVEK JAVÍTÁSÁRA IRÁNYULÓ, A LEGNAGOI SFP-N BELÜLI ELEKTRONIKUS SZOLGÁLTATÓ SFP-JÉN BELÜL, A KÉPZÉSI UTAKAT VERONA TARTOMÁNYBAN HAJTJÁK VÉGRE. (Hungarian)
22 July 2022
0 references
SA CHREAT-THIONSCADAL SEO TÁ 9 N-IDIRGHABHÁLACHA DE CHINEÁL FI/Q3T, CHUN IDIRGHABHÁLACHA NUA TRÍÚ BLIANA A CHUR CHUN FEIDHME A BHAINEANN LEIS NA COMHALTAÍ ÉAGSÚLA A MHAIREANN 990 UAIR AN CHLOIG, LENA SEOLTAR 232 DE INTÉIRNEACHTAÍ, LENA SEOLTAR CÚRSAÍ NUA TRÍ BLIANA A BHAINFIDH CÁILÍOCHT AMACH IN A.F. 2020/2021 GO SONRACH, IS ÉARD ATÁ I GCEIST LEIS AN TAIRISCINT OILIÚNA AR ENAIP VENETO I.S. SA TIONSCADAL SEO DON TRÉIMHSE NUA TRÍ BLIANA: 1 BHEALACH AN OIBREORA BIALAINNE: AGHAIDH A THABHAIRT AR ULLMHÚ BÉILÍ SAN OIBREOIR BEALAIGH AR SCÁLA 1 AR OILEÁN SFP CHUIG SEIRBHÍSÍ POIBLÍOCHTA AGUS FÁILTITHE: AGHAIDH A THABHAIRT AR THURASÓIREACHT I MBEALACH VERONA SFP 3 D’OIBREOIR MEICNIÚIL I SFP LEGNAGO AGUS AR OILEÁN AN BHEALAIGH SCÁLA 1 D’OIBREOIR LEICTREACH I MBEALACH SFP LEGNAGO 2 D’OIBREOIR LEICTREONACH I SFP VERONA AGUS AR OILEÁN AN OIBREORA BEALAIGH SCÁLA 1 CHUN MÓTARFHEITHICLÍ A DHEISIÚ I SFP LEGNAGO DÉANFAR NA COSÁIN OILIÚNA I GCÚIGE VERONA MAR FHREAGRA AR AN (Irish)
22 July 2022
0 references
DETTA RAMPROJEKT OMFATTAR 9 INSATSER AV FI/Q3T-TYP, FÖR GENOMFÖRANDE AV NYA TREDJEÅRSINTERVENTIONER AVSEENDE DE OLIKA MEDLEMMARNA VAR OCH EN PÅ 990 TIMMAR, VARAV 232 AV PRAKTIKPLATSER, MED VILKA NYA TREÅRIGA KURSER INLEDS SOM KOMMER ATT BLI KVALIFICERADE UNDER 2020/2021 A.F. SPECIFIKT, UTBILDNINGSERBJUDANDET FÖR ENAIP VENETO I.S. I DETTA PROJEKT FÖR DEN NYA TREÅRSPERIODEN BESTÅR AV: 1 RESTAURANGOPERATÖRSVÄG: TILLREDNING AV MÅLTIDER PÅ SFP-ÖN I SKALA 1-RUTTOPERATÖR TILL MARKNADSFÖRINGS- OCH MOTTAGNINGSTJÄNSTER: TA ITU MED TURISMEN I VERONA SFP 3 RUTTER AV MEKANISK OPERATÖR I SFP I LEGNAGO OCH Ö I SKALA 1 RUTTEN AV ELOPERATÖR I SFP I LEGNAGO 2 RUTTEN ELEKTRONISK OPERATÖR I SFP I VERONA OCH ÖN I SKALA 1 LINJE OPERATÖR FÖR REPARATION AV MOTORFORDON I SFP I LEGNAGO, UTBILDNINGSVÄGARNA KOMMER ATT GENOMFÖRAS I PROVINSEN VERONA SOM SVAR PÅ (Swedish)
22 July 2022
0 references
SEE RAAMPROJEKT SISALDAB 9 FI/Q3T-TÜÜPI SEKKUMIST, ET RAKENDADA UUSI KOLMANDA AASTA SEKKUMISI, MIS ON SEOTUD ERINEVATE LIIKMETEGA JA KESTAVAD IGAÜKS 990 TUNDI, MILLEST 232 PRAKTIKAKOHTA, MILLEGA KÄIVITATAKSE UUED KOLMEAASTASED KURSUSED, MIS SAAVUTAVAD KVALIFIKATSIOONI 2020./2021. AASTAL, KOOSNEB KONKREETSELT ENAIP VENETO I.S. KOOLITUSPAKKUMISEST SELLES PROJEKTIS UUEKS KOLMEAASTASEKS PERIOODIKS: 1 RESTORANIOPERAATORI MARSRUUT: TEGELEDA TOIDUVALMISTAMISEGA SFP MASTAABISAAREL 1. MARSRUUDI KÄITAJAGA, ET OSUTADA REKLAAMI- JA VASTUVÕTUTEENUSEID: TEGELEDA TURISMIGA VERONA SFP 3 MEHAANILISTE OPERAATORITE LIINIDEL LEGNAGO SFP-S JA SAAREL, MIS HÕLMAB LEGNAGO 2 SFP ELEKTROONILISE OPERAATORI LIINI SFP JA 1. SKAALA SAAREL ASUVAT ELEKTRIOPERAATORIT, ET PARANDADA MOOTORSÕIDUKEID LEGNAGO SFP-S, KORRALDATAKSE KOOLITUSTEED VERONA PROVINTSIS VASTUSENA (Estonian)
22 July 2022
0 references
VERONA
0 references
8 April 2023
0 references