Restoration and strengthening of the wall of a ulcer. “Haydushko Welle” and its facilities, located in the land of Galabovo Municipality, with the aim of improving its technical and operational condition, protecting technical and social infrastructure, as well as increasing the protection of the population from flooding (Q3884837)
Jump to navigation
Jump to search
Project Q3884837 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Restoration and strengthening of the wall of a ulcer. “Haydushko Welle” and its facilities, located in the land of Galabovo Municipality, with the aim of improving its technical and operational condition, protecting technical and social infrastructure, as well as increasing the protection of the population from flooding |
Project Q3884837 in Bulgaria |
Statements
754,454.62 Bulgarian lev
0 references
384,771.86 Euro
0 references
887,593.69 Bulgarian lev
0 references
452,672.78 Euro
0 references
85.0 percent
0 references
13 February 2019
0 references
12 August 2021
0 references
ОБЩИНА ГЪЛЪБОВО
0 references
Проектното предложение се състои в укрепването на язовирната стена и съоръженията по нея. Предвидените строителни дейности ще се извършват в коритото на р. Джелепска в района на язовирната стена на язовир „Хайдушко кладенче“. Участъкът на строителство дължина и ширина от по 150 м в района на стената и 500 м по протежение на реката за прочистване на храсти и дървета – на разстояние от 200 м след края на регулацията на селото по протежение на реката. Дейностите ще включват следното:•Възстановяване на въздушния откос на стената•Разширение и облицоване на енергогасителя и бързотока с геоклетки•Укрепване на енергогасителното легло на язовира с решетъчни тела с трошен камък•Изграждане на изходяща шахта на основния изпускатал и енергогасител след нея•Възстановяване на водосток на дере след створа на яз. стена и укрепването му•Отстраняване на строителни отпадъци•Изрязване на храсти и сеч на дървета, изваждане на корени – в участък с дължина от 500 м след язовирната стена цялата дължина на коригирания участък•Подравняване на терасата на реката – по цялата дължина на участъка от 500 м след реката за прочистване. (Bulgarian)
0 references
The project proposal consists of strengthening the dam and its facilities. The planned construction activities will be carried out in the Djelepska river bed in the area of the dam of the Haidushko Kladenche dam. The section of construction length and width of 150 m in the area of the wall and 500 m along the river to cleanse shrubs and trees — at a distance of 200 m after the end of the regulation of the village along the river. The activities will include the following: •Recovery of the air swivel of the wall •Extension and lining of the energy extinguisher and the rapidity with geocells •Strengthening the energy-extinguishing bed of the dam with crushed stone •Construction of the outlet shaft of the main discharge and energy extinguisher after it •Restore the culvert of a gullet of a gullet after the creation of a wall dam and its strengthening •Remediation of construction waste •Stripping of bushes and felling of trees, extraction of roots — in a section 500 m long after the dam, the entire length of the rectified section •Alignment of the terrace of the river — along the entire length of the section of 500 m after the river for purification. (English)
2 December 2021
0.7616315573802633
0 references
La proposition de projet consiste à renforcer le barrage et ses installations. Les travaux de construction prévus seront réalisés dans le lit de la rivière Djelepska, dans la zone du barrage du barrage de Haidushko kladenche. Le tronçon de construction longueur et largeur de 150 m dans la zone du mur et 500 m le long de la rivière pour nettoyer les arbustes et les arbres — à une distance de 200 m après la fin de la régulation du village le long de la rivière. Les activités seront les suivantes: •Récupération de l’air pivotant du mur •Extension et revêtement de l’extincteur d’énergie et la rapidité avec des géocellules •Renforcement du lit d’extinction d’énergie du barrage avec pierre concassée •Construit de l’arbre de sortie de l’extincteur principal et de l’extincteur d’énergie après celui-ci •Restaurer le ponceau d’une goélette d’une goélette après la création d’un barrage mural et son renforcement •Rémédiation des déchets de construction •Rentrage des buissons et abattage d’arbres, extraction des racines — dans une section de 500 m de long après le barrage, toute la longueur de la partie de la rivière rectifiée •La purification de la partie de la rivière (French)
3 December 2021
0 references
Der Projektvorschlag besteht in der Stärkung des Staudamms und seiner Anlagen. Die geplanten Bauarbeiten werden im Flussbett Djelepska im Bereich des Staudamms des Staudamms Haidushko kladenche durchgeführt. Der Abschnitt der Baulänge und Breite von 150 m im Bereich der Mauer und 500 m entlang des Flusses, um Sträucher und Bäume zu reinigen – in einem Abstand von 200 m nach dem Ende der Regelung des Dorfes entlang des Flusses. Die Aktivitäten umfassen die folgenden: •Recovery der Luftschwenkung der Wand •Extension und Auskleidung des Energielöschers und der Schnelligkeit mit Geozellen • Verfestigen des energieverlöschenden Bettes des Damms mit zerkleinertem Stein •Konstruktion des Auslassschachts des Hauptentladungs- und Energielöschers nach ihm • Wiederherstellen des Grabens eines Gullets nach der Schaffung einer Mauerdamm und seiner Stärkung •Remediation von Bauabfällen •Strippen von Büschen und Abholzen von Bäumen, Entnahme von Wurzeln – in einem Abschnitt 500 m lang nach der Damm, die Länge des gesamten Flusses • Die Länge des gesamten Flusses entlang des gesamten Flusses. (German)
4 December 2021
0 references
Het projectvoorstel bestaat uit de versterking van de dam en de faciliteiten ervan. De geplande bouwactiviteiten zullen worden uitgevoerd in de bedding van de Djelepska in het gebied van de dam van de Haidushko kladenche. Het gedeelte van de bouwlengte en breedte van 150 m in het gebied van de muur en 500 m langs de rivier om struiken en bomen te reinigen — op een afstand van 200 m na het einde van de regeling van het dorp langs de rivier. De activiteiten omvatten het volgende: • Herwinning van de luchtzwaai van de muur •Uitbreiding en bekleding van de energieblusser en de snelheid met geocellen •Versterking van het energie-dovenbed van de dam met gemalen steen •Bouw van de uitlaatas van de hoofdontladings- en energieblusser erna •Herstel van de culvert van een gullet na de aanleg van een muurdam en de versterking ervan •Remediatie van bouwafval •Strippen van struiken en het kappen van bomen, wortelswinning — in een sectie 500 m lang na de dam, de volledige lengte van het rectificatiegedeelte langs het terras • (Dutch)
12 December 2021
0 references
La proposta di progetto consiste nel rafforzare la diga e le sue strutture. Le attività di costruzione previste saranno svolte nel letto del fiume Djelepska nella zona della diga della diga Haidushko kladenche. La sezione di costruzione lunghezza e larghezza di 150 m nella zona della parete e 500 m lungo il fiume per pulire arbusti e alberi — ad una distanza di 200 m dopo la fine della regolazione del villaggio lungo il fiume. Le attività comprenderanno quanto segue: •Recupero dell'aria girevole della parete •L'estensione e il rivestimento dell'estintore di energia e la rapidità con geocellule •Rafforzamento del letto di estinzione dell'energia della diga con pietra frantumata •Costruzione dell'albero di uscita dell'estintore principale e dell'estintore di energia dopo esso •Ripristino del culverlo di una gabbia di un gullet dopo la creazione di una diga muraria e del suo rafforzamento •Rimediazione dei rifiuti edilizi •Tagliamento dei cespugli e della caduta di alberi, estrazione delle radici — in una sezione di 500 m di lunghezza dopo la diga, l'intera lunghezza del tratto di riallineamento •l'intero tratto di bonifica •L'estrazione delle radici — in una sezione lunga 500 m dopo la diga, l'intera lunghezza del tratto di reignment • •Recuperamento dei cespugli. (Italian)
13 January 2022
0 references
La propuesta de proyecto consiste en fortalecer la presa y sus instalaciones. Las actividades de construcción previstas se llevarán a cabo en el lecho del río Djelepska en la zona de la presa de la presa de Haidushko kladenche. La sección de construcción de longitud y anchura de 150 m en la zona de la pared y 500 m a lo largo del río para limpiar arbustos y árboles — a una distancia de 200 m después del final de la regulación del pueblo a lo largo del río. Las actividades incluirán las siguientes: •Recuperación del giro del aire de la pared •Extensión y revestimiento del extintor de energía y la rapidez con geocélulas •Reforzar el lecho extintor de energía de la presa con piedra triturada •Construcción del eje de salida de la descarga principal y extintor de energía después de él •Restaurar el alcantarillado de una goleta de una goleta después de la creación de una presa y su fortalecimiento •Remediación de residuos de construcción •Stritura de arbustos y tala de árboles, extracción de raíces — en una sección de 500 m de largo después de la presa, toda la longitud del río — toda la longitud del río. (Spanish)
15 January 2022
0 references
Projektforslaget består i at styrke dæmningen og dens faciliteter. De planlagte byggeaktiviteter vil blive udført i Djelepska flodleje i området for dæmningen i Haidushko kladenche-dæmningen. Afsnittet af konstruktion længde og bredde på 150 m i området af væggen og 500 m langs floden for at rense buske og træer — i en afstand af 200 m efter afslutningen af reguleringen af landsbyen langs floden. Aktiviteterne vil omfatte følgende: •Genvinding af væggens luftsving •Udvidelse og foring af energislukkeren og hurtigheden med geoceller •Styrkelse af dæmningens energislukningsseng med knust sten •Opbygning af afgangsskakten i hovedudladnings- og energislukkeren efter den •Genoprettelse af en svøbe i en svøbe efter dannelsen af en vægdæmning og dens styrkelse •Oprydning af byggeaffald •Stripping af buske og fældning af træer, udvinding af rødder — i en sektion 500 m lang efter dæmningen, hele længden af den berigtigede del •Ændring af hele floden langs hele terrassen. (Danish)
19 July 2022
0 references
Η πρόταση έργου συνίσταται στην ενίσχυση του φράγματος και των εγκαταστάσεων του. Οι σχεδιαζόμενες κατασκευαστικές δραστηριότητες θα εκτελεστούν στην κοίτη του ποταμού Djelepska στην περιοχή του φράγματος Haidushko kladenche. Το τμήμα της κατασκευής μήκους και πλάτους 150 m στην περιοχή του τοίχου και 500 m κατά μήκος του ποταμού για να καθαρίσει θάμνους και δέντρα — σε απόσταση 200 m μετά το τέλος της ρύθμισης του χωριού κατά μήκος του ποταμού. Οι δραστηριότητες θα περιλαμβάνουν τα ακόλουθα: •Ανάκτηση του περιστρεφόμενου αέρα του τοιχώματος •Επέκταση και επένδυση του ενεργειακού πυροσβεστήρα και ταχύτητα με γεωκύτταρα •Ενίσχυση της κλίνης που απορροφά την ενέργεια του φράγματος με θρυμματισμένη πέτρα •Κατασκευή του άξονα εξόδου του κύριου πυροσβεστήρα εκκένωσης και ενέργειας μετά από αυτό •Αποκατάσταση του γλάρου ενός γλάρου μετά τη δημιουργία ενός φράγματος τοίχου και την ενίσχυσή του •Ανόρθωση κατασκευαστικών αποβλήτων •αποκομιδή θάμνων και κοπή δέντρων, εκχύλιση ριζών — σε ένα τμήμα 500 m μήκους μετά το φράγμα, ολόκληρο το μήκος του διορθωμένου τμήματος •Εύγκριση της αναβαθμίδας του ποταμού — σε όλο το μήκος του τμήματος των 500 μέτρων μετά τον ποταμό για καθαρισμό. (Greek)
19 July 2022
0 references
Projektni prijedlog sastoji se od jačanja brane i njezinih objekata. Planirane građevinske aktivnosti provest će se u korito rijeke Djelepske na području brane Haidushko kladenche. Dio građevinske dužine i širine 150 m na području zida i 500 m uz rijeku za čišćenje grmlja i drveća – na udaljenosti od 200 m nakon završetka uređenja sela uz rijeku. Aktivnosti će uključivati sljedeće: •Oporavak zračnog zakretanja zida •proširenje i oblaganje aparata za gašenje energije i brzina geostanica •Jačanje sloja brane za gašenje energije drobljenim kamenom •Izgradnja izlaznog vratila glavnog pražnjenja i aparata za gašenje energije nakon njega •Ponovno vraćanje propusta narukvice na gulletu nakon stvaranja zidne brane i njegovog jačanja •popravljanje građevinskog otpada •Iskorištavanje grmlja i sječa drveća, vađenje korijenja – u dijelu 500 m dugo nakon brane, cijela duljina ispravljenog dijela •usklađivanje terase rijeke – duž cijele duljine dionice od 500 m nakon rijeke za pročišćavanje. (Croatian)
19 July 2022
0 references
Propunerea de proiect constă în consolidarea barajului și a facilităților sale. Activitățile de construcție planificate vor fi efectuate în albia râului Djelepska în zona barajului Haidushko kladenche. Secțiunea de construcție lungime și lățime de 150 m în zona de perete și 500 m de-a lungul râului pentru a curăța arbuști și copaci – la o distanță de 200 m după sfârșitul regulamentului satului de-a lungul râului. Activitățile vor include următoarele: •Recuperarea mișcării de aer a peretelui •Extinderea și căptușeala extinctorului de energie și rapiditatea cu geocelule •Consolidarea patului de energie al barajului cu piatră zdrobită •Construirea arborelui de evacuare a evacuării principale și stingerea energiei după aceasta •Restabilirea fundului unei ecluze de ecluză după crearea unui baraj de perete și consolidarea acestuia •Remedierea deșeurilor de construcție •Întărirea tufișurilor și tăierea arborilor, extragerea rădăcinilor – într-o secțiune lungă de 500 m după baraj, întreaga lungime a secțiunii rectificate a râului •Alignul de-a lungul întregii părți a râului. (Romanian)
19 July 2022
0 references
Návrh projektu spočíva v posilnení priehrady a jej zariadení. Plánované stavebné činnosti sa budú vykonávať na dne rieky Djelepska v oblasti priehrady Haidushko kladenche. Úsek dĺžky a šírky stavby 150 m v oblasti steny a 500 m pozdĺž rieky na čistenie kríkov a stromov – vo vzdialenosti 200 m po skončení regulácie obce pozdĺž rieky. Činnosti budú zahŕňať: •Obnovenie vzduchového otáčania steny •Rozšírenie a podšívka energetického hasiaceho prístroja a rýchlosť pomocou geobuniek • Posilnenie energetického hasiaceho lôžka priehrady drveným kameňom • Výstavba výstupného hriadeľa hlavného vypúšťacieho a energetického hasiaceho prístroja po ňom •Obnoviť priehlbinu pažeráka po vytvorení priehrady na stenu a jej posilnení • Rekultivácia stavebného odpadu • Odrezanie kríkov a výrub stromov, extrakcia koreňov – v úseku 500 m dlho po priehrade, po celej dĺžke rektifikovaného úseku •Zblíženie terasy rieky – po celej dĺžke úseku 500 m za riekou na čistenie. (Slovak)
19 July 2022
0 references
Il-proposta tal-proġett tikkonsisti fit-tisħiħ tad-diga u l-faċilitajiet tagħha. L-attivitajiet ta’ kostruzzjoni ppjanati se jitwettqu fis-sodda tax-xmara Djelepska fiż-żona tad-diga tal-Haidushko kladenche. Is-sezzjoni tat-tul u l-wisa’ tal-kostruzzjoni ta’ 150 m fiż-żona tal-ħajt u 500 m tul ix-xmara biex tnaddaf l-arbuxelli u s-siġar — f’distanza ta’ 200 m wara t-tmiem tar-regolamentazzjoni tal-villaġġ tul ix-xmara. L-attivitajiet se jinkludu dan li ġej: •L-irkupru tal-arja li ddur tal-ħajt •Estensjoni u inforra tat-tagħmir tat-tifi tan-nar tal-enerġija u r-rapidità bil-ġeoċell •It-tisħiħ tas-sodda li titfi l-enerġija tad-diga b’ġebel imfarrak •Kostruzzjoni tax-xaft tal-iżbokk tal-apparat prinċipali għat-tifi tan-nar u tal-enerġija wara dan •Restore l-ħabel ta’ kanal ta’ kanal — l-estrazzjoni ta’ għeruq — f’sezzjoni 500 m twila wara d-diga, it-tul kollu tas-sezzjoni rettifikata tax-xmara. (Maltese)
19 July 2022
0 references
A proposta do projeto consiste no reforço da barragem e das suas instalações. As atividades de construção previstas serão realizadas no leito do rio Djelepska, na zona da barragem da barragem de Haidushko Kladenche. A secção de construção comprimento e largura de 150 m na área da parede e 500 m ao longo do rio para limpar arbustos e árvores — a uma distância de 200 m após o fim do regulamento da aldeia ao longo do rio. As atividades incluirão o seguinte: •Recuperação do ar giratório da parede •Extensão e revestimento do extintor de energia e rapidez com geocélulas •Reforço do leito de extinção de energia da barragem com pedra britada •Construção do poço de saída da descarga principal e do extintor de energia após a mesma •Restauração do casco de um rabo de um rabo após a criação de uma barragem de parede e o seu reforço •Remediação de resíduos de construção •Retirada de arbustos e abate de árvores, extração de raízes — numa secção com 500 m de comprimento após a barragem, todo o comprimento da secção retificada •Alinhamento do terraço do rio — ao longo de todo o comprimento da secção de 500 m após o rio para purificação. (Portuguese)
19 July 2022
0 references
Hanke-ehdotus koskee padon ja sen tilojen vahvistamista. Suunnitellut rakennustyöt toteutetaan Djelepska-joen pohjalla Haidushko kladenchen padon alueella. Osa rakentamisen pituus ja leveys 150 m alueella seinän ja 500 m pitkin joen puhdistaa pensaita ja puita – etäisyydellä 200 m jälkeen lopun säätely kylän pitkin joen. Toimiin kuuluvat muun muassa seuraavat: •Seinän kääntyvän ilmavirran talteenotto •Energiansammuttimen laajeneminen ja vuoraus ja nopeus geosoluilla • padon energiasammutusalustan vahvistaminen murskatulla kivellä • Pääpurkauksen ja energiasammuttimen ulostuloakselin rakentaminen sen jälkeen •Korttikurkkupalautetaan seinäpadon luomisen ja sen vahvistamisen jälkeen • Rakentamisjätteiden korjaaminen •pensaiden ja puiden kaataminen, juurien louhinta – 500 m:n etäisyydellä padon jälkeen, korjatun osan koko pituus •Joen terassisuuntaus – koko pituudelta 500 m joen jälkeen puhdistettavaksi. (Finnish)
19 July 2022
0 references
Propozycja projektu polega na wzmocnieniu zapory i jej obiektów. Planowane prace budowlane będą prowadzone w dnie rzeki Djelepska na obszarze zapory Haidushko kladenche. Odcinek budowy długości i szerokości 150 m w obszarze ściany i 500 m wzdłuż rzeki do oczyszczenia krzewów i drzew – w odległości 200 m po zakończeniu regulacji wsi wzdłuż rzeki. Działania te będą obejmowały: •Odzyskanie obrotu powietrznego ściany •Rozszerzenie i podszewka gaśnicy energetycznej oraz szybkość za pomocą geokomórek •Wzmocnienie koryta gaśniczego zapory za pomocą kruszonego kamienia •Budowa wału wylotowego głównego wyładowania i gaśnicy energii po niej • Przywracanie przepustu przełyku przegubu po utworzeniu tamy ściennej i jej wzmocnieniu • Remediacja odpadów budowlanych • Rozdrabnianie krzewów i wycinanie drzew, wydobycie korzeni – na odcinku 500 m od tamy, cała długość rektyfikowanego odcinka •Wyrównanie tarasu rzeki – na całej długości odcinka 500 m po rzece do oczyszczania. (Polish)
19 July 2022
0 references
Predlog projekta zajema krepitev jezu in njegovih objektov. Načrtovane gradbene dejavnosti se bodo izvajale v strugi reke Djelepske na območju jezu Haidushko kladenche. Odsek gradbene dolžine in širine 150 m na območju stene in 500 m ob reki za čiščenje grmičevja in dreves – na razdalji 200 m po koncu regulacije vasi ob reki. Dejavnosti bodo vključevale naslednje: •Predelava zračnega vrtenja stene • Podaljšanje in obloga aparata za gašenje energije ter hitrost z geocelicami •krepitev ležišča jezu, ki ugaša energijo, z drobljenim kamnom •gradnja izstopne gredi glavnega odvajalnega in energijskega gasilnega aparata za njim • Obnova odpadnega požiralnika požiralnika po nastanku zidnega jezu in njegovi krepitvi •Sanacija gradbenih odpadkov • Izrez grmičevja in sečnja dreves, pridobivanje korenin – v odseku 500 m dolgo po jezu, po celotni dolžini popravljenega odseka •Uskladitev terase reke – vzdolž celotne dolžine odseka 500 m po reki za prečiščevanje. (Slovenian)
19 July 2022
0 references
Návrh projektu spočívá v posílení přehrady a jejích zařízení. Plánované stavební činnosti budou prováděny na dně řeky Djelepska v oblasti přehrady Haidushko kladenche. Úsek stavební délky a šířky 150 m v oblasti zdi a 500 m podél řeky k čištění keřů a stromů – ve vzdálenosti 200 m po konci regulace obce podél řeky. Tyto činnosti budou zahrnovat: •Využití vzduchového otáčení stěny •Rozšíření a obložení energetického hasicího přístroje a rychlost s geobuňkami •Posílení energeticky zhášecího lože přehrady drceným kamenem •Výstavba výstupní šachty hlavního výboje a energetického hasicího přístroje po něm •obnovení propustku hráze po vytvoření hradní přehrady a jeho posílení •Oprava stavebního odpadu •Zastavení keřů a kácení stromů, těžba kořenů – v úseku 500 m dlouhém po přehradě, celé délce opraveného úseku •Zarovnání terasy řeky – po celé délce úseku 500 m po řece pro čištění. (Czech)
19 July 2022
0 references
Projekto pasiūlymu siekiama sustiprinti užtvanką ir jos infrastruktūrą. Planuojama statybos veikla bus vykdoma Djelepska upės dugne Haidushko kladenche užtvankos teritorijoje. Statybos ilgis ir plotis 150 m sienos srityje ir 500 m palei upę išvalyti krūmus ir medžius – ne 200 m atstumu nuo kaimo reguliavimo palei upę pabaigos. Veikla apims: • Sienos oro sukimasis • Energijos gesintuvo pratęsimas ir pamušalas ir spartumas geoelementais • užtvankos energiją gniaužiančios lovos stiprinimas susmulkintu akmeniu •Pagrindinio iškrovos ir energetinio gesintuvo išėjimo veleno statyba po jo •Atkurti stemplės pralaidą po sienos užtvankos sukūrimo ir jos sustiprinimo •statybinių atliekų valymas •Krūmų ir medžių kirtimo darbai, ekstrahavimas šaknų – skyriuje 500 m ilgio po užtvankos, visą ilgį rektifikuotos sekcijos •Suderinimas upės terasos – palei visą ilgį 500 m po upės valymo. (Lithuanian)
19 July 2022
0 references
Projekta priekšlikums ietver dambja un tā iekārtu stiprināšanu. Plānotie būvdarbi tiks veikti Djelepska upes gultnē Haidushko kladenche aizsprosta teritorijā. Būvniecības garuma un platuma posms 150 m sienas teritorijā un 500 m gar upi, lai attīrītu krūmus un kokus — 200 m attālumā pēc ciemata regulēšanas beigām gar upi. Pasākumi ietvers šādas darbības: •Sienas gaisa šarnīra atjaunošana •Enerģijas ugunsdzēšamā aparāta paplašināšana un odere un ātrums ar ģeoelementiem •Dambis enerģijas dzēšanas gultnes stiprināšana ar sasmalcinātu akmeni •Galvenā izlādes un enerģijas ugunsdzēšamā aparāta izplūdes vārpstas būvniecība pēc tā •Atjaunojiet barības vada caurteku pēc sienas dambia izveidošanas un nostiprināšanās • Būvatkritumu attīrīšana •Krūmu krūmu griešana un koku ciršana, sakņu ekstrakcija — 500 m gara posmā pēc aizsprosta, visā upes garumā pa visu terasi. (Latvian)
19 July 2022
0 references
A projektjavaslat a gát és létesítményeinek megerősítését foglalja magában. A tervezett építési tevékenységeket a Djelepska folyómederben, a Haidushko kladenche gát területén fogják végrehajtani. Az építési szakasz hossza és szélessége 150 m a fal területén és 500 m a folyó mentén, hogy megtisztítsa a cserjéket és fákat – 200 m-re a település szabályozásának végét követően a folyó mentén. A tevékenységek a következőket foglalják magukban: •A fal levegőjének visszanyerése •Az energiaoltó kiszélesítése és bélése, valamint a geocellákkal való gyorsulás •A gát energiakioltó ágyának megerősítése zúzott kővel •A fő kisülés és az energiaoltó kivezető tengelyének építése után •A nyelőcső csúcsának visszaállítása a fali gát létrehozása és megerősítése után •Az építési hulladék helyreállítása • Bokrok és fák kivágása, gyökerek kitermelése – a gát után 500 m hosszú szakaszon a korrigált szakasz teljes hossza •A folyó teraszának elválasztása – a folyótól számított 500 m-es szakasz teljes hossza mentén, tisztítás céljából. (Hungarian)
19 July 2022
0 references
Is éard atá i gceist leis an togra tionscadail an damba agus na háiseanna a neartú. Déanfar na gníomhaíochtaí tógála atá beartaithe i leaba abhann Djelepska i gceantar damba Haidushko Kladenche. An chuid den fhad tógála agus leithead 150 m i limistéar an bhalla agus 500 m ar feadh na habhann toir agus crainn a ghlanadh — ar fad 200 m tar éis dheireadh rialú an tsráidbhaile feadh na habhann. Áireofar an méid seo a leanas leis na gníomhaíochtaí: •Aisghabháil sclóine aeir an bhalla • Leathnú agus líneáil an mhúchtóra fuinnimh agus an rapidity le geocells • Leaba múchta fuinnimh an damba a neartú le cloch bhrúite •An seafta asraon den phríomh-urscaoileadh agus an múchtóir fuinnimh a thógáil ina dhiaidh •Athchóirigh lintéar gullet tar éis damba balla a chruthú agus a neartú •Athchóirigh an seafta tógála dramhaíola •Stripping toir agus leagan na gcrann, eastóscadh fréamhacha — in alt 500 m fada tar éis an damba, fad iomlán an ailt cheartaithe •D’ailíniú na habhainn. (Irish)
19 July 2022
0 references
Projektförslaget består i att stärka dammen och dess anläggningar. Den planerade byggverksamheten kommer att genomföras i Djelepska flodbädden i området för dammen vid Haidushko kladenchedammen. Den del av konstruktionen längd och bredd på 150 m i området av väggen och 500 m längs floden för att rengöra buskar och träd – på ett avstånd av 200 m efter slutet av regleringen av byn längs floden. Verksamheten kommer att omfatta följande: •Återhämtning av väggens luftslinga •Utvidgning och beklädnad av energisläckaren och snabbheten med geoceller •Förstärkning av dammens energisläckande bädd med krossad sten •Konstruktion av utloppsaxeln på huvudurladdningen och energisläckaren efter den •Återställa kulverten av en matstrupe efter det att en murdammen har skapats och dess förstärkning •Återgöring av byggnadsavfall •Strippning av buskar och avverkning av träd, utvinning av rötter – i ett avsnitt 500 m långt efter dammen, hela längden på den rektifierade delen av terrassen •Anpassning av hela sträckan längs terrassen. (Swedish)
19 July 2022
0 references
Projektiettepanek hõlmab tammi ja selle rajatiste tugevdamist. Kavandatud ehitustööd viiakse läbi Djelepska jõesängis Haidushko kladenche tammi tammi piirkonnas. Ehituslik lõik, mille pikkus ja laius on 150 m seinaalal ja 500 m piki jõge, et puhastada põõsaid ja puid – 200 m kaugusel pärast jõeäärse küla reguleerimise lõppu. Tegevused hõlmavad järgmist: •Seina pöörleva õhu taaskasutamine •energiakustuti pikendus ja vooder ning kiirus geoelementidega •Tammi energiakustutusvoodi tugevdamine purustatud kiviga • Peamise tühjendus- ja energiakustuti väljalaskevõlli ehitamine pärast seda •Taastatakse pärast seinatammi loomist ja selle tugevnemist purusti puru purustist ja selle tugevnemist •Ehitusjäätmete parandamine • Pukside tühjendamine ja puude langetamine, juurte kaevandamine – 500 m pikk pärast tammi, kogu puhastatud lõigu pikkus •Jõe terrasside ühendamine – kogu 500 m pikkuse lõigu ulatuses pärast jõge puhastamiseks. (Estonian)
19 July 2022
0 references
гр.Гълъбово
0 references
Identifiers
BG16M1OP002-4.004-0002
0 references