REFORM HEALTH CENTER MOTRIL-EAST (GRANADA) (Q3265887)
Jump to navigation
Jump to search
Project Q3265887 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | REFORM HEALTH CENTER MOTRIL-EAST (GRANADA) |
Project Q3265887 in Spain |
Statements
76,000.0 Euro
0 references
95,000.0 Euro
0 references
80.0 percent
0 references
18 May 2018
0 references
31 December 2018
0 references
JUNTA DE ANDALUCIA
0 references
OBRAS DE REFORMA EN LA PLANTA PRIMERA DEL CENTRO DE SALUD MOTRIL-ESTE (MOTRIL, GRANADA), CON LA DOTACIÓN DE DOS NUEVAS CONSULTAS Y ADECUACIÓN DE CLIMATIZACIÓN, CON EL FIN DE MEJORAR LA ACCESIBILIDAD Y SEGURIDAD DEL PACIENTE. (Spanish)
0 references
RENOVATION WORKS ON THE FIRST FLOOR OF THE MOTRIL-EAST HEALTH CENTER (MOTRIL, GRANADA), WITH THE PROVISION OF TWO NEW CONSULTATIONS AND ADAPTATION OF AIR CONDITIONING, IN ORDER TO IMPROVE THE ACCESSIBILITY AND SAFETY OF THE PATIENT. (English)
14 October 2021
0.0171444927736084
0 references
TRAVAUX DE RÉNOVATION AU PREMIER ÉTAGE DU CENTRE DE SANTÉ MOTRIL-EST (MOTRIL, GRENADE), AVEC LA MISE À DISPOSITION DE DEUX NOUVELLES CONSULTATIONS ET L’ADAPTATION DE LA CLIMATISATION, AFIN D’AMÉLIORER L’ACCESSIBILITÉ ET LA SÉCURITÉ DU PATIENT. (French)
6 December 2021
0 references
RENOVIERUNGSARBEITEN IM ERSTEN STOCK DES GESUNDHEITSZENTRUMS MOTRIL-EAST (MOTRIL, GRANADA), MIT DER BEREITSTELLUNG VON ZWEI NEUEN KONSULTATIONEN UND ANPASSUNG DER KLIMAANLAGE, UM DIE ZUGÄNGLICHKEIT UND SICHERHEIT DES PATIENTEN ZU VERBESSERN. (German)
11 December 2021
0 references
RENOVATIEWERKZAAMHEDEN OP DE EERSTE VERDIEPING VAN HET GEZONDHEIDSCENTRUM MOTRIL-EAST (MOTRIL, GRANADA), MET TWEE NIEUWE CONSULTATIES EN AANPASSING VAN AIRCONDITIONING, OM DE TOEGANKELIJKHEID EN VEILIGHEID VAN DE PATIËNT TE VERBETEREN. (Dutch)
18 December 2021
0 references
LAVORI DI RISTRUTTURAZIONE AL PRIMO PIANO DEL CENTRO SANITARIO MOTRIL-EST (MOTRIL, GRANADA), CON LA FORNITURA DI DUE NUOVE CONSULTAZIONI E L'ADATTAMENTO DELL'ARIA CONDIZIONATA, AL FINE DI MIGLIORARE L'ACCESSIBILITÀ E LA SICUREZZA DEL PAZIENTE. (Italian)
17 January 2022
0 references
ΕΡΓΑΣΊΕΣ ΑΝΑΚΑΊΝΙΣΗΣ ΣΤΟΝ ΠΡΏΤΟ ΌΡΟΦΟ ΤΟΥ ΚΈΝΤΡΟΥ ΥΓΕΊΑΣ MOTRIL-EAST (MOTRIL, ΓΡΑΝΆΔΑ), ΜΕ ΤΗΝ ΠΑΡΟΧΉ ΔΎΟ ΝΈΩΝ ΣΥΜΒΟΥΛΏΝ ΚΑΙ ΤΗΝ ΠΡΟΣΑΡΜΟΓΉ ΤΟΥ ΚΛΙΜΑΤΙΣΜΟΎ, ΠΡΟΚΕΙΜΈΝΟΥ ΝΑ ΒΕΛΤΙΩΘΕΊ Η ΠΡΟΣΒΑΣΙΜΌΤΗΤΑ ΚΑΙ Η ΑΣΦΆΛΕΙΑ ΤΟΥ ΑΣΘΕΝΟΎΣ. (Greek)
19 August 2022
0 references
RENOVERING ARBEJDER PÅ FØRSTE SAL I MOTRIL-EAST SUNDHEDSCENTER (MOTRIL, GRANADA), MED LEVERING AF TO NYE KONSULTATIONER OG TILPASNING AF KLIMAANLÆG, FOR AT FORBEDRE TILGÆNGELIGHEDEN OG SIKKERHEDEN FOR PATIENTEN. (Danish)
19 August 2022
0 references
PERUSKORJAUSTYÖT ENSIMMÄISESSÄ KERROKSESSA MOTRIL-ITÄ TERVEYSKESKUS (MOTRIL, GRANADA), TARJOAMALLA KAKSI UUTTA KUULEMISTA JA MUKAUTTAMINEN ILMASTOINTI, JOTTA VOIDAAN PARANTAA POTILAAN SAAVUTETTAVUUTTA JA TURVALLISUUTTA. (Finnish)
19 August 2022
0 references
XOGĦLIJIET TA ‘RINNOVAZZJONI FL-EWWEL SULAR TAĊ-ĊENTRU TAS-SAĦĦA MOTRIL-LVANT (MOTRIL, GRANADA), BIL-PROVVISTA TA’ ŻEWĠ KONSULTAZZJONIJIET ĠODDA U L-ADATTAMENT TAL-ARJA KKUNDIZZJONATA, SABIEX TITTEJJEB L-AĊĊESSIBBILTÀ U S-SIKUREZZA TAL-PAZJENT. (Maltese)
19 August 2022
0 references
MOTRIL-AUSTRUMU VESELĪBAS CENTRA (MOTRIL, GRANADA) PIRMĀ STĀVA RENOVĀCIJAS DARBI AR DIVĀM JAUNĀM KONSULTĀCIJĀM UN GAISA KONDICIONĒŠANAS PIELĀGOŠANU, LAI UZLABOTU PACIENTA PIEEJAMĪBU UN DROŠĪBU. (Latvian)
19 August 2022
0 references
RENOVAČNÉ PRÁCE NA PRVOM POSCHODÍ ZDRAVOTNÍCKEHO CENTRA MOTRIL-VÝCHOD (MOTRIL, GRANADA) S POSKYTNUTÍM DVOCH NOVÝCH KONZULTÁCIÍ A ADAPTÁCIOU KLIMATIZÁCIE S CIEĽOM ZLEPŠIŤ DOSTUPNOSŤ A BEZPEČNOSŤ PACIENTA. (Slovak)
19 August 2022
0 references
OIBREACHA ATHCHÓIRITHE AR AN GCÉAD URLÁR DEN IONAD SLÁINTE MOTRIL-EAST (MOTRIL, GRANADA), LE SOLÁTHAR DHÁ CHOMHAIRLIÚCHÁN NUA AGUS OIRIÚNÚ AERCHÓIRITHE, CHUN INROCHTAINEACHT AGUS SÁBHÁILTEACHT AN OTHAIR A FHEABHSÚ. (Irish)
19 August 2022
0 references
RENOVAČNÍ PRÁCE V PRVNÍM PATŘE ZDRAVOTNÍHO STŘEDISKA MOTRIL-VÝCHOD (MOTRIL, GRANADA) S POSKYTNUTÍM DVOU NOVÝCH KONZULTACÍ A PŘIZPŮSOBENÍ KLIMATIZACE S CÍLEM ZLEPŠIT DOSTUPNOST A BEZPEČNOST PACIENTA. (Czech)
19 August 2022
0 references
OS TRABALHOS DE RENOVAÇÃO NO PRIMEIRO PASSO DO CENTRO DE SAÚDE MÓTRICO-SAÚDE (MOTRIL, GRANADA), COM A PRESTAÇÃO DE DUAS NOVAS CONSULTAS E ADAPTAÇÃO DO AR CONDICIONADO, PARA MELHORAR A ACESSIBILIDADE E A SEGURANÇA DO DOENTE. (Portuguese)
19 August 2022
0 references
RENOVEERIMINE MOTRIL-IDA TERVISEKESKUSE ESIMESEL KORRUSEL (MOTRIL, GRANADA) KOOS KAHE UUE KONSULTATSIOONI JA KLIIMASEADME KOHANDAMISEGA, ET PARANDADA PATSIENDI LIGIPÄÄSETAVUST JA OHUTUST. (Estonian)
19 August 2022
0 references
FELÚJÍTÁSI MUNKÁLATOK A MOTRIL-KELET EGÉSZSÉGÜGYI KÖZPONT (MOTRIL, GRANADA) ELSŐ EMELETÉN, KÉT ÚJ KONZULTÁCIÓ ÉS A LÉGKONDICIONÁLÓ ÁTALAKÍTÁSA RÉVÉN, A BETEG MEGKÖZELÍTHETŐSÉGÉNEK ÉS BIZTONSÁGÁNAK JAVÍTÁSA ÉRDEKÉBEN. (Hungarian)
19 August 2022
0 references
РЕМОНТНИ РАБОТИ НА ПЪРВИЯ ЕТАЖ НА ЗДРАВНИЯ ЦЕНТЪР МОТРИЛ-ИЗТОК (МОТРИЛ, ГРАНАДА), С ПРЕДОСТАВЯНЕ НА ДВЕ НОВИ КОНСУЛТАЦИИ И АДАПТИРАНЕ НА КЛИМАТИКА, С ЦЕЛ ПОДОБРЯВАНЕ НА ДОСТЪПНОСТТА И БЕЗОПАСНОСТТА НА ПАЦИЕНТА. (Bulgarian)
19 August 2022
0 references
MOTRILIO-RYTŲ SVEIKATOS CENTRO (MOTRILAS, GRANADA) PIRMAME AUKŠTE ATLIEKAMI RENOVACIJOS DARBAI, SUTEIKIANT DVI NAUJAS KONSULTACIJAS IR PRITAIKANT ORO KONDICIONAVIMĄ, SIEKIANT PAGERINTI PACIENTO PRIEINAMUMĄ IR SAUGUMĄ. (Lithuanian)
19 August 2022
0 references
RADOVI NA OBNOVI NA PRVOM KATU ZDRAVSTVENOG CENTRA MOTRIL-EAST (MOTRIL, GRANADA), UZ PRUŽANJE DVIJE NOVE KONZULTACIJE I ADAPTACIJU KLIMATIZACIJE, KAKO BI SE POBOLJŠALA DOSTUPNOST I SIGURNOST PACIJENTA. (Croatian)
19 August 2022
0 references
RENOVERINGSARBETE PÅ FÖRSTA VÅNINGEN I MOTRIL-EAST VÅRDCENTRAL (MOTRIL, GRANADA), MED TILLHANDAHÅLLANDE AV TVÅ NYA KONSULTATIONER OCH ANPASSNING AV LUFTKONDITIONERING, FÖR ATT FÖRBÄTTRA TILLGÄNGLIGHETEN OCH SÄKERHETEN FÖR PATIENTEN. (Swedish)
19 August 2022
0 references
LUCRĂRI DE RENOVARE LA PRIMUL ETAJ AL CENTRULUI DE SĂNĂTATE MOTRIL-EST (MOTRIL, GRANADA), CU ASIGURAREA A DOUĂ NOI CONSULTAȚII ȘI ADAPTAREA AERULUI CONDIȚIONAT, ÎN VEDEREA ÎMBUNĂTĂȚIRII ACCESIBILITĂȚII ȘI SIGURANȚEI PACIENTULUI. (Romanian)
19 August 2022
0 references
OBNOVITVENA DELA V PRVEM NADSTROPJU ZDRAVSTVENEGA CENTRA MOTRIL-VZHOD (MOTRIL, GRANADA), Z ZAGOTAVLJANJEM DVEH NOVIH POSVETOVANJ IN PRILAGODITEV KLIMATSKE NAPRAVE, DA BI IZBOLJŠALI DOSTOPNOST IN VARNOST PACIENTA. (Slovenian)
19 August 2022
0 references
PRACE REMONTOWE NA PIERWSZYM PIĘTRZE OŚRODKA ZDROWIA MOTRIL-EAST (MOTRIL, GRANADA), Z ZAPEWNIENIEM DWÓCH NOWYCH KONSULTACJI I ADAPTACJI KLIMATYZACJI, W CELU POPRAWY DOSTĘPNOŚCI I BEZPIECZEŃSTWA PACJENTA. (Polish)
19 August 2022
0 references
12 June 2023
0 references
Motril
0 references
Identifiers
A1971053Z00311
0 references