Modernisation of the Smiltene technics technics Specific Objective 8.1.3. Increase the number of vocational training establishments modernised (Q3057728)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q3057728 in Latvia
Language Label Description Also known as
English
Modernisation of the Smiltene technics technics Specific Objective 8.1.3. Increase the number of vocational training establishments modernised
Project Q3057728 in Latvia

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    1,803,829.9 Euro
    0 references
    2,122,152.81 Euro
    0 references
    85.0 percent
    0 references
    1 April 2017
    0 references
    30 September 2020
    0 references
    Smiltenes tehnikums
    0 references
    0 references

    57°25'45.62"N, 25°54'29.12"E
    0 references

    57°26'4.85"N, 25°54'41.18"E
    0 references

    57°25'45.62"N, 25°54'29.12"E
    0 references

    57°25'45.62"N, 25°54'29.12"E
    0 references

    57°25'45.19"N, 25°54'32.44"E
    0 references

    57°25'45.62"N, 25°54'29.12"E
    0 references

    57°25'33.06"N, 25°54'28.48"E
    0 references
    Projekta mērķis ir profesionālās izglītības kompetences centra Smiltenes tehnikums (turpmāk – Tehnikums) modernizēšana, nodrošinot mācību vides atbilstību tautsaimniecības nozaru attīstībai un uzlabojot profesionālās izglītības pieejamību. Projekta ietvaros plānotās darbības ir tieši vērstas uz šī mērķa izpildi, modernizējot izglītības procesam nepieciešamo materiāli tehnisko bāzi atbalstāmajās prioritārajās izglītības programmās un uzlabojot izglītības iestādes infrastruktūru.Projekts tiek īstenots saskaņā ar Tehnikuma Attīstības un investīciju stratēģiju 2015.–2020. gadam.Lai nodrošinātu 2016. gada 19. aprīļa ministru kabineta noteikumos Nr.249 „Darbības programmas „Izaugsme un nodarbinātība” 8.1.3. specifiskā atbalsta mērķa „Palielināt modernizēto profesionālās izglītības iestāžu skaitu” īstenošanas noteikumi” (turpmāk - aktivitātes MK noteikumi) noteiktā specifiskā mērķa sasniegšanu, Tehnikums kopā ar sadarbības partneri – Valsts izglītības attīstības aģentūru - plāno veikt šādas darbības:1)Hidrobūvju tehniķu mācību manēžas – tehnikas novietnes jaunbūves būvniecība;2)Dienesta viesnīcas „Kalnamuiža 44” pārbūve;3)Alsviķu teritoriālās struktūrvienības (turpmāk – Alsviķu struktūrvienība) dienesta viesnīcas un mācību korpusu ēku savienotajā pārejā divu diagonālo kāpņu pacēlāju uzstādīšana un inženierkomunikāciju atjaunošana dienesta viesnīcā (siltā ūdens apgādes sistēmas izveidošana, kanalizācijas sistēmas atjaunošana, aukstā ūdens apgādes sistēmas atjaunošana, santehnikas ierīču nomaiņa, ugunsdzēsības ūdensvada izveide);4)Mācību aprīkojuma iegāde prioritāro izglītības programmu "Hidrobūvju būvtehniķis" un "Lopkopības tehniķis" īstenošanas nodrošināšanai; 5)Informācijas un komunikāciju tehnoloģiju iegāde (turpmāk – IKT) un ierīkošana. 6)Sporta aprīkojuma iegāde.7) Mēbeļu un aprīkojuma iegāde Dienesta viesnīcai „Kalnamuiža 44” un Hidrobūvju tehniķu mācību manēžai – tehnikas novietnei.Projekta īstenošanas ilgums – no 2017.gada 1.janvāra līdz 2020.gada 30.septembrim (pilni 42 mēneši). Ar projekta iesnieguma sagatavošanu saistītās darbības uzsāktas 2017.gada 1. janvārī. 23.01.2017.izsludināts iepirkums par būvprojektu izstrādes un autoruzraudzības pakalpojumiem Profesionālās izglītības kompetences centra „Smiltenes tehnikums” objektiem, ID Nr.VIAA 2017/04 ERAF ST.Projekta kopējās izmaksas – EUR 2 122 152,81 tai skaitā, Eiropas Reģionālās attīstības fonda finansējums – EUR 1 803 829,90 un valsts budžeta līdzfinansējums – EUR 318 322,91.Projekta kopsavilkuma apraksta turpinājums pievienots projekta iesniegumam, skatīt projekta iesnieguma 15.pielikumu. (Latvian)
    0 references
    The aim of the project is the modernisation of the vocational education competence centre Smiltene Technical School (hereinafter – Technical), ensuring the compatibility of the learning environment with the development of economic sectors and improving the availability of vocational education. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Purchase of sports equipment.7) Purchase of furniture and equipment for the Service Hotel “Kalnamuiža 44” and for the training manager of hydro-structure technicians – technical shelter.The duration of the project implementation – from 1 January 2017 to 30 September 2020 (full 42 months). Activities related to preparation of the project application started on January 1, 2017. (English)
    15 July 2021
    0.2994916408331621
    0 references
    L’objectif de ce projet est de moderniser le centre de compétences de l’enseignement professionnel Smiltene Technical School (ci-après «Technologie»), en veillant à la pertinence de l’environnement d’apprentissage pour le développement des secteurs économiques et en améliorant l’accès à l’enseignement professionnel. Les activités prévues dans le cadre du projet visent directement à atteindre cet objectif en modernisant la base technique matérielle nécessaire au processus éducatif dans les programmes d’éducation prioritaires soutenus et en améliorant l’infrastructure de l’établissement d’enseignement. Le projet est mis en œuvre conformément à la stratégie de développement et d’investissement technologique 2015-2020.Afin d’assurer la réalisation de l’objectif spécifique énoncé dans le règlement du Conseil des ministres du 19 avril 2016 no 49 "Dispositions relatives à la mise en œuvre de l’objectif spécifique du programme opérationnel "Croissance et emploi"8.1.3 "Accroître le nombre d’établissements d’enseignement professionnel modernisés" (ci-après le "règlement du Conseil des ministres"), Tehnikums, en collaboration avec le partenaire de coopération — l’Agence nationale de développement de l’éducation — prévoit d’effectuer les activités suivantes: 1) Construction d’une nouvelle construction d’un manège de formation des techniciens en hydroconstruction — remise à l’équipement; 2) reconstruction de l’hôtel de service "Kalnamuiža 44"; 3) reconstruction de l’unité structurelle territoriale Alsviki (ci-après "unité structurelle d’Alswik") dans la transition connectée de deux ascenseurs à escalier diagonal et rénovation des communications techniques dans l’hôtel de service (mise en place d’un système d’alimentation en eau chaude, restauration du système d’égout, rénovation du système d’alimentation en eau froide, remplacement de l’équipement de plomberie, installation d’eau d’incendie); 4)Achat de matériel de formation pour assurer la mise en œuvre des programmes éducatifs prioritaires "technicien de construction hydroélectrique" et "technicien d’élevage»; 5)Approvisionnement et installation de technologies de l’information et de la communication (ci-après «TIC»). 6)Achat d’équipements sportifs.7) Achat de mobilier et d’équipement pour l’hôtel Service «Kalnamuiža 44» et pour la formation de techniciens en hydro-construction — un site technique.La durée du projet — du 1er janvier 2017 au 30 septembre 2020 (42 mois complets). Les activités liées à la préparation de la demande de projet ont débuté le 1er janvier 2017. 23.01.2017. la passation de marchés pour le développement de la conception de la construction et les services de supervision de l’auteur pour les objets du Centre de compétences en enseignement professionnel «Smiltenes technicalism» a été annoncée, ID no VIAA 2017/04 FEDER ST.Le coût total du projet — 222 222,81 EUR, y compris le financement du Fonds européen de développement régional — 180 829,90 EUR et le cofinancement du budget de l’État — 318 222,91 EUR. La poursuite de la description sommaire du projet est jointe à la demande de projet, voir l’annexe 15 de la demande de projet. (French)
    25 November 2021
    0 references
    Ziel des Projekts ist die Modernisierung des Kompetenzzentrums für Berufsbildung Smiltene Technical School (nachstehend „Technologie“), die Sicherstellung der Relevanz des Lernumfelds für die Entwicklung der Wirtschaftssektoren und die Verbesserung des Zugangs zur beruflichen Bildung. Die im Rahmen des Projekts geplanten Maßnahmen zielen unmittelbar darauf ab, dieses Ziel zu erreichen, indem die materielle technische Grundlage, die für den Bildungsprozess in den geförderten vorrangigen Bildungsprogrammen erforderlich ist, modernisiert und die Infrastruktur der Bildungseinrichtung verbessert wird. Das Projekt wird im Einklang mit der Technologieentwicklungs- und Investitionsstrategie 2015-2020 durchgeführt.Um das in der Kabinettsverordnung vom 19. April 2016 Nr. 49 „Vorkehrungen zur Umsetzung des spezifischen Ziels des operationellen Programms“8.1.3„Erhöhung der Zahl modernisierter Berufsbildungseinrichtungen“ (im Folgenden – die Verordnungen des Ministerrats) festgelegte Einzelziel zu gewährleisten, Tehnikums gemeinsam mit dem Kooperationspartner – der Staatlichen Bildungsagentur – plant, folgende Tätigkeiten durchzuführen:1) Bau eines Neubaus der Ausbildung von Wasserbautechnikern – Ausrüstungsschuppen;2) Umbau des Servicehotels „Kalnamuiža 44“;3) Wiederaufbau der Alsviki territorialen Struktureinheit (im Folgenden – Baueinheit Alswik) im Anschluss an den Übergang von zwei diagonalen Treppenaufzügen und die Renovierung der technischen Kommunikation im Servicehotel (Einrichtung des Warmwasserversorgungssystems, Sanierung des Kanalisationssystems, Renovierung des Kaltwasserversorgungssystems, Ersatz von Sanitäranlagen, Errichtung von Feuerwasserleitungen); 4)Beschaffung von Ausbildungsgeräten zur Sicherstellung der Durchführung von vorrangigen Bildungsprogrammen „Wasserbautechniker“ und „Tiertechniker“; 5)Beschaffung und Installation von Informations- und Kommunikationstechnologien (nachstehend „IKT“ genannt). 6)Kauf von Sportgeräten.7) Kauf von Möbeln und Ausrüstung für das Servicehotel „Kalnamuiža 44“ und für die Ausbildung von Wasserbautechnikern – ein technischer Standort.Die Laufzeit des Projekts – vom 1. Januar 2017 bis zum 30. September 2020 (vollständig 42 Monate). Die Tätigkeiten im Zusammenhang mit der Vorbereitung des Projektantrags begannen am 1. Januar 2017. 23.01.2017. Beschaffung für Baudesignentwicklung und Betreuungsleistungen für die Objekte des Kompetenzzentrums „Smiltenes technicalism“ des Berufsbildungszentrums „Smiltenes technicalism“ wurde bekannt gegeben, ID Nr. VIAA 2017/04 EFRE ST.Die Gesamtkosten des Projekts – 1 221 515,81 EUR, einschließlich Finanzierung aus dem Europäischen Fonds für regionale Entwicklung – 1 803 829,90 EUR und Kofinanzierung aus dem Staatshaushalt – 318 322,91 EUR. Weiterführende Projektbeschreibung ist dem Projektantrag beigefügt, siehe Anlage 15 zum Projektantrag. (German)
    28 November 2021
    0 references
    Doel van het project is de modernisering van het competentiecentrum voor beroepsonderwijs Smiltene Technical School (hierna „Technologie” genoemd), waarbij de relevantie van de leeromgeving voor de ontwikkeling van economische sectoren wordt gewaarborgd en de toegang tot beroepsonderwijs wordt verbeterd. De in het kader van het project geplande activiteiten zijn rechtstreeks gericht op het bereiken van dit doel door het moderniseren van de materiële technische basis die nodig is voor het onderwijsproces in de ondersteunde prioritaire onderwijsprogramma’s en de verbetering van de infrastructuur van de onderwijsinstelling. Het project wordt uitgevoerd in overeenstemming met de ontwikkelings- en investeringsstrategie van technologie 2015-2020.Om de verwezenlijking van de specifieke doelstelling van de kabinetsverordening van 19 april 2016 nr. 49 „Voorzieningen voor de uitvoering van de specifieke doelstelling van het operationele programma”Groei en werkgelegenheid„8.1.3”Verhoging van het aantal gemoderniseerde instellingen voor beroepsonderwijs„” (hierna — de verordeningen van het kabinet van ministers), Tehnikums samen met de samenwerkingspartner — het Staatsagentschap voor de ontwikkeling van het onderwijs — van plan de volgende activiteiten uit te voeren:1) Bouw van een nieuwe bouw van de opleidingsmanege van hydrobouwtechnici — loods;2) Wederopbouw van het servicehotel „Kalnamuiža 44”;3)Herbouw van de territoriale structuureenheid Alsviki (hierna: „structurele eenheid Alswik”) bij de verbonden overgang van twee diagonale trapliften en de renovatie van technische communicatie in het servicehotel (oprichting van warmwatervoorzieningssysteem, herstel van het rioolsysteem, renovatie van het koudwaterleidingsysteem, vervanging van loodgieterswerktuigen, installatie van brandwaterleiding); 4)Aanbesteding van opleidingsmateriaal om de uitvoering van prioritaire onderwijsprogramma’s „technicus van de waterbouwbouw” en „dierbouwtechnicus” te waarborgen; 5)Aanbesteding en installatie van informatie- en communicatietechnologieën (hierna „ICT” genoemd). 6)Aankoop van sportuitrusting.7) Aankoop van meubilair en uitrusting voor het Servicehotel „Kalnamuiža 44” en voor de opleiding van hydro-bouwtechnici — een technische site.De duur van het project — van 1 januari 2017 tot 30 september 2020 (volledige 42 maanden). De activiteiten in verband met de voorbereiding van de projectaanvraag zijn op 1 januari 2017 van start gegaan. 23.01.2017. Aanbesteding voor de ontwikkeling van het bouwontwerp en de diensten van auteurstoezicht voor de objecten van het kenniscentrum voor beroepsonderwijs „Smiltenes technicalism” is aangekondigd, ID nr. VIAA 2017/04 EFRO ST.De totale kosten van het project — 222 252,81 EUR, inclusief financiering uit het Europees Fonds voor Regionale Ontwikkeling — 1 803 829,90 EUR en medefinanciering uit de overheidsbegroting — 318 322,91 EUR. Voortzetting van de beschrijving van het project is bij de projectaanvraag gevoegd, zie bijlage 15 bij de projectaanvraag. (Dutch)
    28 November 2021
    0 references
    L'obiettivo del progetto è quello di modernizzare il centro di competenza in materia di istruzione professionale Smiltene Technical School (di seguito "Tecnologia"), garantendo la pertinenza dell'ambiente di apprendimento per lo sviluppo dei settori economici e migliorando l'accesso all'istruzione professionale. Le attività previste nell'ambito del progetto sono direttamente finalizzate al raggiungimento di tale obiettivo, modernizzando la base tecnica materiale necessaria per il processo educativo nei programmi di istruzione prioritari sostenuti e migliorando l'infrastruttura dell'istituto di istruzione. Il progetto è attuato in conformità con la strategia di sviluppo e di investimento della tecnologia 2015-2020.Al fine di garantire il conseguimento dell'obiettivo specifico stabilito nel regolamento del Gabinetto del 19 aprile 2016 n.49 "Disposizioni per l'attuazione dell'obiettivo specifico del programma operativo"Crescita e occupazione"8.1.3"Aumentare il numero di istituti di istruzione professionale modernizzati"" (di seguito — il regolamento del Consiglio dei ministri), Tehnikums, insieme al partner di cooperazione — l'Agenzia statale per lo sviluppo dell'istruzione — prevede di svolgere le seguenti attività:1) Costruzione di una nuova costruzione di mandrini per la formazione dei tecnici idroelettrici — capannone attrezzature; 2) Ricostruzione dell'hotel di servizio "Kalnamuiža 44"; 3) Ricostruzione dell'unità strutturale territoriale Alsviki (di seguito — unità strutturale Alswik) nella transizione connessa di due ascensori diagonali delle scale e nella ristrutturazione delle comunicazioni di ingegneria nell'hotel di servizio (stabilimento del sistema di approvvigionamento dell'acqua calda, ripristino del sistema fognario, ristrutturazione del sistema di approvvigionamento dell'acqua fredda, sostituzione delle attrezzature idrauliche, installazione del tubo dell'acqua calda); 4)Approvvigionamento di attrezzature di formazione per garantire l'attuazione di programmi educativi prioritari "tecnici delle costruzioni idrostrutturali" e "tecnici di bestiame"; 5)Appalti e installazione di tecnologie dell'informazione e della comunicazione (di seguito "TIC"). 6)Acquisto di attrezzature sportive.7) Acquisto di mobili e attrezzature per l'hotel di servizio "Kalnamuiža 44" e per la formazione di tecnici idro-edilizia — un sito tecnico.La durata del progetto — dal 1º gennaio 2017 al 30 settembre 2020 (completo 42 mesi). Le attività connesse alla preparazione della domanda di progetto sono iniziate il 1º gennaio 2017. 23.01.2017. è stato annunciato l'appalto per lo sviluppo della progettazione edile e i servizi di supervisione dell'autore per gli oggetti del Centro di competenza in materia di istruzione professionale "Smiltenes technicalism", ID n. VIAA 2017/04 FESR ST.Il costo totale del progetto — EUR 2 122 152,81, compreso il finanziamento del Fondo europeo di sviluppo regionale — EUR 1.803.829,90 e il cofinanziamento del bilancio dello Stato — 318 322,91 EUR. Continuare la descrizione sintetica del progetto è allegata alla domanda di progetto, cfr. allegato 15 alla domanda di progetto. (Italian)
    11 January 2022
    0 references
    El objetivo del proyecto es modernizar el centro de competencias de formación profesional Smiltene Technical School (en lo sucesivo, «Tecnología»), garantizar la pertinencia del entorno de aprendizaje para el desarrollo de los sectores económicos y mejorar el acceso a la educación profesional. Las actividades previstas en el marco del proyecto están dirigidas directamente a lograr este objetivo mediante la modernización de la base técnica material necesaria para el proceso educativo en los programas educativos prioritarios apoyados y la mejora de la infraestructura de la institución educativa. El proyecto se ejecuta de conformidad con la Estrategia de Desarrollo e Inversión Tecnológica 2015-2020.A fin de garantizar la consecución del objetivo específico establecido en el Reglamento del Consejo de Ministros de 19 de abril de 2016 n.º 49 «Disposiciones para la aplicación del objetivo específico del Programa Operativo»Crecimiento y Empleo«8.1.3»Incrementar el número de instituciones de educación profesional modernizadas«(en adelante, el Reglamento del Consejo de Ministros), Tehnikums, junto con el socio de cooperación — la Agencia Estatal de Desarrollo de la Educación — tiene previsto llevar a cabo las siguientes actividades: 1) Construcción de una nueva construcción de la mansión de los técnicos de construcción hidroeléctrica — cobertizo de equipos; 2) Reconstrucción del hotel de servicio»Kalnamuiža 44«; 3) Reconstrucción de la unidad estructural territorial de Alsviki (en lo sucesivo,»unidad estructural Alswik«) en la transición conectada de dos ascensores diagonales y la renovación de las comunicaciones de ingeniería en el hotel de servicio (establecimiento del sistema de suministro de agua caliente, restauración del sistema de alcantarillado, renovación del sistema de suministro de agua fría, sustitución de equipos de fontanería, establecimiento de tuberías de agua contra incendios); 4) Adquisición de equipos de capacitación para asegurar la implementación de programas educativos prioritarios»técnicos de construcción de hidroestructuras«y»técnicos de ganado»; 5)Contratación e instalación de tecnologías de la información y la comunicación (en lo sucesivo, «TIC»). 6) Compra de equipos deportivos.7) Compra de mobiliario y equipo para el hotel de servicio «Kalnamuiža 44» y para la formación de técnicos de construcción hidroeléctrica — un emplazamiento técnico.La duración del proyecto — desde el 1 de enero de 2017 hasta el 30 de septiembre de 2020 (42 meses completos). Las actividades relacionadas con la preparación de la solicitud de proyecto comenzaron el 1 de enero de 2017. 23.01.2017. Se ha anunciado la contratación para el desarrollo del diseño de la construcción y los servicios de supervisión de los autores de los objetos del Centro de Competencia de Educación Profesional «Smiltenes technicalism», ID n.º VIAA 2017/04 FEDER ST.El coste total del proyecto — 2 222 152,81 EUR, incluida la financiación del Fondo Europeo de Desarrollo Regional — 183 829,90 EUR y cofinanciación con cargo al presupuesto del Estado — 3 183 322,91 EUR. Continuación de la descripción resumida del proyecto se adjunta a la solicitud del proyecto, véase el anexo 15 de la solicitud de proyecto. (Spanish)
    12 January 2022
    0 references
    Projekti eesmärgiks on kutsehariduse kompetentsikeskuse Smiltene Tehnikakooli (edaspidi „Tehniline“) moderniseerimine, tagades õpikeskkonna ühilduvuse majandussektorite arenguga ning parandades kutsehariduse kättesaadavust. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Spordivarustuse ostmine.7) Mööbli ja varustuse ostmine teenindushotellile „Kalnamuiža 44“ ja hüdrostruktuuri tehnikute koolitusjuhile – tehniline varjupaik.Projekti rakendamise kestus – 1. jaanuarist 2017 kuni 30. septembrini 2020 (kogu 42 kuud). Projektitaotluse ettevalmistamisega seotud tegevused algasid 1. jaanuaril 2017. (Estonian)
    3 August 2022
    0 references
    Projekto tikslas – modernizuoti profesinio mokymo kompetencijos centrą „Smiltene Technical School“ (toliau – Technikos), užtikrinti mokymosi aplinkos suderinamumą su ekonomikos sektorių vystymusi ir gerinti profesinio mokymo prieinamumą. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6) Sporto įrangos pirkimas.7) Baldų ir įrangos pirkimas Viešbučiui „Kalnamuiža 44“ ir hidrostruktūros technikų – techninės pastogės mokymo vadovui.Projekto įgyvendinimo trukmė – nuo 2017 m. sausio 1 d. iki 2020 m. rugsėjo 30 d. (visi 42 mėnesiai). Su projekto paraiškos rengimu susijusi veikla pradėta 2017 m. sausio 1 d. (Lithuanian)
    3 August 2022
    0 references
    Cilj projekta je modernizacija Centra kompetencija za strukovno obrazovanje Smiltene Tehničke škole (u daljnjem tekstu – Tehnička), čime se osigurava kompatibilnost okruženja za učenje s razvojem gospodarskih sektora i poboljšava dostupnost strukovnog obrazovanja. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6) Kupnja sportske opreme.7) Kupnja namještaja i opreme za Service Hotel „Kalnamuiža 44” i za edukaciju voditelja hidrostrukturnih tehničara – tehničko sklonište.Trajanje provedbe projekta – od 1. siječnja 2017. do 30. rujna 2020. godine (puna 42 mjeseca). Aktivnosti vezane uz pripremu projektne prijave započele su 1. siječnja 2017. godine. (Croatian)
    3 August 2022
    0 references
    Στόχος του σχεδίου είναι ο εκσυγχρονισμός του κέντρου ικανοτήτων επαγγελματικής εκπαίδευσης Smiltene Technical School (στο εξής — Τεχνική Σχολή), εξασφαλίζοντας τη συμβατότητα του μαθησιακού περιβάλλοντος με την ανάπτυξη των οικονομικών τομέων και βελτιώνοντας τη διαθεσιμότητα της επαγγελματικής εκπαίδευσης. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Αγορά αθλητικού εξοπλισμού.7) Αγορά επίπλων και εξοπλισμού για το Service Hotel «Kalnamuiža 44» και για τον διευθυντή κατάρτισης τεχνικών υδροδομής — τεχνικό καταφύγιο.Η διάρκεια της υλοποίησης του έργου — από την 1η Ιανουαρίου 2017 έως τις 30 Σεπτεμβρίου 2020 (πλήρης 42 μήνες). Οι δραστηριότητες που σχετίζονται με την προετοιμασία της αίτησης έργου ξεκίνησαν την 1η Ιανουαρίου 2017. (Greek)
    3 August 2022
    0 references
    Cieľom projektu je modernizácia kompetenčného centra odborného vzdelávania Smiltene Technical School (ďalej len – Technická), zabezpečenie kompatibility vzdelávacieho prostredia s rozvojom hospodárskych odvetví a zlepšenie dostupnosti odborného vzdelávania. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Nákup športového vybavenia.7) Nákup nábytku a vybavenia pre servisný hotel „Kalnamuiža 44“ a pre školiaceho manažéra hydrotechnických technikov – technický prístrešok.Dĺžka realizácie projektu – od 1. januára 2017 do 30. septembra 2020 (celé 42 mesiacov). Činnosti súvisiace s prípravou žiadosti o projekt sa začali 1. januára 2017. (Slovak)
    3 August 2022
    0 references
    Hankkeen tavoitteena on nykyaikaistaa ammatillisen koulutuksen osaamiskeskus Smiltene Technical School, jäljempänä ’tekninen oppilaitos’, varmistaa oppimisympäristön yhteensopivuus talouden alojen kehityksen kanssa ja parantaa ammatillisen koulutuksen saatavuutta. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Liikuntavälineiden hankinta.7) Huonekalujen ja laitteiden hankinta palveluhotelli ”Kalnamuiža 44” ja vesirakennusteknikoiden koulutuspäällikölle – tekninen suoja. Hankkeen toteutuksen kesto – 1.1.2017–30.9.2020 (koko 42 kuukautta). Hankehakemuksen valmisteluun liittyvät toimet aloitettiin 1. tammikuuta 2017. (Finnish)
    3 August 2022
    0 references
    Celem projektu jest modernizacja Centrum Kształcenia Zawodowego Smiltene Technical School (zwanego dalej „Technicznym”), zapewniającego kompatybilność środowiska edukacyjnego z rozwojem sektorów gospodarki oraz poprawę dostępności kształcenia zawodowego. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Zakup sprzętu sportowego.7) Zakup mebli i sprzętu do Hotelu Serwisowego „Kalnamuiža 44” oraz dla kierownika szkolenia techników hydrostrukturalnych – schronienie techniczne. Czas realizacji projektu – od 1 stycznia 2017 r. do 30 września 2020 r. (pełne 42 miesiące). Działania związane z przygotowaniem wniosku o projekt rozpoczęły się w dniu 1 stycznia 2017 r. (Polish)
    3 August 2022
    0 references
    A projekt célja a Smiltene Műszaki Iskola szakoktatási kompetenciaközpontjának korszerűsítése, a tanulási környezetnek a gazdasági ágazatok fejlődésével való összeegyeztethetőségének biztosítása, valamint a szakképzés elérhetőségének javítása. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6) Sportfelszerelés vásárlása.7) Bútorok és felszerelések vásárlása a Service Hotel „Kalnamuiža 44” és a hidrostruktúra-technikusok képzésvezetője számára – műszaki menedék.A projekt végrehajtásának időtartama – 2017. január 1-jétől 2020. szeptember 30-ig (teljes 42 hónap). A projektpályázat előkészítésével kapcsolatos tevékenységek 2017. január 1-jén kezdődtek meg. (Hungarian)
    3 August 2022
    0 references
    Cílem projektu je modernizace kompetenčního centra odborného vzdělávání Technická škola Smiltene (dále jen Technická), zajištění slučitelnosti vzdělávacího prostředí s rozvojem hospodářských odvětví a zlepšení dostupnosti odborného vzdělávání. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6) Nákup sportovního vybavení.7) Nákup nábytku a vybavení pro servisní hotel „Kalnamuiža 44“ a pro školícího manažera techniků hydrostruktury – technický přístřešek.Doba trvání realizace projektu – od 1. ledna 2017 do 30. září 2020 (celé 42 měsíců). Činnosti související s přípravou projektové žádosti byly zahájeny 1. ledna 2017. (Czech)
    3 August 2022
    0 references
    Is é aidhm an tionscadail nuachóiriú a dhéanamh ar an lárionad inniúlachta gairmoideachais Smiltene Technical School (anseo feasta — Teicniúil), rud a áirithíonn comhoiriúnacht na timpeallachta foghlama le forbairt na n-earnálacha eacnamaíocha agus feabhas a chur ar infhaighteacht an ghairmoideachais. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6) Trealamh spóirt a cheannach.7) Troscán agus trealamh a cheannach le haghaidh Óstán na Seirbhíse “Kalnamuiža 44” agus do bhainisteoir oiliúna teicneoirí hidreastruchtúir — foscadh teicniúil. Fad chur chun feidhme an tionscadail — ón 1 Eanáir 2017 go dtí an 30 Meán Fómhair 2020 (iomlán 42 mhí). Cuireadh tús leis na gníomhaíochtaí a bhaineann le hullmhú an iarratais tionscadail an 1 Eanáir 2017. (Irish)
    3 August 2022
    0 references
    Cilj projekta je posodobitev strokovnega centra za poklicno izobraževanje Smiltene Technical School (v nadaljevanju – Tehnična), ki zagotavlja združljivost učnega okolja z razvojem gospodarskih sektorjev in izboljšuje razpoložljivost poklicnega izobraževanja. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Nakup športne opreme.7) Nakup pohištva in opreme za servisni hotel „Kalnamuiža 44“ in za vodjo usposabljanja hidrostrukturnih tehnikov – tehnično zatočišče. Trajanje izvedbe projekta – od 1. januarja 2017 do 30. septembra 2020 (polnih 42 mesecev). Aktivnosti, povezane s pripravo projektne vloge, so se začele 1. januarja 2017. (Slovenian)
    3 August 2022
    0 references
    Целта на проекта е модернизиране на Експертния център за професионално образование Смилтене Техническо училище (наричано по-долу „Техническо училище“), осигуряване на съвместимост на учебната среда с развитието на икономическите сектори и подобряване на наличността на професионално образование. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Закупуване на спортно оборудване.7) Закупуване на мебели и оборудване за сервизен хотел „Калнамуйза 44“ и за обучителен мениджър на хидроструктурни техници — технически подслон.Продължителността на изпълнението на проекта — от 1 януари 2017 г. до 30 септември 2020 г. (пълен 42 месеца). Дейностите, свързани с подготовката на проектното заявление, започнаха на 1 януари 2017 г. (Bulgarian)
    3 August 2022
    0 references
    L-għan tal-proġett huwa l-modernizzazzjoni taċ-ċentru tal-kompetenza fl-edukazzjoni vokazzjonali Smiltene Technical School (minn hawn’il quddiem — Teknika), li tiżgura l-kompatibbiltà tal-ambjent tat-tagħlim mal-iżvilupp tas-setturi ekonomiċi u t-titjib tad-disponibbiltà tal-edukazzjoni vokazzjonali. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Xiri ta’ tagħmir sportiv.7) Xiri ta’ għamara u tagħmir għas-Servizz Hotel “Kalnamuiža 44” u għall-maniġer tat-taħriġ ta’ tekniċi tal-idrostruttura — kenn tekniku.It-tul tal-implimentazzjoni tal-proġett — mill-1 ta’ Jannar 2017 sat-30 ta’ Settembru 2020 (42 xahar sħiħ). L-attivitajiet relatati mat-tħejjija tal-applikazzjoni tal-proġett bdew fl-1 ta’ Jannar 2017. (Maltese)
    3 August 2022
    0 references
    O objetivo do projeto é a modernização do centro de competências do ensino profissional da Escola Técnica Smiltene (a seguir designada por «Escola Técnica»), garantindo a compatibilidade do ambiente de aprendizagem com o desenvolvimento dos setores económicos e melhorando a disponibilidade do ensino profissional. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Aquisição de equipamento desportivo.7) Aquisição de mobiliário e equipamento para o hotel de serviço «Kalnamuiža 44» e para o gestor de formação de técnicos de hidroestrutura – abrigo técnico.Duração da execução do projeto – de 1 de janeiro de 2017 a 30 de setembro de 2020 (42 meses completos). As atividades relacionadas com a preparação da candidatura do projeto tiveram início em 1 de janeiro de 2017. (Portuguese)
    3 August 2022
    0 references
    Formålet med projektet er at modernisere kompetencecentret for erhvervsuddannelse i Smiltene Teknisk Skole (i det følgende benævnt "Teknisk"), at sikre, at læringsmiljøet er foreneligt med udviklingen af økonomiske sektorer, og at forbedre adgangen til erhvervsuddannelse. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Køb af sportsudstyr.7) Køb af møbler og udstyr til servicehotellet "Kalnamuiža 44" og til uddannelseschefen for vandbygningsteknikere — teknisk husly.Varigheden af ​​projektets gennemførelse — fra 1. januar 2017 til 30. september 2020 (hele 42 måneder). Aktiviteterne i forbindelse med udarbejdelsen af projektansøgningen blev påbegyndt den 1. januar 2017. (Danish)
    3 August 2022
    0 references
    Scopul proiectului este modernizarea Centrului de competențe în învățământul profesional Smiltene Technical School (denumit în continuare – Tehnic), asigurând compatibilitatea mediului de învățare cu dezvoltarea sectoarelor economice și îmbunătățind disponibilitatea învățământului profesional. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6) Achiziționarea de echipamente sportive.7) Achiziționarea de mobilier și echipamente pentru Hotelul Service „Kalnamuiža 44” și pentru managerul de formare a tehnicienilor de hidrostructură – adăpost tehnic. Durata implementării proiectului – de la 1 ianuarie 2017 până la 30 septembrie 2020 (între 42 de luni). Activitățile legate de pregătirea cererii de proiect au început la 1 ianuarie 2017. (Romanian)
    3 August 2022
    0 references
    Syftet med projektet är att modernisera kompetenscentrumet för yrkesutbildning Smiltene Technical School (nedan kallat ”tekniskt”) för att säkerställa att inlärningsmiljön är förenlig med utvecklingen av ekonomiska sektorer och att förbättra tillgången till yrkesutbildning. The project is implemented in accordance with the Technical Development and Investment Strategy 2015-2020.To ensure the Cabinet Regulations of 19 April 2016 No.249 “Establishment of the Work Programme”Growth and Employment“of the Buildings of the Priority Building” 8.1.3.The specific support goal “Increasing the number of advanced vocational educational institutions” (henceforward – Activity MK Co-operation) Building of the Boat of the Buildings-Constituting of the Boat of the Boat and Employment of the BuildingsUnder the construction of the infrastructure of the educational institution.Development of the specific support goal “Include the number of advanced vocational educational institutions” (hereafter – activity MK rules) Installation of the Boat of the Building (Construction of the Building of the Boat and Employment of the Buildings)Construction of the Buildings of the Priority Building (Construction of the Priorder Building and the Building of the Priorder of the Building of the “Housework for the Development and Investment of the Project” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creation of the Operational Program”Growth and Employment of the Building of the Building and Employment“of the Communication of the Buildings of the Priority Building”Elevation of the Technical and Investment of the Buildings“(henceforward of the Cabinet of Ministers Regulations No.249”Creation of the Work Programme “Operformation of the Buildings and Employment of the Buildings of the Construction and Employment of the Buildings of the Priority Building and Employment of the Buildings of the Construction of the Construction of the Construction of the Technical and Investment of the Project” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating of the Work Programme”Operation of the Buildings of the Buildings “Customer of the Buildings”Custom“of the Buildings of the Buildings”Custom“of 19 April 2016”Installation of the Buildings of the Cabinet of Ministers No.249 “Creating the Operation Program”Growth and Employment“of the Buildings of the Bearing and Improving of the Infrastructure of the Educational Institution” in accordance with the Implementation Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Creating the Work Programme”Growth and Employment“of the Buildings of the Priority Building and Improving the Project” in accordance with the Implementation of the Technical Development and Investment Strategy for the period 2015-2020.To ensure the installation of the Cabinet of Ministers of 19 April 2016 “Creating of the Workplace of the Work Programme”Operformation of the Workout of the Buildings “Growth and Employment” of the Buildings of the Priority and the Infrastructure of the Technical and the Implementation of the Project “Inclining the number of Advanced Professional Education and Investments” in the Regulations of the Cabinet of Ministers of 19 April 2016 No.249 “Establishment of the Workplace of the Workplace”Operformation of the Workout of the Building of the Bearing“and Improving of the Infrastructure of the Educational Institution”.Development of the project is implemented in accordance with the Implementation Rules of the Technical and the Building of the Technical of 19 April 2016 No.249 “Creating of the Operational Program”Operformation of the Workout of the Building of the Building and Employment of the Building of the Boat and Employment“of the Propulace of the Construction of the Technical and the Specific Support”Inclining the number of Advanced Professional Educational Institutions“(hereafter – Activity of the Cabinet of Ministers of Regulations No.249”C 5) Purchase and installation of information and communication technologies (ICT). 6)Inköp av sportutrustning.7) Inköp av möbler och utrustning för Service Hotel ”Kalnamuiža 44” och för utbildningsledare för vattenbyggnadstekniker – tekniskt skydd.Vidden av projektets genomförande – från 1 januari 2017 till 30 september 2020 (hela 42 månader). Verksamheten i samband med utarbetandet av projektansökan inleddes den 1 januari 2017. (Swedish)
    3 August 2022
    0 references
    Kalnamuiža, Smiltenes pag., Smiltenes nov.
    0 references
    Kalnamuiža 44, Kalnamuiža, Smiltenes pag., Smiltenes nov., LV-4729
    0 references
    Pils iela 8, Smiltene, Smiltenes nov., LV-4729
    0 references
    Kalnamuiža 6, Kalnamuiža, Smiltenes pag., Smiltenes nov., LV-4729
    0 references
    Kalnamuiža 8, Kalnamuiža, Smiltenes pag., Smiltenes nov., LV-4729
    0 references
    Kalnamuiža 10, Kalnamuiža, Smiltenes pag., Smiltenes nov., LV-4729
    0 references
    Alsviķi, Alsviķu pag., Alūksnes nov.
    0 references
    Alsviķi, Alsviķu pag., Alūksnes nov.
    0 references
    Kalnamuiža 15, Kalnamuiža, Smiltenes pag., Smiltenes nov., LV-4729
    0 references

    Identifiers

    8.1.3.0/17/I/001
    0 references