Development of water management in Riga, Stage 5 (Q3057417)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q3057417 in Latvia
Language Label Description Also known as
English
Development of water management in Riga, Stage 5
Project Q3057417 in Latvia

    Statements

    0 references
    0 references
    9,932,725.0 Euro
    0 references
    15,571,007.34 Euro
    0 references
    63.79 percent
    0 references
    1 August 2018
    0 references
    31 December 2023
    0 references
    SIA "Rīgas ūdens"
    0 references
    0 references
    0 references

    56°56'57.84"N, 24°6'18.65"E
    0 references
    Projekta “Ūdenssaimniecības attīstība Rīgā, 5.kārta” (turpmāk visā veidlapā – Projekts) mērķis ir ūdensapgādes un kanalizācijas sistēmas izbūve Rīgas pilsētas paplašinātajā notekūdeņu aglomerācijas teritorijā, tādējādi attīstot sabiedrisko ūdenssaimniecības pakalpojumu izmantošanu, uzlabojot to pieejamību un kvalitāti, nodrošinot kvalitatīvu dzīves vidi, samazinot vides piesārņojumu un ūdenstilpju eitrofikāciju un veicinot Eiropas Savienības direktīvas 91/271/EEK (turpmāk – Direktīva 91/271/EEK) par komunālo notekūdeņu attīrīšanu prasību izpildi ūdenssaimniecības jomā.Projekta ietvaros plānotās darbības paredz jaunu kanalizācijas tīklu izbūvi 34,59 km garumā un tīklu rekonstrukciju 0,44 km garumā Berģos, Imantā un Beberbeķos, kā arī izbūvējot kopumā 18 jaunas kanalizācijas sūkņu stacijas. Papildu 2014.-2020.gada plānošanas perioda projekta attiecināmajām darbībām šajās teritorijās tiek plānota arī jaunu centralizēto ūdensapgādes ārējo inženiertīklu izbūve 24,73 km garumā un rekonstrukcija 0,41 km garumā (finansētas kā projekta neattiecināmās izmaksas). Projektu plānots realizēt 69 mēnešu laikā līdz 2023.gada 31.decembrim. Projekta kopējās izmaksas plānotas 26 006 448,27 EUR apmērā, tai skaitā Kohēzijas fonda līdzfinansējums 9 932 725,00 EUR apmērā. Projekta realizācija paredz 2959 iedzīvotāju pieslēgšanu centralizētai kanalizācijas sistēmai. (Latvian)
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. The project is planned to be implemented within 69 months until December 31, 2023. The total cost of the project is planned in the amount of EUR 26006448,27, including co-financing from the Cohesion Fund in the amount of EUR 9932725,00. The implementation of the project envisages the connection of 2959 inhabitants to a centralised sewerage system. (English)
    15 July 2021
    0.9025430982634768
    0 references
    L’objectif du projet «Développement de la gestion de l’eau à Riga, étape 5» (ci-après dénommé «le projet») est la construction d’un système d’approvisionnement en eau et d’assainissement dans l’agglomération élargie de la ville de Riga, développant ainsi l’utilisation des services publics de gestion de l’eau, améliorant leur accessibilité et leur qualité, assurant un environnement de vie de qualité, réduisant la pollution environnementale et l’eutrophisation des masses d’eau et favorisant le respect des exigences de la directive 91/271/CEE de l’Union européenne (ci-après la «directive 91/271/CEE») relative au traitement des eaux urbaines résiduaires dans le domaine de la gestion des eaux. un total de 59 km et la reconstruction de filets de 0,44 km à Ber’i, Imanta et Beberbecki, ainsi que la construction d’un total de 18 nouvelles stations de pompage des égouts. Outre les activités éligibles au projet de la période de programmation 2014-2020, la construction de nouveaux réseaux centraux d’approvisionnement en eau d’une longueur de 24,73 km et la reconstruction de 0,41 km (financés en tant que coûts inéligibles du projet) sont également prévues dans ces domaines. Le projet devrait être mis en œuvre dans un délai de 69 mois jusqu’au 31 décembre 2023. Les coûts totaux du projet sont prévus pour un montant de 26 006 448,27 EUR, y compris le cofinancement par le Fonds de cohésion d’un montant de 9 932 725,00 EUR. La mise en œuvre du projet prévoit le raccordement de 2959 habitants à un réseau d’assainissement centralisé. (French)
    25 November 2021
    0 references
    Ziel des Projekts „Entwicklung der Wasserbewirtschaftung in Riga, Stufe 5“ (im Folgenden in der gesamten Form – das Projekt) ist der Bau eines Wasserversorgungs- und Kanalisationssystems im erweiterten Ballungsraum der Stadt Riga, um die Nutzung öffentlicher Wasserbewirtschaftungsdienste zu verbessern, ihre Zugänglichkeit und Qualität zu verbessern, eine hochwertige Lebensumwelt zu gewährleisten, die Umweltverschmutzung und die Eutrophierung von Wasserkörpern zu verringern und die Erfüllung der Anforderungen der Richtlinie 91/271/EWG der Europäischen Union (im Folgenden: Richtlinie 91/271/EWG) über die Behandlung von kommunalem Abwasser im Bereich der Wasserbewirtschaftung zu fördern. insgesamt 59 km und Umbau von Netzen von 0,44 km in Ber-i, Imanta und Beberbecki, sowie den Bau von insgesamt 18 neuen Kanalpumpenstationen. Neben den projektzuschussfähigen Tätigkeiten des Programmplanungszeitraums 2014-2020 ist auch der Bau neuer externer Wasserversorgungsnetze für die zentrale Wasserversorgung von 24,73 km und der Wiederaufbau von 0,41 km (als nicht förderfähige Kosten des Projekts) in diesen Bereichen geplant. Das Projekt soll innerhalb von 69 Monaten bis zum 31. Dezember 2023 durchgeführt werden. Die Gesamtkosten des Projekts sind in Höhe von 266 448,27 EUR veranschlagt, einschließlich der Kofinanzierung aus dem Kohäsionsfonds in Höhe von 9 932 725,00 EUR. Die Umsetzung des Projekts sieht die Anbindung von 2959 Einwohnern an ein zentrales Kanalisationssystem vor. (German)
    28 November 2021
    0 references
    Het doel van het project „Ontwikkeling van het waterbeheer in Riga, fase 5” (hierna in de hele vorm — het project) is de bouw van een watervoorzienings- en rioleringssysteem in de uitgebreide agglomeratie Riga, waarmee het gebruik van openbare waterbeheersdiensten wordt ontwikkeld, de toegankelijkheid en kwaliteit ervan worden verbeterd, een kwaliteitsvolle leefomgeving wordt gewaarborgd, milieuvervuiling en eutrofiëring van waterlichamen worden verminderd en de naleving van de eisen van Richtlijn 91/271/EEG van de Europese Unie (hierna Richtlijn 91/271/EEG) inzake de behandeling van stedelijk afvalwater op het gebied van waterbeheer wordt bevorderd. De in het kader van het project geplande activiteiten zijn gericht op de aanleg van nieuwe rioleringsnetten 34, een totaal van 59 km en reconstructie van netten van 0,44 km in Beberbecki, Imanta en Beberbecki, evenals de bouw van in totaal 18 nieuwe rioolpompstations. Naast de voor het project in aanmerking komende activiteiten van de programmeringsperiode 2014-2020 is in deze gebieden ook de aanleg gepland van nieuwe externe watervoorzieningsnetwerken van 24,73 km en de wederopbouw van 0,41 km (gefinancierd als niet-subsidiabele kosten van het project). Het project zal naar verwachting binnen 69 maanden tot en met 31 december 2023 worden uitgevoerd. De totale kosten van het project zijn gepland voor een bedrag van 26 006 448,27 EUR, inclusief medefinanciering uit het Cohesiefonds voor een bedrag van 9 932 725,00 EUR. De uitvoering van het project voorziet in de aansluiting van 2959 inwoners op een gecentraliseerd rioleringssysteem. (Dutch)
    28 November 2021
    0 references
    L'obiettivo del progetto "Sviluppo della gestione idrica a Riga, fase 5" (di seguito "il progetto") è la costruzione di un sistema di approvvigionamento idrico e fognario nell'agglomerato esteso della città di Riga, sviluppando in tal modo l'uso dei servizi pubblici di gestione delle acque, migliorandone l'accessibilità e la qualità, garantendo un ambiente di vita di qualità, riducendo l'inquinamento ambientale e l'eutrofizzazione dei corpi idrici e promuovendo il rispetto dei requisiti della direttiva 91/271/CEE dell'Unione europea (di seguito — direttiva 91/271/CEE) concernente il trattamento delle acque reflue urbane nel settore della gestione delle acque. Le attività previste nel quadro del progetto prevedono la costruzione di nuove reti fognarie 34, un totale di 59 km e la ricostruzione di reti di 0,44 km a Ber¼i, Imanta e Beberbecki, così come la costruzione di un totale di 18 nuove stazioni di pompaggio fognario. Oltre alle attività ammissibili del progetto del periodo di programmazione 2014-2020, in queste aree è prevista anche la costruzione di nuove reti centrali di ingegneria esterna per l'approvvigionamento idrico di 24,73 km e la ricostruzione di 0,41 km (finanziata come costi non ammissibili del progetto). Il progetto dovrebbe essere attuato entro 69 mesi fino al 31 dicembre 2023. I costi totali del progetto sono previsti per un importo di 26 006 448,27 EUR, compreso il cofinanziamento del Fondo di coesione per un importo di 9 932 725,00 EUR. L'attuazione del progetto prevede il collegamento di 2959 abitanti a un sistema fognario centralizzato. (Italian)
    11 January 2022
    0 references
    El objetivo del proyecto «Desarrollo de la gestión del agua en Riga, fase 5» (en lo sucesivo, «todo el proyecto») es la construcción de un sistema de abastecimiento de agua y alcantarillado en la aglomeración ampliada de la ciudad de Riga, desarrollando así el uso de los servicios públicos de gestión del agua, mejorando su accesibilidad y calidad, garantizando un entorno de vida de calidad, reduciendo la contaminación ambiental y la eutrofización de las masas de agua y promoviendo el cumplimiento de los requisitos de la Directiva 91/271/CEE de la Unión Europea (en lo sucesivo, «Directiva 91/271/CEE») relativa al tratamiento de las aguas residuales urbanas en el ámbito de la gestión del agua. Las actividades previstas en el marco del proyecto prevén la construcción de nuevas redes de alcantarillado 34, un total de 59 km y reconstrucción de redes de 0,44 km en Beríi, Imanta y Beberbecki, así como la construcción de un total de 18 nuevas estaciones de bombeo de alcantarillado. Además de las actividades subvencionables del proyecto del período de programación 2014-2020, también está prevista la construcción de nuevas redes de ingeniería externa de suministro de agua central de 24,73 km y la reconstrucción de 0,41 km (financiadas como costes no subvencionables del proyecto). Está previsto que el proyecto se ejecute en un plazo de 69 meses hasta el 31 de diciembre de 2023. Los costes totales del proyecto están previstos por un importe de 26 006 448,27 EUR, incluida la cofinanciación del Fondo de Cohesión por un importe de 9 932 725,00 EUR. La ejecución del proyecto prevé la conexión de 2959 habitantes a un sistema centralizado de alcantarillado. (Spanish)
    12 January 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Projekt on kavas ellu viia 69 kuu jooksul kuni 31. detsembrini 2023. Projekti kogumaksumus on 26006448,27 eurot, sealhulgas Ühtekuuluvusfondist kaasrahastamine summas 9932725,00 eurot. Projekti elluviimisega nähakse ette 2959 elaniku ühendamine tsentraliseeritud kanalisatsioonisüsteemiga. (Estonian)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Projektą planuojama įgyvendinti per 69 mėnesius iki 2023 m. gruodžio 31 d. Bendra projekto išlaidų suma yra 26 006 448,27 EUR, įskaitant 9 932 725,00 EUR bendrą finansavimą iš Sanglaudos fondo. Projekto įgyvendinimas numato 2959 gyventojų prijungimą prie centralizuotos kanalizacijos sistemos. (Lithuanian)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Planira se provedba projekta u roku od 69 mjeseci do 31. prosinca 2023. Ukupni trošak projekta planiran je u iznosu od 26 006 448,27 EUR, uključujući sufinanciranje iz Kohezijskog fonda u iznosu od 9 932 725,00 EUR. Provedbom projekta predviđa se povezivanje 2959 stanovnika na centralizirani kanalizacijski sustav. (Croatian)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Το έργο προβλέπεται να υλοποιηθεί εντός 69 μηνών έως τις 31 Δεκεμβρίου 2023. Το συνολικό κόστος του έργου προβλέπεται να ανέλθει σε 26 006 448,27 EUR, συμπεριλαμβανομένης της συγχρηματοδότησης από το Ταμείο Συνοχής ύψους 9 932 725,00 EUR. Η υλοποίηση του σχεδίου προβλέπει τη σύνδεση 2959 κατοίκων με ένα κεντρικό αποχετευτικό σύστημα. (Greek)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Realizácia projektu sa plánuje do 69 mesiacov do 31. decembra 2023. Celkové náklady na projekt sa plánujú vo výške 26 006 448,27 EUR vrátane spolufinancovania z Kohézneho fondu vo výške 9 932 725,00 EUR. Realizácia projektu predpokladá pripojenie 2959 obyvateľov do centralizovaného kanalizačného systému. (Slovak)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Hanke on tarkoitus toteuttaa 69 kuukauden kuluessa 31. joulukuuta 2023 saakka. Hankkeen kokonaiskustannukset ovat 26006448,27 euroa, johon sisältyy koheesiorahaston rahoitusosuus 9932725,00 euroa. Hankkeen toteutuksessa suunnitellaan 2959 asukkaan liittämistä keskitettyyn viemäröintijärjestelmään. (Finnish)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Projekt ma zostać zrealizowany w ciągu 69 miesięcy do 31 grudnia 2023 r. Całkowity koszt projektu zaplanowano na kwotę 26 006 448,27 EUR, w tym współfinansowanie z Funduszu Spójności w kwocie 9 932 725,00 EUR. Realizacja projektu zakłada podłączenie 2959 mieszkańców do scentralizowanej sieci kanalizacyjnej. (Polish)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. A projektet a tervek szerint 2023. december 31-ig 69 hónapon belül hajtják végre. A projekt összköltsége 26 006 448,27 EUR, beleértve a Kohéziós Alapból származó 9 932 725,00 EUR összegű társfinanszírozást is. A projekt megvalósítása 2959 lakos csatlakozását irányozza elő egy központi csatornarendszerrel. (Hungarian)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Projekt má být proveden do 69 měsíců do 31. prosince 2023. Celkové náklady na projekt jsou plánovány ve výši 26 006 448,27 EUR, včetně spolufinancování z Fondu soudržnosti ve výši 9 932 725,00 EUR. Realizace projektu předpokládá připojení 2959 obyvatel k centralizované kanalizační soustavě. (Czech)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Tá sé beartaithe an tionscadal a chur chun feidhme laistigh de 69 mí go dtí an 31 Nollaig 2023. Tá costas iomlán an tionscadail beartaithe i suim EUR 26006448,27, lena n-áirítear cómhaoiniú EUR 9932725,00 ón gCiste Comhtháthaithe. Le cur chun feidhme an tionscadail, beartaítear 2959 áitritheoir a nascadh le córas séarachais láraithe. (Irish)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Projekt naj bi se izvedel v 69 mesecih do 31. decembra 2023. Skupni stroški projekta so načrtovani v višini 26 006 448,27 EUR, vključno s sofinanciranjem iz Kohezijskega sklada v višini 9 932 725,00 EUR. Izvedba projekta predvideva povezavo 2959 prebivalcev s centraliziranim kanalizacijskim sistemom. (Slovenian)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Планира се проектът да бъде изпълнен в рамките на 69 месеца до 31 декември 2023 г. Общата стойност на проекта е планирана в размер на 26 006 448,27 EUR, включително съфинансиране от Кохезионния фонд в размер на 9 932 725,00 EUR. Изпълнението на проекта предвижда свързването на 2959 жители към централизирана канализационна система. (Bulgarian)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Il-proġett huwa ppjanat li jiġi implimentat fi żmien 69 xahar sal-31 ta’ Diċembru 2023. L-ispiża totali tal-proġett hija ppjanata fl-ammont ta’ EUR 26006448,27, inkluż il-kofinanzjament mill-Fond ta’ Koeżjoni fl-ammont ta’ EUR 9932725,00. L-implimentazzjoni tal-proġett tipprevedi l-konnessjoni ta’ 2959 abitant ma’ sistema ċentralizzata tad-drenaġġ. (Maltese)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Prevê-se que o projeto seja executado no prazo de 69 meses até 31 de dezembro de 2023. O custo total do projeto está previsto no montante de 26 006 448,27 EUR, incluindo o cofinanciamento do Fundo de Coesão no montante de 9 932 725,00 EUR. A execução do projeto prevê a ligação de 2959 habitantes a um sistema centralizado de esgotos. (Portuguese)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Projektet er planlagt til at blive gennemført inden for 69 måneder indtil 31. december 2023. De samlede projektomkostninger er planlagt til et beløb på 26 006 448,27 EUR, herunder samfinansiering fra Samhørighedsfonden på 9 932 725,00 EUR. Gennemførelsen af projektet indebærer, at 2959 indbyggere skal forbindes med et centraliseret kloaksystem. (Danish)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Proiectul este planificat să fie pus în aplicare în termen de 69 de luni, până la 31 decembrie 2023. Costul total al proiectului este planificat în valoare de 26 006 448,27 EUR, inclusiv cofinanțarea din Fondul de coeziune în valoare de 9 932 725,00 EUR. Implementarea proiectului prevede conectarea a 2959 de locuitori la un sistem centralizat de canalizare. (Romanian)
    3 August 2022
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. Projektet planeras genomföras inom 69 månader fram till den 31 december 2023. Den totala kostnaden för projektet planeras uppgå till 26 006 448,27 EUR, inklusive samfinansiering från Sammanhållningsfonden på 9 932 725,00 EUR. Vid genomförandet av projektet planeras att 2 959 invånare ska anslutas till ett centraliserat avloppssystem. (Swedish)
    3 August 2022
    0 references
    Rīga
    0 references

    Identifiers

    5.3.1.0/18/I/002
    0 references