Renovation of the municipal building at 39I New Street and improvement of energy efficiency (Q3057125)
Jump to navigation
Jump to search
Project Q3057125 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of the municipal building at 39I New Street and improvement of energy efficiency |
Project Q3057125 in Latvia |
Statements
718,218.68 Euro
0 references
844,963.15 Euro
0 references
85.0 percent
0 references
5 November 2019
0 references
30 September 2021
0 references
Jēkabpils novada pašvaldība
0 references
Projekta ‘’Pašvaldības ēkas Jaunā iela 39I atjaunošana un energoefektivitātes paaugstināšana” (turpmāk- Projekts) mērķis ir energoefektivitātes paaugstināšana Jēkabpils pilsētas pašvaldības ēkai Jaunā iela 39I, Jēkabpilī, veicot ieguldījumus atbilstoši pašvaldības attīstības programmā noteiktajām prioritātēm, tādejādi samazinot primārās enerģijas patēriņu un pašvaldības izdevumus par siltumapgādi.Projekta galvenās darbības ir energoefektivitātes uzlabošanas būvdarbi – ēkas ārsienu siltināšana, logu un ārdurvju nomaiņa, pagraba pamatu/ārsienu siltināšana pa ēkas perimetru, savietotā jumta pārseguma siltināšana, apkures sistēmas un tās elementu nomaiņa, ventilācijas sistēmas nomaiņa, iekšējo elektrotīklu atjaunošana, pārbūves būvdarbi, kas nav saistīti ar ēkas energoefektivitātes uzlabošanu, būvdarbu autoruzraudzība, būvuzraudzība un publicitātes pasākumi.Plānotie rezultāti: primārās enerģijas patēriņa samazinājums un siltumnīcefekta gāzu samazinājums.Projekta ilgums: 2019.gada IV ceturksnis– 2021.gada III ceturksnis. Projekta kopējas izmaksas: EUR 2 029 975,43, plānotais ERAF līdzfinansējums EUR 718 218,68. (Latvian)
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Duration of the project: Quarter IV 2019 – Fourth quarter 2021. Total cost of the project: EUR 2 029 975,43, ERDF co-financing planned EUR 718 218,68. (English)
15 July 2021
0.4901190208697057
0 references
Le projet «Rénovation et amélioration de l’efficacité énergétique du bâtiment autonome Jaunā iela 39I» (ci-après le «projet») vise à accroître l’efficacité énergétique du bâtiment de la municipalité de Jēkabpils Jaunā iela 39I, Jekabpils, en investissant conformément aux priorités fixées dans le programme de développement des collectivités locales, réduisant ainsi la consommation d’énergie primaire et les dépenses des administrations locales pour le chauffage. remplacement des fenêtres et des portes extérieures, isolation des fondations sous-sols/murs extérieurs le long du périmètre du bâtiment, isolation du revêtement combiné de toiture, remplacement du système de chauffage et de ses éléments, remplacement du système de ventilation, rénovation des réseaux électriques internes, travaux de reconstruction non liés à l’amélioration de la performance énergétique du bâtiment, supervision des travaux de construction, surveillance de la construction et mesures de publicité. réduction de la consommation d’énergie primaire et réduction des gaz à effet de serre.Durée du projet: T4 2019-QIII 2021. Coût total du projet: 2 029 975,43 EUR, cofinancement prévu par le FEDER de 711 818,68 EUR. (French)
25 November 2021
0 references
Ziel des Projekts „Renovierung und Verbesserung der Energieeffizienz des Selbstverwaltungsgebäudes Jaunā iela 39I“ (nachfolgend – Projekt) ist es, die Energieeffizienz für Jēkabpils Stadtverwaltungsgebäude Jaunā iela 39I, Jekabpils, zu steigern und Investitionen in Übereinstimmung mit den Prioritäten des Entwicklungsprogramms der Kommunalverwaltung zu tätigen, wodurch der Primärenergieverbrauch und die kommunalen Ausgaben für die Heizung gesenkt werden. Die Hauptaktivitäten des Projekts sind Energieeffizienzverbesserungsarbeiten – Isolierung von Außenwänden des Gebäudes, Austausch von Fenstern und Außentüren, Isolierung von Kellerfundamenten/Außenwänden entlang des Gebäudes, Isolierung der kombinierten Dachbedeckung, Austausch der Heizanlage und seiner Elemente, Ersetzung der Lüftungsanlage, Renovierung der internen Stromnetze, Umbauarbeiten, die nicht mit der Verbesserung der Energieeffizienz des Gebäudes zusammenhängen, Autorüberwachung von Bauarbeiten, Bauaufsicht und Publizitätsmaßnahmen. Reduzierung des Primärenergieverbrauchs und Reduzierung von Treibhausgasen.Projektlaufzeit: Q4 2019-QIII 2021. Gesamtkosten des Projekts: 20 299 975,43 EUR, geplante EFRE-Kofinanzierung in Höhe von 7 181 818,68 EUR. (German)
28 November 2021
0 references
Het doel van het project „Renovatie en verbetering van de energie-efficiëntie van het zelfbestuursgebouw Jaunā iela 39I” (hierna — Project) is het verhogen van de energie-efficiëntie voor Jēkabpils stadsgemeentegebouw Jaunā iela 39I, Jekabpils, het doen van investeringen in overeenstemming met de prioriteiten van het ontwikkelingsprogramma van de lokale overheid, waardoor het primaire energieverbruik en de uitgaven van de lokale overheid voor verwarming worden verminderd. De belangrijkste activiteiten van het project zijn energie-efficiëntieverbeteringswerken — isolatie van buitenmuren van het gebouw, vervanging van ramen en buitendeuren, isolatie van kelderfundamenten/buitenmuren langs de omtrek van het gebouw, isolatie van de gecombineerde dakbedekking, vervanging van het verwarmingssysteem en de elementen ervan, vervanging van het ventilatiesysteem, renovatie van interne elektriciteitsnetten, wederopbouwwerkzaamheden die geen verband houden met de verbetering van de energieprestaties van het gebouw, auteurstoezicht op bouwwerken, toezicht op de bouw en publiciteitsmaatregelen. vermindering van het primaire energieverbruik en vermindering van broeikasgassen.Projectduur: VIERDE KWARTAAL 2019-QIII 2021. Totale kosten van het project: 20 299 775,43 EUR, geplande EFRO-medefinanciering van 718 218,68 EUR. (Dutch)
28 November 2021
0 references
L'obiettivo del progetto "Ristrutturazione e miglioramento dell'efficienza energetica dell'edificio autonomo Jaunā iela 39I" (di seguito — progetto) è quello di aumentare l'efficienza energetica per Jēkabpils municipale edificio Jaunā iela 39I, Jekabpils, facendo investimenti in conformità con le priorità stabilite nel programma di sviluppo delle amministrazioni locali, riducendo così il consumo di energia primaria e la spesa pubblica locale per il riscaldamento. Le attività principali del progetto sono opere di miglioramento dell'efficienza energetica — isolamento delle pareti esterne dell'edificio, sostituzione di finestre e porte esterne, isolamento di fondazioni interrate/pareti esterni lungo il perimetro dell'edificio, isolamento della copertura del tetto combinato, sostituzione dell'impianto di riscaldamento e dei suoi elementi, sostituzione del sistema di ventilazione, ristrutturazione delle reti elettriche interne, lavori di ricostruzione non connessi al miglioramento del rendimento energetico dell'edificio, supervisione autore dei lavori di costruzione, supervisione delle costruzioni e misure di pubblicità. riduzione del consumo di energia primaria e riduzione dei gas a effetto serra.Durata del progetto: QUARTO TRIMESTRE 2019-III TRIMESTRE 2021. Costo totale del progetto: 2 029 975,43 EUR, cofinanziamento previsto del FESR per 718 218,68 EUR. (Italian)
11 January 2022
0 references
El objetivo del proyecto «Renovación y mejora de la eficiencia energética del edificio autónomo Jaunā iela 39I» (en adelante — Proyecto) es aumentar la eficiencia energética del edificio municipal de Jēkabpils Jaunā iela 39I, Jekabpils, realizando inversiones de conformidad con las prioridades establecidas en el programa de desarrollo de la administración local, reduciendo así el consumo de energía primaria y los gastos de calefacción de los gobiernos locales. sustitución de ventanas y puertas exteriores, aislamiento de cimientos del sótano/paredes exteriores a lo largo del perímetro del edificio, aislamiento de la cubierta combinada del techo, sustitución del sistema de calefacción y sus elementos, sustitución del sistema de ventilación, renovación de las redes eléctricas internas, obras de reconstrucción no relacionadas con la mejora del rendimiento energético del edificio, supervisión del autor de las obras de construcción, supervisión de la construcción y medidas de publicidad. reducción del consumo de energía primaria y reducción de gases de efecto invernadero. Duración del proyecto: CUARTO TRIMESTRE DE 2019-TERCER TRIMESTRE DE 2021. Coste total del proyecto: 2 029 975,43 EUR, cofinanciación prevista del FEDER de 711 818,68 EUR. (Spanish)
12 January 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Projekti kestus: 2019. aasta IV kvartal – 2021. aasta neljas kvartal. Projekti kogumaksumus: 2 029 975,43 eurot, ERFi kaasrahastamine oli kavandatud 718 218,68 EUR ulatuses. (Estonian)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Projekto trukmė: 2019 m. IV ketvirtis – 2021 m. ketvirtasis ketvirtis. Bendros projekto išlaidos: 2 029 975,43 EUR, ERPF bendras finansavimas planuotas 711 818,68 EUR. (Lithuanian)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Trajanje projekta: Tromjesečje 2019. četvrto tromjesečje 2021. Ukupni trošak projekta: 2 029 975,43 EUR, sufinanciranje EFRR-a planirano je 711 818,68 EUR. (Croatian)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Διάρκεια του σχεδίου: Τρίμηνο IV 2019 — Τέταρτο τρίμηνο 2021. Συνολικό κόστος του σχεδίου: 2 029 975,43 EUR, η συγχρηματοδότηση από το ΕΤΠΑ είχε προγραμματιστεί για 718 218,68 EUR. (Greek)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Trvanie projektu: Štvrťrok IV 2019 – štvrtý štvrťrok 2021. Celkové náklady na projekt: 2 029 975,43 EUR, plánované spolufinancovanie z EFRR 718 218,68 EUR. (Slovak)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Hankkeen kesto: Vuoden 2019 neljäs neljännes – vuoden 2021 neljäs neljännes. Hankkeen kokonaiskustannukset: 2 029 975,43 euroa, EAKR:n osarahoitus oli 718 218,68 euroa. (Finnish)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Czas trwania projektu: IV kwartał 2019 r. – czwarty kwartał 2021 r. Całkowity koszt projektu: 2 029 975,43 EUR, współfinansowanie z EFRR planowane jest na kwotę 711 818,68 EUR. (Polish)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. A projekt időtartama: 2019. IV. negyedév – 2021 negyedik negyedéve A projekt összköltsége: 2 029 975,43 EUR, ERFA társfinanszírozás tervezett összege 711 818,68 EUR. (Hungarian)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Doba trvání projektu: Čtvrtletí 2019 – čtvrté čtvrtletí 2021. Celkové náklady projektu: 20 299 775,43 EUR, plánováno spolufinancování z EFRR 718 218,68 EUR. (Czech)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Fad an tionscadail: Ráithe IV 2019 — Ceathrú ráithe 2021. Costas iomlán an tionscadail: EUR 2 029 975,43, cómhaoiniú CFRE beartaithe EUR 718 218,68. (Irish)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Trajanje projekta: Četrto četrtletje 2019 – četrto četrtletje 2021. Skupni stroški projekta: 2 029 975,43 EUR, načrtovano sofinanciranje ESRR je bilo 728 218,68 EUR. (Slovenian)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Продължителност на проекта: Тримесечие IV 2019 г. — четвърто тримесечие на 2021 г. Обща стойност на проекта: 2 029 975,43 EUR, съфинансиране от ЕФРР е планирано 718 218,68 EUR. (Bulgarian)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Tul ta’ żmien tal-proġett: Trimestru IV 2019 — Ir-raba’ kwart tal-2021. Spiża totali tal-proġett: EUR 2 029 975,43, il-kofinanzjament tal-FEŻR ippjana EUR 718 218,68. (Maltese)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Duração do projecto: Quarto trimestre IV de 2019 – quarto trimestre de 2021. Custo total do projecto: 2 029 975,43 EUR, cofinanciamento do FEDER previsto: 718 218,68 EUR. (Portuguese)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Projektets varighed: Fjerde kvartal 2019 — fjerde kvartal 2021. Samlede projektomkostninger: 20 299 975,43 EUR, EFRU-medfinansiering er planlagt til 711 818,68 EUR. (Danish)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Durata proiectului: Trimestrul IV 2019 – al patrulea trimestru al anului 2021. Costul total al proiectului: 2 029 975,43 EUR, cofinanțare din FEDR planificată pentru 71 818,68 EUR. (Romanian)
3 August 2022
0 references
The aim of the project “Renovation and increase of energy efficiency of municipal building Jaun iela 39I” (hereafter – Project) is to increase energy efficiency for Jēkabpils municipal building Jaun iela 39I by investing in accordance with priorities set in the municipal development programme, thus reducing primary energy consumption and municipal expenditure on heating supply.The main activities of the project are energy efficiency improvement works – insulation of exterior walls of the building, replacement of windows and external doors, basement foundation/outputs of the building, supervision of the heating system, renovation of the construction works with renovation of the building.The insulation of the building walls, replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the building’s building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/output of the building, the replacement of the heating system, the insulation of the construction works, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the thermal insulation of the building, the replacement of windows and external doors, the replacement of the basement/outputs of the building, the replacement of the building, the renovation of the building, the insulation of the building, the replacement of windows and external doors, the replacement of the basement base/outputs of the building, which is not the replacement of the building in the building, the insulation of the building, the insulation of windows and external doors, the replacement of the basement base/outputs, the replacement of the building’s structure, the replacement of the building with the building, the replacement of windows and exterior doors, the replacement of the basement grounds/outputs, the replacement of the building’s internal building, the replacement of the building with the building, the insulation of the building, and the replacement of the building’s basement/outdoor, which is not the replacement of the interior of the building, as well as the insulation of the building, the insulation of the building walls, replacement of windows and external doors, the replacement of the basement/outside of the building, the renovation of the building, the renovation of the building in the building, the insulation of Reduction of primary energy consumption and reduction of greenhouse gases. Projektets varaktighet: Kvartal IV 2019 – fjärde kvartalet 2021. Totalkostnad för projektet: 2 029 975,43 EUR, medfinansiering från Eruf planerade 7 118 218,68 EUR. (Swedish)
3 August 2022
0 references
Jaunā iela 39I, Jēkabpils, Jēkabpils nov., LV-5201