Development of business environment in Liepaja, round I. (Q3056765)
Jump to navigation
Jump to search
Project Q3056765 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of business environment in Liepaja, round I. |
Project Q3056765 in Latvia |
Statements
909,507.64 Euro
0 references
1,070,008.99 Euro
0 references
85.0 percent
0 references
4 October 2017
0 references
3 November 2018
0 references
Liepājas pilsētas pašvaldības iestāde "Liepājas pilsētas pašvaldības administrācija"
0 references
Projekta “Uzņēmējdarbības vides attīstība Liepājā, I kārta” (turpmāk tekstā – Projekts) mērķis ir palielināt privāto investīciju apjomu un jaunu darba vietu izveidi Liepājā, veicot ieguldījumus pilsētas infrastruktūrā, netieši ar to atbalstot Projekta teritorijā šobrīd strādājošos un potenciālos nākotnē piesaistāmos komersantus un uzlabojot pilsētvidi.Projekta ietvaros tiks pārbūvēta Krūmu iela posmā no Ziemeļu ielas līdz Pulvera ielai. Pašlaik esošā ielas infrastruktūra un tās teritorija nav piemērota iedzīvotāju iespējām veiksmīgi pārvietoties šajā teritorijā, kā arī nav piemērota uzņēmējdarbības attīstībai.Veicot ielas infrastruktūras pārbūvi, tiks atjaunots esošais ielas segums un posmā, kurā pašlaik nav asfalta segums, tas tiks izveidots, izbūvēts apgaismojums, izbūvēta jauna lietus ūdens kanalizācija, pārbūvēta esošā un izbūvēta jauna sadzīves kanalizācijas un ūdensapgādes sistēma, pārvietoti elektronisko sakaru tīkli zem ietves.Liepājas pilsētas pašvaldība (turpmāks tekstā – Pašvaldība) ir veikusi sarunas ar Krūmu ielas teritorijā strādājošiem komersantiem un fiziskām personām, kuras vēlas attīstīt savu uzņēmējdarbību šajā ielas teritorijā, par šīs teritorijas attīstību, un saņēmusi viena uzņēmuma apliecinājuma par interesi šo teritoriju attīstīt un vienas fiziskās personas apliecinājuma par interesi šo teritoriju attīstīt . Uzņēmums apliecinājis, ka veiks investīcijas savā uzņēmumā par vismaz EUR 1 466 926,00 apjomā un izveidos vismaz 45 jaunas darba vietas.Būvprojekts ir izstrādāts 2015.gadā. Projekta īstenošanas laikā, veicot būvdarbus, tiks nodrošināta būvdarbu būvuzraudzība un autoruzraudzība, kā arī Projekta publicitātes pasākumi.Projekta kopējās attiecināmās izmaksas ir 1 070 008,99 euro. Plānotais līdzfinansējums no ERAF – 909 507,64 euro, kas veido 85% no Projekta attiecināmām izmaksām.Projektu plānots uzsākt 2017.gadā un pabeigt 2018.gadā 13 mēnešu laikā. (Latvian)
0 references
The aim of the project “Development of the Business Environment in Liepaja, Round I” (hereinafter – the Project) is to increase the amount of private investments and the creation of new jobs in Liepaja by investing in city infrastructure, indirectly by supporting current and potential future entrepreneurs working in the Project area and improving the urban environment. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. During the implementation of the project, construction supervision and author supervision, as well as publicity measures, will be ensured.The total eligible costs of the project are EUR 1070008,99. Planned co-financing from ERDF – EUR 909507,64, which represents 85 % of the eligible costs of the Project.The project is planned to start in 2017 and complete in 2018 within 13 months. (English)
15 July 2021
0.8101313448622363
0 references
L’objectif du projet «Développement de l’environnement des affaires à Liepaja, phase I» (ci-après «le projet») est d’augmenter le montant des investissements privés et la création de nouveaux emplois à Liepaja en investissant dans l’infrastructure de la ville, indirectement en soutenant les employés et les futurs entrepreneurs potentiels du projet et en améliorant l’environnement urbain. Les infrastructures routières existantes et son territoire ne sont pas adaptés aux possibilités de déplacement des gens dans cette zone, ainsi que ne sont pas adaptés au développement des affaires.Avec la reconstruction de l’infrastructure de la rue, la chaussée existante sera restaurée et dans la section où il n’y a actuellement pas de couverture asphaltée, elle sera créée, l’éclairage sera construit, de nouveaux égouts pluviaux sont construits, de nouveaux systèmes d’assainissement et d’approvisionnement en eau ont été reconstruits, la municipalité de Liepaja (ci-après — l’administration locale) a négocié avec les commerçants et les personnes physiques travaillant sur le territoire de la rue Krūmu, qui souhaitent développer leur activité dans cette zone, sur le développement de cette zone, et ont reçu une déclaration d’une société d’intérêt pour le développement de la zone et une déclaration d’une personne physique intéressée à l’aménagement de la zone. La société a confirmé qu’elle investira dans son entreprise pour au moins 1 466 926,00 EUR et créera au moins 45 nouveaux emplois. Le projet de construction a été développé en 2015. Au cours de la mise en œuvre du projet, la supervision de la construction et la supervision par l’auteur des travaux de construction seront assurées, ainsi que les mesures de publicité du projet. Le coût total éligible du projet s’élève à 1 070 000 008,99 EUR. Cofinancement prévu par le FEDER — 909 507,64 EUR, qui représente 85 % des coûts éligibles du projet. Le projet devrait débuter en 2017 et s’achever en 2018 dans un délai de 13 mois. (French)
25 November 2021
0 references
Ziel des Projekts „Entwicklung der Rahmenbedingungen für Unternehmen in Liepaja, Phase I“ (nachfolgend – das Projekt) ist es, die privaten Investitionen und die Schaffung neuer Arbeitsplätze in Liepaja zu erhöhen, indem in die Stadtinfrastruktur investiert wird, indirekt durch die Unterstützung der Mitarbeiter des Projekts und potenzieller künftiger Unternehmer und durch die Verbesserung der städtischen Umwelt. Die bestehende Straßeninfrastruktur und ihr Territorium eignen sich nicht für die Möglichkeiten der Menschen, sich in diesem Bereich erfolgreich zu bewegen, und sind auch nicht für die Geschäftsentwicklung geeignet.Mit dem Wiederaufbau der Straßeninfrastruktur wird der bestehende Straßenbelag restauriert und in dem Abschnitt, wo derzeit keine Asphaltabdeckung vorhanden ist, wird es geschaffen, Beleuchtung wird gebaut, neue Regenwasserkanalisation gebaut, neue Kanalisationen für Haushalt und Wasserversorgung wieder aufgebaut, die Gemeinde Liepaja (im Folgenden die Gemeindeverwaltung) hat mit Kaufleuten und natürlichen Personen verhandelt, die auf dem Gebiet der Krūmu-Straße arbeiten, die ihre Geschäfte in diesem Straßengebiet ausbauen wollen, über die Entwicklung dieses Gebiets und eine Erklärung eines Unternehmens von Interesse an der Entwicklung des Gebiets und eine Erklärung einer natürlichen Person, die an der Entwicklung des Gebiets interessiert ist. Das Unternehmen hat bestätigt, dass es für mindestens 1 466 926,00 EUR in sein Unternehmen investieren und mindestens 45 neue Arbeitsplätze schaffen wird. Das Bauprojekt wurde 2015 entwickelt. Während der Projektdurchführung werden die Bauaufsicht und die Autorenaufsicht der Bauarbeiten sowie die Publizitätsmaßnahmen des Projekts sichergestellt. Die förderfähigen Gesamtkosten des Projekts belaufen sich auf 1 070 008,99 EUR. Geplante Kofinanzierung aus dem EFRE – 909 507,64 EUR, auf die 85 % der förderfähigen Kosten des Projekts entfallen. Das Projekt soll 2017 beginnen und 2018 innerhalb von 13 Monaten abgeschlossen werden. (German)
28 November 2021
0 references
Het project „Ontwikkeling van het ondernemingsklimaat in Liepaja, fase I” (hierna „het project” genoemd) heeft tot doel het bedrag van de particuliere investeringen en het scheppen van nieuwe banen in Liepaja te verhogen door te investeren in de stadsinfrastructuur, indirect door de werknemers en potentiële toekomstige ondernemers van het project te ondersteunen en de stedelijke omgeving te verbeteren. De bestaande straatinfrastructuur en zijn grondgebied zijn niet geschikt voor de mogelijkheden van de mensen om zich in dit gebied met succes te verplaatsen, evenals zijn niet geschikt voor bedrijfsontwikkeling.Met de wederopbouw van de straatinfrastructuur zal de bestaande straatverharding worden hersteld en in het gedeelte waar momenteel geen asfaltbedekking is, zal het worden gecreëerd, zal verlichting worden gebouwd, wordt nieuwe riolering van het regenwater gebouwd, is nieuw huishoudelijk riolering en watervoorzieningssysteem herbouwd, de gemeente Liepaja City (hierna: de lokale overheid) heeft onderhandeld met handelaren en natuurlijke personen die werkzaam zijn op het grondgebied van Krūmu Street, die hun bedrijf in dit straatgebied willen ontwikkelen, over de ontwikkeling van dit gebied, en een verklaring hebben ontvangen van een bedrijf dat belang heeft bij de ontwikkeling van het gebied en een verklaring hebben ontvangen van een natuurlijke persoon die belang heeft bij de ontwikkeling van het gebied. Het bedrijf heeft bevestigd dat het in haar bedrijf zal investeren voor minimaal 1 466 926,00 EUR en dat het minstens 45 nieuwe banen zal creëren. Het bouwproject is in 2015 ontwikkeld. Tijdens de uitvoering van het project zal worden gezorgd voor het toezicht op de bouw en het toezicht op de auteurs van de bouwwerken, alsmede voor de publiciteitsmaatregelen van het project. De totale subsidiabele kosten van het project bedragen 10 700 000 089,9 EUR. Geplande medefinanciering uit het EFRO — 909 507,64 EUR, wat goed is voor 85 % van de subsidiabele kosten van het project. Het project zal naar verwachting in 2017 van start gaan en in 2018 binnen 13 maanden worden voltooid. (Dutch)
28 November 2021
0 references
L'obiettivo del progetto "Sviluppo dell'ambiente imprenditoriale a Liepaja, fase I" (di seguito "il progetto") è quello di aumentare l'importo degli investimenti privati e la creazione di nuovi posti di lavoro a Liepaja investendo nelle infrastrutture urbane, indirettamente sostenendo i dipendenti del progetto e i potenziali imprenditori futuri e migliorando l'ambiente urbano. L'infrastruttura stradale esistente e il suo territorio non sono adatti per le opportunità delle persone di muoversi con successo in questa zona, così come non sono adatti per lo sviluppo commerciale. Con la ricostruzione dell'infrastruttura stradale, il marciapiede esistente sarà ripristinato e nella sezione in cui attualmente non c'è copertura di asfalto, sarà creato, l'illuminazione sarà costruita, nuove fognature dell'acqua piovana è stata costruita, nuova fognatura domestica e sistema di approvvigionamento idrico è stato ricostruito, il Comune di Liepaja (di seguito — il governo locale) ha negoziato con commercianti e persone fisiche che lavorano nel territorio di via Krūmu, che desiderano sviluppare la loro attività in questa zona, circa lo sviluppo di questa zona, e hanno ricevuto una dichiarazione da parte di una società di interesse per lo sviluppo della zona e una dichiarazione di una persona fisica interessata a sviluppare l'area. La società ha confermato che investirà nella propria azienda per almeno EUR 1.466.926,00 e creerà almeno 45 nuovi posti di lavoro. Il progetto di costruzione è stato sviluppato nel 2015. Durante l'attuazione del progetto, saranno assicurate la supervisione della costruzione e la supervisione dell'autore dei lavori di costruzione, nonché le misure di pubblicità del progetto. Il costo totale ammissibile del progetto è di 1 070 008,99 EUR. Cofinanziamento previsto del FESR — 909 507,64 EUR, che rappresenta l'85 % dei costi ammissibili del progetto. Il progetto dovrebbe iniziare nel 2017 e concludersi nel 2018 entro 13 mesi. (Italian)
11 January 2022
0 references
El objetivo del proyecto «Desarrollo del entorno empresarial en Liepaja, Fase I» (en adelante, el proyecto) es aumentar la cantidad de inversión privada y la creación de nuevos puestos de trabajo en Liepaja mediante la inversión en la infraestructura de la ciudad, indirectamente apoyando a los empleados y potenciales emprendedores del proyecto y mejorando el entorno urbano. La infraestructura de la calle existente y su territorio no son adecuados para las oportunidades de las personas para moverse con éxito en esta zona, así como no son adecuados para el desarrollo empresarial.Con la reconstrucción de la infraestructura de la calle, se restaurará el pavimento de calles existente y en el tramo donde actualmente no hay cubierta de asfalto, se creará, se construirá iluminación, se construirá un nuevo alcantarillado de agua pluvial, se ha reconstruido el nuevo sistema de alcantarillado doméstico y suministro de agua, el Ayuntamiento de Liepaja (en adelante — el gobierno local) ha negociado con comerciantes y personas físicas que trabajan en el territorio de la calle Krūmu, que desean desarrollar su negocio en esta zona, sobre el desarrollo de esta zona, y han recibido una declaración de una empresa de interés en el desarrollo de la zona y una declaración de una persona física de interés en el desarrollo de la zona. La empresa ha confirmado que invertirá en su empresa por al menos 1 466 926,00 EUR y creará al menos 45 nuevos puestos de trabajo. El proyecto de construcción se desarrolló en 2015. Durante la ejecución del proyecto, se garantizará la supervisión de la construcción y la supervisión de los autores de las obras de construcción, así como las medidas de publicidad del proyecto. El coste total subvencionable del proyecto es de 1 070 000 008,99 EUR. Cofinanciación prevista del FEDER — 909 507,64 EUR, que representa el 85 % de los costes subvencionables del proyecto. Se prevé que el proyecto comience en 2017 y se complete en 2018 en un plazo de 13 meses. (Spanish)
12 January 2022
0 references
Projekti „Ettevõtluskeskkonna arendamine Liepajas, I voor“ (edaspidi – projekt) eesmärk on suurendada erainvesteeringute mahtu ja uute töökohtade loomist Liepajas, investeerides linna infrastruktuuri kaudselt, toetades kaudselt projekti valdkonnas praegusi ja võimalikke tulevasi ettevõtjaid ning parandades linnakeskkonda. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Projekti elluviimise ajal tagatakse ehitusjärelevalve ja autorite järelevalve ning avalikustamismeetmed. Projekti abikõlblikud kogukulud on 1070008,99 eurot. Kavandatav kaasrahastamine ERFist – 909507,64 eurot, mis moodustab 85 % projekti rahastamiskõlblikest kuludest. Projekt peaks algama 2017. aastal ja lõppema 2018. aastal 13 kuu jooksul. (Estonian)
3 August 2022
0 references
Projekto „Verslo aplinkos plėtra Liepojoje, I raundas“ (toliau – Projektas) tikslas – padidinti privačių investicijų ir naujų darbo vietų kūrimą Liepojoje investuojant į miesto infrastruktūrą, netiesiogiai remiant esamus ir galimus būsimus verslininkus, dirbančius projekto teritorijoje ir gerinant miesto aplinką. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Projekto įgyvendinimo metu bus užtikrinta statybos priežiūra ir autorinė priežiūra, taip pat viešinimo priemonės. Bendros tinkamos finansuoti projekto išlaidos yra 1 070 008,99 EUR. Planuojamas bendras finansavimas iš ERPF – 909 507,64 EUR, t. y. 85 proc. tinkamų finansuoti projekto išlaidų.Projektą planuojama pradėti 2017 m. ir užbaigti 2018 m. per 13 mėnesių. (Lithuanian)
3 August 2022
0 references
Cilj projekta „Razvoj poslovnog okruženja u Liepaji, I. krug” (u daljnjem tekstu – Projekt) je povećanje iznosa privatnih investicija i otvaranje novih radnih mjesta u Liepaji ulaganjem u gradsku infrastrukturu, neizravno podržavanjem sadašnjih i potencijalnih budućih poduzetnika koji rade na području projekta i poboljšanjem urbanog okruženja. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Tijekom provedbe projekta osigurat će se nadzor gradnje i nadzor autora, kao i mjere promidžbe. Ukupni prihvatljivi troškovi projekta iznose 1 070 008,99 EUR. Planirano sufinanciranje iz EFRR-a – 909 507,64 EUR, što čini 85 % prihvatljivih troškova projekta. Projekt bi trebao započeti 2017. i završiti 2018. u roku od 13 mjeseci. (Croatian)
3 August 2022
0 references
Στόχος του έργου «Ανάπτυξη του επιχειρηματικού περιβάλλοντος στη Liepaja, Γύρος Ι» (στο εξής — το έργο) είναι η αύξηση του ποσού των ιδιωτικών επενδύσεων και η δημιουργία νέων θέσεων εργασίας στη Liepaja, επενδύοντας στις υποδομές των πόλεων, υποστηρίζοντας έμμεσα τους υφιστάμενους και δυνητικούς μελλοντικούς επιχειρηματίες που εργάζονται στην περιοχή του έργου και βελτιώνοντας το αστικό περιβάλλον. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Κατά τη διάρκεια της υλοποίησης του έργου, της επίβλεψης της κατασκευής και της επίβλεψης του δημιουργού, καθώς και των μέτρων δημοσιότητας, θα εξασφαλιστούν. Οι συνολικές επιλέξιμες δαπάνες του έργου ανέρχονται σε 1 070 008,99 EUR. Προγραμματισμένη συγχρηματοδότηση από το ΕΤΠΑ — 909 507,64 EUR, ποσό που αντιπροσωπεύει το 85 % των επιλέξιμων δαπανών του έργου. Το έργο προβλέπεται να ξεκινήσει το 2017 και να ολοκληρωθεί το 2018 εντός 13 μηνών. (Greek)
3 August 2022
0 references
Cieľom projektu „Rozvoj podnikateľského prostredia v Liepaji, 1. kolo“ (ďalej len „projekt“) je zvýšiť objem súkromných investícií a vytvoriť nové pracovné miesta v Liepaji investovaním do mestskej infraštruktúry nepriamo podporovaním súčasných a potenciálnych budúcich podnikateľov pracujúcich v oblasti projektu a zlepšovaním mestského prostredia. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Počas realizácie projektu bude zabezpečený stavebný dozor a autorský dozor, ako aj propagačné opatrenia. Celkové oprávnené náklady projektu sú 1 070 008,99 EUR. Plánované spolufinancovanie z EFRR – 909 507,64 EUR, čo predstavuje 85 % oprávnených nákladov projektu. Projekt sa má začať v roku 2017 a dokončiť v roku 2018 do 13 mesiacov. (Slovak)
3 August 2022
0 references
Hankkeen ”Yritysympäristön kehittäminen Liepajassa 1. kierros” (jäljempänä ’hanke’) tavoitteena on lisätä yksityisten investointien määrää ja uusien työpaikkojen luomista Liepajassa investoimalla kaupunkiinfrastruktuuriin, tukemalla välillisesti hankealueella työskenteleviä nykyisiä ja mahdollisia tulevia yrittäjiä ja parantamalla kaupunkiympäristöä. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Hankkeen toteutuksen aikana varmistetaan rakentamisen valvonta ja tekijöiden valvonta sekä tiedotustoimet. Hankkeen tukikelpoiset kokonaiskustannukset ovat 1070008,99 euroa. Suunniteltu yhteisrahoitus EAKR:sta – 909507,64 euroa, mikä vastaa 85:tä prosenttia hankkeen tukikelpoisista kustannuksista. Hankkeen on tarkoitus alkaa vuonna 2017 ja saattaa päätökseen vuonna 2018 13 kuukauden kuluessa. (Finnish)
3 August 2022
0 references
Celem projektu „Rozwój otoczenia biznesowego w Liepaja, Runda I” (dalej – Projekt) jest zwiększenie liczby inwestycji prywatnych i tworzenie nowych miejsc pracy w Liepaja poprzez inwestowanie w infrastrukturę miejską, pośrednio poprzez wspieranie obecnych i potencjalnych przyszłych przedsiębiorców pracujących w obszarze Projektu oraz poprawę środowiska miejskiego. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Podczas realizacji projektu zapewniony zostanie nadzór budowlany i nadzór autorski, a także działania promocyjne. Całkowite koszty kwalifikowalne projektu wynoszą 1 070 008,99 EUR. Planowane współfinansowanie z EFRR – 909 507,64 EUR, co stanowi 85 % kosztów kwalifikowalnych projektu. Projekt ma rozpocząć się w 2017 r. i zakończyć w 2018 r. w ciągu 13 miesięcy. (Polish)
3 August 2022
0 references
Az „Üzleti környezet fejlesztése Liepajában, I. forduló” (a továbbiakban: a projekt) célja, hogy növelje a magánberuházások összegét és új munkahelyek teremtését Liepajában azáltal, hogy közvetetten támogatja a projekt területén dolgozó jelenlegi és potenciális jövőbeli vállalkozókat és javítja a városi környezetet. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. A projekt végrehajtása során biztosítani kell az építési felügyeletet és a szerzők felügyeletét, valamint a nyilvánosságot célzó intézkedéseket. A projekt teljes elszámolható költsége 1 070 008,99 EUR. Tervezett társfinanszírozás az ERFA-ból – 909 507,64 EUR, amely a projekt elszámolható költségeinek 85%-át teszi ki. A projekt a tervek szerint 2017-ben indul, és 13 hónapon belül 2018-ban fejeződik be. (Hungarian)
3 August 2022
0 references
Cílem projektu „Rozvoj podnikatelského prostředí v Liepaji, kolo I“ (dále jen „projekt“) je zvýšit objem soukromých investic a vytváření nových pracovních míst v Liepaji investováním do městské infrastruktury, nepřímo podporou současných i potenciálních budoucích podnikatelů pracujících v oblasti projektu a zlepšením městského prostředí. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Během realizace projektu bude zajištěn stavební dozor a autorský dozor, jakož i propagační opatření. Celkové způsobilé náklady projektu činí 1 070 008,99 EUR. Plánované spolufinancování z EFRR – 909 507,64 EUR, což představuje 85 % způsobilých nákladů projektu. Projekt má být zahájen v roce 2017 a dokončen v roce 2018 do 13 měsíců. (Czech)
3 August 2022
0 references
Is é aidhm an tionscadail “Forbairt na Timpeallachta Gnó i Liepaja, Babhta I” (anseo feasta — an Tionscadal) méid na n-infheistíochtaí príobháideacha a mhéadú agus poist nua a chruthú i Liepaja trí infheistíocht a dhéanamh i mbonneagar cathrach, go hindíreach trí thacú le fiontraithe atá ann faoi láthair agus a d’fhéadfadh a bheith ann amach anseo atá ag obair i limistéar an Tionscadail agus feabhas a chur ar an timpeallacht uirbeach. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Le linn chur chun feidhme an tionscadail, déanfar maoirseacht tógála agus maoirseacht ar údair, chomh maith le bearta poiblíochta, a áirithiú.Is é EUR 1070008,99 na costais incháilithe iomlána a bhaineann leis an tionscadal. Cómhaoiniú beartaithe ó CFRE — EUR 909507,64, arb ionann é agus 85 % de chostais incháilithe an Tionscadail.Tá sé beartaithe tús a chur leis an tionscadal in 2017 agus é a chur i gcrích in 2018 laistigh de 13 mhí. (Irish)
3 August 2022
0 references
Cilj projekta „Razvoj poslovnega okolja v Liepaji, I. krog“ (v nadaljevanju projekt) je povečati obseg zasebnih naložb in ustvarjanje novih delovnih mest v Liepaji z vlaganjem v mestno infrastrukturo, posredno s podpiranjem sedanjih in potencialnih bodočih podjetnikov, ki delajo na področju Projekta, in izboljšanjem urbanega okolja. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Med izvajanjem projekta bodo zagotovljeni gradbeni nadzor in avtorski nadzor ter ukrepi obveščanja javnosti.Skupni upravičeni stroški projekta znašajo 1 070 008,99 EUR. Načrtovano sofinanciranje iz ESRR – 909 507,64 EUR, kar predstavlja 85 % upravičenih stroškov projekta. Projekt naj bi se začel v letu 2017 in zaključil v letu 2018 v 13 mesecih. (Slovenian)
3 August 2022
0 references
Целта на проекта „Развитие на бизнес средата в Лиепая„, първи кръг (наричан по-долу „Проектът“) е да се увеличи размерът на частните инвестиции и създаването на нови работни места в Лиепая чрез инвестиране в градска инфраструктура, непряко чрез подпомагане на настоящите и потенциалните бъдещи предприемачи, работещи в района на проекта и подобряване на градската среда. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. По време на изпълнението на проекта ще бъдат осигурени строителен надзор и авторски надзор, както и рекламни мерки.Общите допустими разходи по проекта са 1 070 008,99 EUR. Планирано съфинансиране от ЕФРР — 909 507,64 EUR, което представлява 85 % от допустимите разходи по проекта. Проектът е планиран да започне през 2017 г. и да приключи през 2018 г. в рамките на 13 месеца. (Bulgarian)
3 August 2022
0 references
L-għan tal-proġett “Żvilupp tal-Ambjent tan-Negozju f’Liepaja, Round I” (minn hawn’il quddiem — il-Proġett) huwa li jżid l-ammont ta’ investimenti privati u l-ħolqien ta’ impjiegi ġodda f’Liepaja billi jinvesti fl-infrastruttura tal-belt, indirettament billi jappoġġa intraprendituri attwali u potenzjali futuri li jaħdmu fiż-żona tal-Proġett u jtejjeb l-ambjent urban. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Matul l-implimentazzjoni tal-proġett, se jiġu żgurati s-superviżjoni tal-kostruzzjoni u s-superviżjoni tal-awtur, kif ukoll miżuri ta’ pubbliċità. L-ispejjeż totali eliġibbli tal-proġett huma ta’ EUR 1070008,99. Kofinanzjament ippjanat mill-FEŻR — EUR 909507,64, li jirrappreżenta 85 % tal-ispejjeż eliġibbli tal-Proġett. Il-proġett huwa ppjanat li jibda fl-2017 u jitlesta fl-2018 fi żmien 13-il xahar. (Maltese)
3 August 2022
0 references
O objetivo do projeto «Desenvolvimento do ambiente empresarial em Liepaja, Rodada I» (a seguir designado «o projeto») é aumentar o volume de investimentos privados e a criação de novos postos de trabalho em Liepaja, investindo em infraestruturas municipais, indiretamente apoiando os atuais e potenciais futuros empresários que trabalham na área do projeto e melhorando o ambiente urbano. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Durante a execução do projeto, será assegurada a supervisão da construção e a supervisão dos autores, bem como as medidas de publicidade. Os custos totais elegíveis do projeto ascendem a 10 700 089,9 EUR. Cofinanciamento previsto do FEDER — 909 507,64 EUR, o que representa 85 % dos custos elegíveis do projeto. O projeto deverá ter início em 2017 e ser concluído em 2018 no prazo de 13 meses. (Portuguese)
3 August 2022
0 references
Formålet med projektet "Udvikling af erhvervsmiljøet i Liepaja, runde I" (i det følgende benævnt "projektet") er at øge mængden af private investeringer og skabelsen af nye arbejdspladser i Liepaja ved at investere i byinfrastruktur, indirekte ved at støtte nuværende og potentielle fremtidige iværksættere, der arbejder i projektområdet, og forbedre bymiljøet. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Under gennemførelsen af projektet vil der blive sikret tilsyn med byggeriet og forfattertilsyn samt reklameforanstaltninger.De samlede støtteberettigede omkostninger til projektet beløber sig til 1 070 008,99 EUR. Planlagt samfinansiering fra EFRU — 909 507,64 EUR, hvilket svarer til 85 % af projektets støtteberettigede omkostninger. Projektet er planlagt til at starte i 2017 og afsluttes i 2018 inden for 13 måneder. (Danish)
3 August 2022
0 references
Scopul proiectului „Dezvoltarea mediului de afaceri în Liepaja, Runda I” (denumit în continuare – Proiectul) este de a crește volumul investițiilor private și de a crea noi locuri de muncă în Liepaja prin investiții în infrastructura urbană, indirect prin sprijinirea antreprenorilor actuali și potențiali care lucrează în domeniul proiectului și prin îmbunătățirea mediului urban. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Pe parcursul implementării proiectului, se vor asigura supravegherea construcției și supravegherea autorului, precum și măsuri de publicitate. Costurile eligibile totale ale proiectului sunt de 1 070 008,99 EUR. Cofinanțare planificată din FEDR – 909 507,64 EUR, ceea ce reprezintă 85 % din costurile eligibile ale proiectului. Proiectul este planificat să înceapă în 2017 și să se finalizeze în 2018 în termen de 13 luni. (Romanian)
3 August 2022
0 references
Syftet med projektet ”Utveckling av företagsklimatet i Liepaja, runda I” (nedan kallat projektet) är att öka antalet privata investeringar och skapandet av nya arbetstillfällen i Liepaja genom att investera i stadsinfrastruktur, indirekt genom att stödja nuvarande och potentiella framtida företagare som arbetar inom projektområdet och förbättra stadsmiljön. The existing street infrastructure and its territory is not suitable for successful movement in this territory, as well as is not suitable for business development.Reconstruction of the street infrastructure will be restored and in section where there is no asphalt cover, it will be created, lighting will be built, new rainwater drainage was built, new rainwater sewerage system will be rebuilt and new system of household sewerage and water supply is built, it will be created, lighting will be built, a new rainwater drainage system will be built, a new rainwater drainage drainage system will be built, a new rainwater drainage system will be built, it will be built, it will be built, it will be built, a new rainwater drainage system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, lighting will be built, a new rainwater sewerage system will be built, a new rainwater sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be created, it will be built, lighting will be built, a new rain rain water sewerage sewerage system will be built, and a new household sewerage and water supply system will be rebuilt, it will be constructed, it will be constructed, lighting will be built, a new rain rainwater drainage system will be built, a new rainwater drainage system will be built, it will be rebuilt and a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be rebuilt, a new household sewerage and water supply system will be built, it will be built, it will be built, lighting will be built, a new rainwater drainage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rainwater sewerage drainage has been built, a new rainwater drainage system will be built, a new system of household sewerage and water supply will be built, it will be built, lighting will be built, a new rain rain The company has confirmed that it will invest at least EUR 1 466 926.00 and will create at least 45 new jobs.The project was developed in 2015. Under projektets genomförande kommer det att säkerställas att byggövervakning och författartillsyn samt publicitetsåtgärder vidtas.De totala stödberättigande kostnaderna för projektet uppgår till 1 070 008,99 EUR. Planerad medfinansiering från Eruf – 909 507,64 EUR, vilket motsvarar 85 % av de stödberättigande kostnaderna för projektet. Projektet planeras starta 2017 och slutföras 2018 inom 13 månader. (Swedish)
3 August 2022
0 references
Krūmu iela, Liepāja
0 references
Mazirbes iela, Liepāja
0 references
Identifiers
3.3.1.0/16/I/031
0 references