Supplementary waste water networks – Sector II (Q2982272)
Jump to navigation
Jump to search
Project Q2982272 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Supplementary waste water networks – Sector II |
Project Q2982272 in Portugal |
Statements
632,012.51 Euro
0 references
743,544.14 Euro
0 references
85.0 percent
0 references
6 January 2016
0 references
30 September 2020
0 references
MUNICÍPIO DE LOUSADA
0 references
Esta operação comporta um estudo de viabilidade financeira, um estudo de prospeção geológica e geotécnica a construção de uma rede em baixa com 7298 m na União de freguesias de Cernadelo, São Miguel Lousada, Santa Margarida Lousada e Torno. Inclui uma componente de alta com a construção de quatro interoceptores em Cernadelo, Boim, Meinedo e Aparecida. (Portuguese)
0 references
This operation includes a study of financial viability, a study of geological and geotechnical prospecting the construction of a low network with 7298 m in the Union of parishes of Cernadelo, São Miguel Lousada, Santa Margarida Lousada and Torno. It includes a high component with the construction of four interoceptors in Cernadelo, Boim, Meinedo and Aparecida. (English)
9 July 2021
0.0201625923980499
0 references
Cette opération comprend une étude de faisabilité financière, une étude de prospection géologique et géotechnique, la construction d’un réseau bas de 7 298 m dans l’Union des paroisses de Cernadelo, São Miguel Lousada, Santa Margarida Lousada et Torno. Il comprend un composant élevé avec la construction de quatre interocepteurs à Cernadelo, Boim, Meinedo et Aparecida. (French)
7 December 2021
0 references
Diese Operation umfasst eine finanzielle Machbarkeitsstudie, eine geologische und geotechnische Prospektionsstudie, den Bau eines niedrigen Netzes mit 7 298 m in der Union der Pfarreien von Cernadelo, São Miguel Lousada, Santa Margarida Lousada und Torno. Es enthält eine hohe Komponente mit dem Bau von vier Interoceptoren in Cernadelo, Boim, Meinedo und Aparecida. (German)
15 December 2021
0 references
Deze operatie omvat een financiële haalbaarheidsstudie, een geologische en geotechnische prospectiestudie, de bouw van een laag netwerk met 7 298 m in de Unie van parochies Cernadelo, São Miguel Lousada, Santa Margarida Lousada en Torno. Het bevat een hoge component met de bouw van vier interoceptoren in Cernadelo, Boim, Meinedo en Aparecida. (Dutch)
20 December 2021
0 references
Questa operazione comprende uno studio di fattibilità finanziaria, uno studio di prospezione geologica e geotecnica, la costruzione di una rete bassa con 7 298 m nell'Unione delle parrocchie di Cernadelo, São Miguel Lousada, Santa Margarida Lousada e Torno. Comprende un'alta componente con la costruzione di quattro intercettori a Cernadelo, Boim, Meinedo e Aparecida. (Italian)
18 January 2022
0 references
Esta operación incluye un estudio de viabilidad financiera, un estudio de prospección geológica y geotécnica, la construcción de una red baja con 7 298 m en la Unión de parroquias de Cernadelo, São Miguel Lousada, Santa Margarida Lousada y Torno. Incluye un alto componente con la construcción de cuatro interoceptores en Cernadelo, Boim, Meinedo y Aparecida. (Spanish)
22 January 2022
0 references
See tegevus hõlmab rahalise elujõulisuse uuringut, geoloogiliste ja geotehniliste uuringute uuringut 7 298 m pikkuse madala võrgu ehitamise kohta Cernadelo, São Miguel Lousada, Santa Margarida Lousada ja Torno kihelkondade liidus. See sisaldab kõrget komponenti koos nelja interoceptori ehitusega Cernadelos, Boimis, Meinedos ja Aparecidas. (Estonian)
3 August 2022
0 references
Ši operacija apima finansinio gyvybingumo tyrimą, geologinių ir geotechninių perspektyvų statybą Cernadelo, San Miguel Lousada, Santa Margarida Lousada ir Torno parapijų sąjungoje su 7298 m. Jis apima aukštą komponentą su keturių interoceptorių statyba Cernadelo, Boim, Meinedo ir Aparecida. (Lithuanian)
3 August 2022
0 references
Ta operacija uključuje studiju o financijskoj održivosti, studiju geološkog i geotehničkog istraživanja izgradnje niske mreže sa 7 298 m u savezu župa Cernadelo, São Miguel Lousada, Santa Margarida Lousada i Torno. To uključuje visoku komponentu s izgradnjom četiri presretača u Cernadelo, Boim, Meinedo i Aparecida. (Croatian)
3 August 2022
0 references
Η επιχείρηση αυτή περιλαμβάνει μελέτη οικονομικής βιωσιμότητας, μελέτη γεωλογικής και γεωτεχνικής έρευνας για την κατασκευή χαμηλού δικτύου 7298 μέτρων στην Ένωση ενοριών Cernadelo, São Miguel Lousada, Santa Margarida Lousada και Torno. Περιλαμβάνει ένα υψηλό συστατικό με την κατασκευή τεσσάρων παρελκομένων σε Cernadelo, Boim, Meinedo και Aparecida. (Greek)
3 August 2022
0 references
Táto operácia zahŕňa štúdiu finančnej životaschopnosti, štúdiu geologického a geotechnického prieskumu výstavby nízkej siete 7 298 m v Únii farností Cernadelo, São Miguel Lousada, Santa Margarida Lousada a Torno. Obsahuje vysoký komponent s výstavbou štyroch zachytávačov v Cernadelo, Boim, Meinedo a Aparecida. (Slovak)
3 August 2022
0 references
Tähän toimeen sisältyy taloudellista elinkelpoisuutta koskeva tutkimus, geologinen ja geotekninen tutkimus, jossa tarkastellaan matalan verkon rakentamista 7298 metrin päähän Cernadelon, São Miguel Lousadan, Santa Margarida Lousadan ja Tornon seurakuntien unioniin. Se sisältää korkea komponentti rakentaminen neljä interoceptor Cernadelo, Boim, Meinedo ja Aparecida. (Finnish)
3 August 2022
0 references
Operacja ta obejmuje badanie rentowności finansowej, badanie geologicznego i geotechnicznego poszukiwania budowy małej sieci o długości 7 298 m w Unii parafii Cernadelo, São Miguel Lousada, Santa Margarida Lousada i Torno. Zawiera wysoki komponent z budową czterech przechwytujących w Cernadelo, Boim, Meinedo i Aparecida. (Polish)
3 August 2022
0 references
Ez a művelet magában foglalja a pénzügyi életképesség tanulmányozását, valamint a Cernadelo, São Miguel Lousada, Santa Margarida Lousada és Torno községek uniójában 7 298 m-es alacsony hálózat építésének geológiai és geotechnikai kutatását. Ez magában foglal egy nagy összetevőt az építési négy interoceptor Cernadelo, Boim, Meinedo és Aparecida. (Hungarian)
3 August 2022
0 references
Tato operace zahrnuje studii finanční životaschopnosti, studii geologického a geotechnického průzkumu výstavby nízké sítě s 7 298 m v Unii farností Cernadelo, São Miguel Lousada, Santa Margarida Lousada a Torno. Obsahuje vysokou součást s konstrukcí čtyř stíhačů v Cernadelo, Boim, Meinedo a Aparecida. (Czech)
3 August 2022
0 references
Šī darbība ietver pētījumu par finansiālo dzīvotspēju, pētījumu par ģeoloģisko un ģeotehnisko izpēti par zema tīkla būvniecību ar 7 298 m Cernadelo, São Miguel Lousada, Santa Margarida Lousada un Torno draudžu Savienībā. Tas ietver augstu komponentu ar četru krustotāju būvniecību Cernadelo, Boim, Meinedo un Aparecida. (Latvian)
3 August 2022
0 references
Áirítear leis an oibríocht seo staidéar ar inmharthanacht airgeadais, staidéar ar lorgaireacht gheolaíoch agus gheoiteicniúil chun líonra íseal a thógáil le 7 298 m in Aontas paróistí Cernadelo, São Miguel Lousada, Santa Margarida Lousada agus Torno. Cuimsíonn sé comhpháirt ard le tógáil ceithre interoceptors i Cernadelo, Boim, Meinedo agus Aparecida. (Irish)
3 August 2022
0 references
Ta operacija vključuje študijo finančne sposobnosti, študijo geološkega in geotehničnega raziskovanja gradnje nizkega omrežja z 7 298 m v Zvezi župnij Cernadelo, São Miguel Lousada, Santa Margarida Lousada in Torno. Vključuje visoko komponento z gradnjo štirih interoceptorjev v Cernadelu, Boimu, Meinedu in Aparecidi. (Slovenian)
3 August 2022
0 references
Тази операция включва проучване на финансовата жизнеспособност, проучване на геотехническите проучвания за изграждане на ниска мрежа със 7 298 m в Съюза на енориите Cernadelo, São Miguel Lousada, Santa Margarida Lousada и Torno. Той включва висок компонент с изграждането на четири интероцептора в Cernadelo, Boim, Meinedo и Aparecida. (Bulgarian)
3 August 2022
0 references
Din l-operazzjoni tinkludi studju tal-vijabbiltà finanzjarja, studju tal-prospettar ġeoloġiku u ġeotekniku tal-bini ta’ netwerk baxx b’7298 m fl-Unjoni tal-parroċċi ta’ Cernadelo, São Miguel Lousada, Santa Margarida Lousada u Torno. Dan jinkludi komponent għoli bil-kostruzzjoni ta’ erba’ interċettaturi f’Cernadelo, Boim, Meinedo u Aparecida. (Maltese)
3 August 2022
0 references
Denne operation omfatter en undersøgelse af finansiel levedygtighed, en undersøgelse af geologiske og geotekniske undersøgelser af opførelsen af et lavt net med 7298 mio. i Unionen af sogne i Cernadelo, São Miguel Lousada, Santa Margarida Lousada og Torno. Det omfatter en høj komponent med opførelsen af fire interoceptorer i Cernadelo, Boim, Meinedo og Aparecida. (Danish)
3 August 2022
0 references
Această operațiune include un studiu privind viabilitatea financiară, un studiu privind prospectarea geologică și geotehnică a construirii unei rețele scăzute cu 7 298 m în Uniunea parohiilor Cernadelo, São Miguel Lousada, Santa Margarida Lousada și Torno. Acesta include o componentă înaltă cu construcția a patru interoceptoare în Cernadelo, Boim, Meinedo și Aparecida. (Romanian)
3 August 2022
0 references
Denna transaktion omfattar en studie av den ekonomiska bärkraften, en studie av geologiska och geotekniska prospektering av byggandet av ett lågt nät med 7298 meter i unionen av församlingar i Cernadelo, São Miguel Lousada, Santa Margarida Lousada och Torno. Den innehåller en hög komponent med konstruktion av fyra interoceptorer i Cernadelo, Boim, Meinedo och Aparecida. (Swedish)
3 August 2022
0 references
Lousada
0 references
14 November 2023
0 references
Identifiers
POSEUR-03-2012-FC-000379
0 references