TMIP – Increasing capacity and process efficiency (Q2869462)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q2869462 in Portugal
Language Label Description Also known as
English
TMIP – Increasing capacity and process efficiency
Project Q2869462 in Portugal

    Statements

    0 references
    308,875.0 Euro
    0 references
    441,250.0 Euro
    0 references
    70.0 percent
    0 references
    10 January 2016
    0 references
    31 December 2017
    0 references
    TMIP - TRANSPORTES E LOGÍSTICA, LDA
    0 references
    0 references

    40°3'34.20"N, 8°37'35.00"W
    0 references
    A TMIP pretende tornar o terminal de Alfarelos um centro logístico de referência Nacional e catalisador na região Centro com ampliação do terminal e da férrea para uma de 750m e outra de 190m, com aquisição de Reach Stacker combi/piggyback (45 ton) e com introdução de softwares e georreferenciação. (Portuguese)
    0 references
    TMIP intends to make the Alfarelos terminal a national reference logistics center and catalyst in the Centro region with extension of the terminal and railroad to one of 750 m and another of 190 m, with acquisition of Reach Stacker combi/piggyback (45 ton) and with the introduction of software and georeferencing. (English)
    7 July 2021
    0.0203250700336345
    0 references
    TMIP a l’intention de faire du terminal d’Alfarelos un centre logistique national de référence et catalyseur dans la région Centro avec l’extension du terminal et du chemin de fer à 750 m et 190 m supplémentaires, avec l’acquisition de Reach Stacker combi/piggyback (45 tonnes) et avec introduction logicielle et géoréférencement. (French)
    4 December 2021
    0 references
    TMIP beabsichtigt, das Alfarelos Terminal zu einem nationalen Referenzlogistikzentrum und Katalysator in der Region Centro mit Erweiterung des Terminals und der Eisenbahn zu einem 750 m und weiteren 190 m zu machen, mit Erwerb von Reach Stacker combi/piggyback (45 ton) und mit Software-Einführung und Georeferenzierung. (German)
    13 December 2021
    0 references
    TMIP wil van de Alfarelos terminal een nationaal referentielogistiek centrum en katalysator in de regio Centro maken met uitbreiding van de terminal en spoorlijn tot 750 m en nog eens 190 m, met overname van Reach Stacker combi/piggyback (45 ton) en met software-introductie en georeferencing. (Dutch)
    18 December 2021
    0 references
    TMIP intende fare del terminal Alfarelos un centro logistico di riferimento nazionale e catalizzatore nella regione Centro con estensione del terminal e della ferrovia a 750 m e altri 190 m, con l'acquisizione di Reach Stacker combi/piggyback (45 ton) e con introduzione software e georeferenziazione. (Italian)
    17 January 2022
    0 references
    TMIP pretende hacer de la terminal Alfarelos un centro logístico de referencia nacional y catalizador en la región Centro con extensión de la terminal y ferrocarril a 750 m y otros 190 m, con la adquisición de Reach Stacker combi/piggyback (45 toneladas) y con introducción de software y georreferenciación. (Spanish)
    20 January 2022
    0 references
    TMIP kavatseb muuta Alfarelose terminali Centro piirkonna riiklikuks logistikakeskuseks ja katalüsaatoriks, laiendades terminali ja raudteed ühele 750 m ja teise 190 m kaugusele, koos Reach Stacker combi/piggyback’i omandamisega (45 tonni) ning tarkvara ja georeferencing kasutuselevõtuga. (Estonian)
    29 July 2022
    0 references
    TMIP ketina padaryti Alfarelos terminalą nacionaliniu etaloniniu logistikos centru ir katalizatoriumi Centro regione, išplečiant terminalą ir geležinkelį iki vieno iš 750 m, o kitą 190 m, įsigijus „Reach Stacker combi/piggyback“ (45 tonos) ir įdiegus programinę įrangą bei geografines nuorodas. (Lithuanian)
    29 July 2022
    0 references
    TMIP namjerava učiniti terminal Alfarelos nacionalnim referentnim logističkim centrom i katalizatorom u regiji Centro s proširenjem terminala i željeznice na jedan od 750 m, a drugi 190 m, s nabavom Reach Stacker combi/piggyback (45 tona) i uvođenjem softvera i georeferencinga. (Croatian)
    29 July 2022
    0 references
    Η TMIP σκοπεύει να καταστήσει τον τερματικό σταθμό Alfarelos εθνικό κέντρο εφοδιαστικής αναφοράς και καταλύτη στην περιοχή Centro με επέκταση του τερματικού σταθμού και του σιδηροδρόμου σε ένα από τα 750 μέτρα και ένα άλλο 190 m, με την αγορά του Reach Stacker combi/piggyback (45 τόνους) και με την εισαγωγή λογισμικού και γεωαναφοράς. (Greek)
    29 July 2022
    0 references
    TMIP plánuje vytvoriť z terminálu Alfarelos národné referenčné logistické centrum a katalyzátor v regióne Centro s rozšírením terminálu a železnice na jeden z 750 m a druhý 190 m, s nákupom Reach Stacker combi/piggyback (45 ton) a so zavedením softvéru a georeferencie. (Slovak)
    29 July 2022
    0 references
    TMIP aikoo tehdä Alfarelosin terminaalista kansallisen referenssilogistiikan keskuksen ja katalysaattorin Centron alueella laajentamalla terminaalin ja rautatien yhteen 750 metriin ja toiseen 190 metriin, hankkimalla Reach Stacker combi/piggyback (45 tonnia) ja ottamalla käyttöön ohjelmistot ja georeferencing. (Finnish)
    29 July 2022
    0 references
    TMIP zamierza uczynić terminal Alfarelos krajowym referencyjnym centrum logistycznym i katalizatorem w regionie Centro z rozbudową terminalu i kolei do jednego z 750 m, a drugi 190 m, z nabyciem Reach Stacker combi/piggyback (45 ton) oraz z wprowadzeniem oprogramowania i georeferencji. (Polish)
    29 July 2022
    0 references
    A TMIP célja, hogy az Alfarelos terminált nemzeti referencia logisztikai központtá és katalizátorsá tegye a Centro régióban, a terminál és a vasút 750 m-re és egy másik 190 m-re való kiterjesztésével, a Reach Stacker combi/piggyback (45 tonna) megvásárlásával, valamint szoftver és georeferencia bevezetésével. (Hungarian)
    29 July 2022
    0 references
    Společnost TMIP má v úmyslu učinit terminál Alfarelos národním referenčním logistickým centrem a katalyzátorem v regionu Centro s rozšířením terminálu a železnice na 750 m a další na 190 m, s akvizicí společnosti Reach Stacker combi/piggyback (45 tun) a se zavedením softwaru a georeferencí. (Czech)
    29 July 2022
    0 references
    TMIP plāno padarīt Alfarelos termināli par valsts references loģistikas centru un katalizatoru Centro reģionā ar termināļa un dzelzceļa paplašināšanu līdz vienam no 750 m un vēl 190 m, iegādājoties Reach Stacker combi/piggyback (45 tonnas) un ieviešot programmatūru un ģeoatsauces. (Latvian)
    29 July 2022
    0 references
    Tá sé i gceist ag TMIP ionad lóistíochta tagartha náisiúnta agus catalaíoch a dhéanamh den chríochfort Alfarelos i réigiún Centro le síneadh ar an gcríochfort agus ar an iarnród go dtí ceann de 750 m agus ceann eile de 190 m, le fáil Reach Stacker combi/piggyback (45 ton) agus le bogearraí agus geore tagairt a thabhairt isteach. (Irish)
    29 July 2022
    0 references
    TMIP namerava narediti terminal Alfarelos nacionalni referenčni logistični center in katalizator v regiji Centro s podaljšanjem terminala in železnice na enega od 750 m in drugega 190 m, s pridobitvijo Reach Stacker combi/piggyback (45 ton) ter z uvedbo programske opreme in georeferenciranja. (Slovenian)
    29 July 2022
    0 references
    TMIP възнамерява да превърне терминала в Алфарелос в национален референтен логистичен център и катализатор в района на Centro с разширяване на терминала и железницата до 750 m и още 190 m, с придобиване на Reach Stacker combi/piggyback (45 тона) и с въвеждането на софтуер и геореференции. (Bulgarian)
    29 July 2022
    0 references
    It-TMIP għandu l-ħsieb li jagħmel it-terminal ta’ Alfarelos ċentru nazzjonali ta’ loġistika ta’ referenza u katalist fir-reġjun ta’ Centro bl-estensjoni tat-terminal u t-triq ferrovjarja għal wieħed ta’ 750 m u ieħor ta’ 190 m, bl-akkwist ta’ Reach Stacker combi/piggyback (45 tunnellata) u bl-introduzzjoni ta’ softwer u ġeoreferenzjar. (Maltese)
    29 July 2022
    0 references
    TMIP har til hensigt at gøre Alfarelos-terminalen til et nationalt referencelogistikcenter og katalysator i Centro-regionen med udvidelse af terminalen og jernbanen til en af 750 m og en anden på 190 m, med opkøb af Reach Stacker combi/piggyback (45 ton) og med indførelsen af software og georeferencer. (Danish)
    29 July 2022
    0 references
    TMIP intenționează să transforme terminalul Alfarelos într-un centru logistic național de referință și catalizator în regiunea Centro, cu extinderea terminalului și a căii ferate la unul din 750 m și altul de 190 m, cu achiziționarea Reach Stacker combi/piggyback (45 tone) și cu introducerea de software și georeferențiere. (Romanian)
    29 July 2022
    0 references
    TMIP avser att göra Alfarelos terminal till ett nationellt referenslogistikcentrum och katalysator i Centroregionen med utbyggnad av terminalen och järnvägen till en av 750 m och en annan på 190 m, med förvärv av Reach Stacker combi/piggyback (45 ton) och med införande av programvara och georeferenser. (Swedish)
    29 July 2022
    0 references
    Soure
    0 references
    23 May 2023
    0 references

    Identifiers

    CENTRO-02-0853-FEDER-023823
    0 references