Improvement of Urban Mobility and Road Safety in the Municipality of Reguengos de Monsaraz: Requalification and Modernisation of Pedonal Ways in the City of Reguengos de Monsaraz – 1st Phase (Q2863249)
Jump to navigation
Jump to search
Project Q2863249 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of Urban Mobility and Road Safety in the Municipality of Reguengos de Monsaraz: Requalification and Modernisation of Pedonal Ways in the City of Reguengos de Monsaraz – 1st Phase |
Project Q2863249 in Portugal |
Statements
111,124.31 Euro
0 references
130,734.48 Euro
0 references
85.0 percent
0 references
31 July 2018
0 references
30 April 2019
0 references
MUNICÍPIO DE REGUENGOS DE MONSARAZ
0 references
Assim o projeto da "Requalificação e Modernização das Vias Pedonais na Cidade de Reguengos de Monsaraz - 1ª Fase" consistirá na requalificação/ substituição da rede de abastecimento de água das Ruas 1ª de maio e Rua de Évora e na requalificação e no redesenhar das vias de circulação rodoviária e pedonal das referidas ruas. (Portuguese)
0 references
Thus the project of “Requalification and Modernisation of Pedonal Ways in the City of Reguengos de Monsaraz – 1st Phase” will consist of the requalification/replacement of the water supply network of the 1st of May and Rua de Évora and the redesign and redesign of the road and pedestrian roads of these streets. (English)
6 July 2021
0.0308562840248027
0 references
Ainsi, le projet de «Requalification et modernisation des passerelles dans la ville de Reguengos de Monsaraz — Phase 1» consistera en la requalification/remplacement du réseau d’adduction d’eau des rues 1er mai et Rua de Évora et la requalification et la refonte de la route et des routes piétonnes de ces rues. (French)
4 December 2021
0 references
So wird das Projekt der „Requalifikation und Modernisierung der Wanderwege in der Stadt Reguengos de Monsaraz – Stufe 1“ in der Neuqualifizierung/Ersetzung des Wasserversorgungsnetzes der Straßen 1. Mai und Rua de Évora sowie der Neuqualifizierung und Neugestaltung der Straßen- und Fußgängerstraßen dieser Straßen bestehen. (German)
13 December 2021
0 references
Zo zal het project van de „Herkwalificatie en modernisering van de loopbruggen in de stad Reguengos de Monsaraz — Stage 1” bestaan uit de herkwalificatie/vervanging van het waterleidingnet van de straten 1 mei en Rua de Évora en de herkwalificatie en herinrichting van de weg- en voetgangerswegen van die straten. (Dutch)
18 December 2021
0 references
Così, il progetto della "Riqualificazione e ammodernamento dei passerelle nella città di Reguengos de Monsaraz — Fase 1" consisterà nella riqualificazione/sostituzione della rete di approvvigionamento idrico delle strade 1º maggio e Rua de Évora e nella riqualificazione e riprogettazione delle strade stradali e pedonali di tali strade. (Italian)
17 January 2022
0 references
Así, el proyecto de la «Recalificación y modernización de las pasarelas en la ciudad de Reguengos de Monsaraz — Etapa 1» consistirá en la recalificación/sustitución de la red de abastecimiento de agua de las calles 1 de mayo y Rua de Évora y la recalificación y rediseño de la carretera y los caminos peatonales de esas calles. (Spanish)
20 January 2022
0 references
Seega projekt „Rekvalifitseerimine ja moderniseerimine Pedonal Ways linna Reguengos de Monsaraz – 1. etapp“ koosneb ümberkvalifitseerimine/asendamine veevarustusvõrgu 1. mai ja Rua de Évora ning ümberkujundamine ja ümberkujundamine teede ja jalakäijate teed nendel tänavatel. (Estonian)
29 July 2022
0 references
Taigi „Pedonal Ways perkvalifikavimas ir modernizavimas Reguengos de Monsaraz mieste – 1 etapas“ – tai gegužės 1 d. ir Rua de Évora vandens tiekimo tinklo perkvalifikavimas/pakeitimas, taip pat šių gatvių kelių ir pėsčiųjų kelių pertvarkymas ir pertvarkymas. (Lithuanian)
29 July 2022
0 references
Tako će se projekt „Rekvalifikacija i modernizacija pješačkih putova u gradu Reguengos de Monsaraz – 1. faza” sastojati od rekvalifikacije/zamjene vodoopskrbne mreže 1. svibnja i Rue de Évora te redizajniranja i redizajniranja cestovnih i pješačkih cesta tih ulica. (Croatian)
29 July 2022
0 references
Έτσι, το έργο «Επανάληψη και Εκσυγχρονισμός των Πεδονικών Δρόμων στην Πόλη του Reguengos de Monsaraz — 1η Φάση» θα συνίσταται στην αναβάθμιση/αντικατάσταση του δικτύου ύδρευσης της 1ης Μαΐου και της Rua de Évora και στον επανασχεδιασμό και τον επανασχεδιασμό των οδών και των πεζοδρομίων αυτών των δρόμων. (Greek)
29 July 2022
0 references
Projekt „Rekvalifikácia a modernizácia pedonálnych ciest v meste Reguengos de Monsaraz – 1. fáza“ bude pozostávať z rekvalifikácie/nahradenia vodovodnej siete 1. mája a Rua de Évora a z prepracovania a prestavby ciest a peších ciest na týchto uliciach. (Slovak)
29 July 2022
0 references
Näin ollen hanke ”Requalification and Modernisation of pedonal Ways in the City of Reguengos de Monsaraz – 1st Phase” koostuu 1. toukokuuta ja Rua de Évoran vesihuoltoverkoston uudistamisesta ja korvaamisesta sekä näiden katujen tie- ja jalankulkuteiden uudelleensuunnittelusta ja uudelleensuunnittelusta. (Finnish)
29 July 2022
0 references
W związku z tym projekt „Requalification and Modernisation of pedonal Ways in the City of Reguengos de Monsaraz – I etap” będzie polegał na przekwalifikowaniu/wymiana sieci wodociągowej 1 maja i Rua de Évora oraz przeprojektowaniu i przeprojektowaniu dróg i pieszych dróg tych ulic. (Polish)
29 July 2022
0 references
Így a „Requalification and Modernisation of pedonal Ways in the City of Reguengos de Monsaraz – 1. szakasz” projekt a május 1-jei és a Rua de Évora vízellátó hálózat átminősítéséből/helyettesítéséből, valamint ezen utcák útjainak és gyalogos útjainak újratervezéséből és átalakításából áll. (Hungarian)
29 July 2022
0 references
Projekt „Rekvalifikace a modernizace pedonálních cest ve městě Reguengos de Monsaraz – 1. fáze“ tak bude spočívat v rekvalifikaci/nahrazování vodovodní sítě 1. května a Rua de Évora a v redesignu a přestavbě silnic a chodců těchto ulic. (Czech)
29 July 2022
0 references
Tādējādi projekts “Pedonālo ceļu pārkvalificēšana un modernizācija Reguengos de Monsaraz pilsētā — 1. posms” sastāvēs no 1. maija un Rua de Évora ūdensapgādes tīkla pārkvalificēšanas/nomainīšanas, kā arī šo ielu ceļu un gājēju ceļu pārprojektēšanas un pārprojektēšanas. (Latvian)
29 July 2022
0 references
Dá bhrí sin, is éard a bheidh sa tionscadal “Athcháiliú agus Nuachóiriú Bealaí Pedonal i gCathair Reguengos de Monsaraz — 1d Céim” athcháiliú/athsholáthar líonra soláthair uisce an 1 Bealtaine agus Rua de Évora agus athdhearadh agus athdhearadh bóithre bóthair agus bóithre coisithe na sráideanna seo. (Irish)
29 July 2022
0 references
Tako bo projekt „Prekvalifikacija in posodobitev pedonalnih poti v mestu Reguengos de Monsaraz – 1. faza“ vključeval prekvalifikacijo/nadomestitev vodovodnega omrežja 1. maja in Rua de Évora ter preoblikovanje in preoblikovanje cest in pešcev na teh ulicah. (Slovenian)
29 July 2022
0 references
По този начин проектът „Преквалификация и модернизация на педоналните пътища в град Reguengos de Monsaraz — 1-ва фаза“ ще се състои от преквалифициране/замяна на водоснабдителната мрежа на 1 май и Rua de Évora и препроектиране и препроектиране на пътищата и пешеходните пътища по тези улици. (Bulgarian)
29 July 2022
0 references
B’hekk il-proġett ta’ “Requalification and Modernisation of pedonal Ways in the City of Reguengos de Monsaraz — l-Ewwel Fażi” se jikkonsisti fir-rikwalifikazzjoni/is-sostituzzjoni tan-netwerk tal-provvista tal-ilma tal-1 ta’ Mejju u Rua de Évora u d-disinn mill-ġdid u d-disinn mill-ġdid tat-toroq u t-toroq pedonali ta’ dawn it-toroq. (Maltese)
29 July 2022
0 references
Således vil projektet "Omkvalificering og modernisering af pedonal Ways in the City of Reguengos de Monsaraz — 1. fase" bestå af omkvalificering/udskiftning af vandforsyningsnettet i 1. maj og Rua de Évora og redesign og omdesign af vejene og gågaderne i disse gader. (Danish)
29 July 2022
0 references
Astfel, proiectul „Recalificarea și modernizarea căilor pedonale în orașul Reguengos de Monsaraz – prima fază” va consta în recalificarea/înlocuirea rețelei de alimentare cu apă din 1 mai și Rua de Évora și reproiectarea și reproiectarea drumurilor și drumurilor pietonale ale acestor străzi. (Romanian)
29 July 2022
0 references
Projektet ”Requalification and Modernisation of pedonal Ways in the City of Reguengos de Monsaraz – 1:a fasen” kommer att bestå av omkvalificering/ersättning av vattenförsörjningsnätet från den 1 maj och Rua de Évora och omformulering och ombyggnad av vägar och gångvägar på dessa gator. (Swedish)
29 July 2022
0 references
Reguengos de Monsaraz
0 references
14 November 2023
0 references
Identifiers
ALT20-04-1406-FEDER-000016
0 references