ENTERPRISE ENERGY EFFICIENCY 32 (Q2462358)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q2462358 in Italy
Language Label Description Also known as
English
ENTERPRISE ENERGY EFFICIENCY 32
Project Q2462358 in Italy

    Statements

    0 references
    131,250.0 Euro
    0 references
    175,000.0 Euro
    0 references
    75.0 percent
    0 references
    22 October 2018
    0 references
    31 December 2020
    0 references
    DAKEN S.P.A.
    0 references
    0 references

    40°40'6.67"N, 16°36'5.72"E
    0 references
    L'AZIENDA CANDIDA UN PROGETTO DI INVESTIMENTO CON IL FINE DI EFFICIENTARE IL PROCESSO PRODUTTIVO ATTRAVERSO L'INSTALLAZIONE DI UN IMPIANTO DA FONTI RINNOVABILI (FOTOVOLTAICO) DA 358 KWP ED ANCHE LA SOSTITUZIONE (RELAMPING)DEGLI 85 CORPI ILLUMINANTI ESISTENTI NELL'OPIFICIO INDUSTRIALE CON CORPI ILLUMINANTI A LED. (Italian)
    0 references
    THE COMPANY APPLIED FOR AN INVESTMENT PROJECT IN ORDER TO MAKE THE PRODUCTION PROCESS MORE EFFICIENT THROUGH THE INSTALLATION OF A RENEWABLE (SOLAR POWER PLANT) INSTALLATION FROM 358 KWP AND ALSO THE REPLACEMENT (RELAMING) OF THE 85 EXISTING FLARES IN THE INDUSTRIAL PLANT WITH LED LIGHTS. (English)
    0 references
    L’ENTREPRISE PROPOSE UN PROJET D’INVESTISSEMENT DANS LE BUT D’AMÉLIORER LE PROCESSUS DE PRODUCTION PAR L’INSTALLATION D’UNE INSTALLATION DE 358 KWP RENOUVELABLE (PHOTOVOLTAÏQUE) AINSI QUE LE REMPLACEMENT (RELAMPING) DES 85 APPAREILS D’ÉCLAIRAGE EXISTANTS DANS L’OPIFICIO INDUSTRIEL PAR DES LUMINAIRES À LED. (French)
    4 January 2022
    0 references
    DAS UNTERNEHMEN SCHLÄGT EIN INVESTITIONSVORHABEN VOR, MIT DEM ZIEL, DEN PRODUKTIONSPROZESS DURCH DEN EINBAU EINER 358 KWP ERNEUERBAREN (PHOTOVOLTAIK)-ANLAGE SOWIE DURCH DEN ERSATZ (RELAMPING) DER 85 VORHANDENEN LEUCHTEN IM INDUSTRIELLEN OPIFICIO DURCH LED-BELEUCHTUNG ZU VERBESSERN. (German)
    10 January 2022
    0 references
    HET BEDRIJF STELT EEN INVESTERINGSPROJECT VOOR OM HET PRODUCTIEPROCES TE VERBETEREN DOOR DE INSTALLATIE VAN EEN 358 KWP HERNIEUWBARE (FOTOVOLTAÏSCHE) INSTALLATIE EN OOK DE VERVANGING (HERLAMPING) VAN DE 85 BESTAANDE VERLICHTINGSARMATUREN IN DE INDUSTRIËLE OPIFICIO DOOR LED-VERLICHTINGSARMATUREN. (Dutch)
    12 January 2022
    0 references
    LA EMPRESA PROPONE UN PROYECTO DE INVERSIÓN CON EL OBJETIVO DE MEJORAR EL PROCESO DE PRODUCCIÓN MEDIANTE LA INSTALACIÓN DE UNA PLANTA RENOVABLE DE 358 KWP (FOTOVOLTAICA) Y LA SUSTITUCIÓN (RELAMPING) DE LOS 85 DISPOSITIVOS DE ILUMINACIÓN EXISTENTES EN LA OPIFICIO INDUSTRIAL CON DISPOSITIVOS DE ILUMINACIÓN LED. (Spanish)
    27 January 2022
    0 references
    VIRKSOMHEDEN ANSØGTE OM ET INVESTERINGSPROJEKT FOR AT GØRE PRODUKTIONSPROCESSEN MERE EFFEKTIV GENNEM INSTALLATION AF ET VEDVARENDE (SOLKRAFTVÆRK) ANLÆG FRA 358 KWP OG OGSÅ UDSKIFTNING (RELAMING) AF DE 85 EKSISTERENDE FLARES I INDUSTRIANLÆGGET MED LED-LYS. (Danish)
    10 July 2022
    0 references
    Η ΕΤΑΙΡΕΊΑ ΥΠΈΒΑΛΕ ΑΊΤΗΣΗ ΓΙΑ ΕΠΕΝΔΥΤΙΚΌ ΈΡΓΟ ΠΡΟΚΕΙΜΈΝΟΥ Η ΠΑΡΑΓΩΓΙΚΉ ΔΙΑΔΙΚΑΣΊΑ ΝΑ ΚΑΤΑΣΤΕΊ ΑΠΟΤΕΛΕΣΜΑΤΙΚΌΤΕΡΗ ΜΈΣΩ ΤΗΣ ΕΓΚΑΤΆΣΤΑΣΗΣ ΑΝΑΝΕΏΣΙΜΗΣ (ΜΟΝΆΔΑΣ ΗΛΙΑΚΉΣ ΕΝΈΡΓΕΙΑΣ) ΕΓΚΑΤΆΣΤΑΣΗΣ ΑΠΌ 358 KWP, ΚΑΘΏΣ ΚΑΙ ΤΗΣ ΑΝΤΙΚΑΤΆΣΤΑΣΗΣ (RELAMING) ΤΩΝ 85 ΥΦΙΣΤΆΜΕΝΩΝ ΦΩΤΟΒΟΛΊΔΩΝ ΣΤΗ ΒΙΟΜΗΧΑΝΙΚΉ ΜΟΝΆΔΑ ΜΕ ΛΥΧΝΊΕΣ. (Greek)
    10 July 2022
    0 references
    TVRTKA SE PRIJAVILA ZA INVESTICIJSKI PROJEKT KAKO BI PROIZVODNI PROCES BIO UČINKOVITIJI UGRADNJOM POSTROJENJA IZ OBNOVLJIVIH IZVORA (SOLARNE ELEKTRANE) OD 358 KWP TE ZAMJENOM (RELAMING) 85 POSTOJEĆIH BAKLJI U INDUSTRIJSKOM POSTROJENJU S LED SVJETLIMA. (Croatian)
    10 July 2022
    0 references
    COMPANIA A SOLICITAT UN PROIECT DE INVESTIȚII PENTRU A EFICIENTIZA PROCESUL DE PRODUCȚIE PRIN INSTALAREA UNEI INSTALAȚII DE ENERGIE REGENERABILĂ (CENTRALĂ SOLARĂ) DE LA 358 KWP ȘI, DE ASEMENEA, PRIN ÎNLOCUIREA (RELAMING) A CELOR 85 DE RACHETE DE SEMNALIZARE EXISTENTE ÎN INSTALAȚIA INDUSTRIALĂ CU LED-URI. (Romanian)
    10 July 2022
    0 references
    SPOLOČNOSŤ POŽIADALA O INVESTIČNÝ PROJEKT S CIEĽOM ZEFEKTÍVNIŤ VÝROBNÝ PROCES INŠTALÁCIOU ZARIADENIA Z OBNOVITEĽNÝCH ZDROJOV (SOLÁRNA ELEKTRÁREŇ) S VÝKONOM 358 KWP A TIEŽ VÝMENOU (RELAMING) 85 EXISTUJÚCICH SVETIEL V PRIEMYSELNOM ZÁVODE ZA LED SVETLÁ. (Slovak)
    10 July 2022
    0 references
    IL-KUMPANIJA APPLIKAT GĦAL PROĠETT TA’ INVESTIMENT SABIEX TAGĦMEL IL-PROĊESS TAL-PRODUZZJONI AKTAR EFFIĊJENTI PERMEZZ TAL-INSTALLAZZJONI TA’ INSTALLAZZJONI RINNOVABBLI (IMPJANT TAL-ENERĠIJA SOLARI) MINN 358 KWP KIF UKOLL IS-SOSTITUZZJONI (RELAMING) TAL-85 FLARE EŻISTENTI FL-IMPJANT INDUSTRIJALI BID-DWAL TAL-LED. (Maltese)
    10 July 2022
    0 references
    A EMPRESA SOLICITOU UM PROJETO DE INVESTIMENTO A FIM DE TORNAR O PROCESSO DE PRODUÇÃO MAIS EFICIENTE ATRAVÉS DA INSTALAÇÃO DE UMA INSTALAÇÃO RENOVÁVEL (CENTRAL SOLAR) A PARTIR DE 358 KWP E TAMBÉM DA SUBSTITUIÇÃO (RELAMING) DAS 85 QUEIMADAS EXISTENTES NA PLANTA INDUSTRIAL COM LUZES LED. (Portuguese)
    10 July 2022
    0 references
    YHTIÖ HAKI INVESTOINTIHANKETTA TUOTANTOPROSESSIN TEHOSTAMISEKSI ASENTAMALLA UUSIUTUVAN (AURINKOVOIMALAITOKSEN) 358 KWP:STA JA KORVAAMALLA (RELAMING) TEOLLISUUSLAITOKSEN NYKYISET 85 SOIHTUA LED-VALOILLA. (Finnish)
    10 July 2022
    0 references
    PRZEDSIĘBIORSTWO ZŁOŻYŁO WNIOSEK O PROJEKT INWESTYCYJNY W CELU ZWIĘKSZENIA EFEKTYWNOŚCI PROCESU PRODUKCYJNEGO POPRZEZ ZAINSTALOWANIE INSTALACJI ZE ŹRÓDEŁ ODNAWIALNYCH (ENERGIA SŁONECZNA) O MOCY 358 KWP, A TAKŻE WYMIANĘ (RELAMING) 85 ISTNIEJĄCYCH POCHODNI W ZAKŁADZIE PRZEMYSŁOWYM ZA POMOCĄ LAMP LEDOWYCH. (Polish)
    10 July 2022
    0 references
    PODJETJE SE JE PRIJAVILO ZA NALOŽBENI PROJEKT, DA BI BIL PROIZVODNI PROCES UČINKOVITEJŠI Z NAMESTITVIJO OBNOVLJIVE (SONČNE ELEKTRARNE) 358 KWP IN ZAMENJAVO (RELAMING) 85 OBSTOJEČIH RAKET V INDUSTRIJSKEM OBRATU Z LED LUČMI. (Slovenian)
    10 July 2022
    0 references
    SPOLEČNOST POŽÁDALA O INVESTIČNÍ PROJEKT S CÍLEM ZEFEKTIVNIT VÝROBNÍ PROCES INSTALACÍ OBNOVITELNÉ (SOLÁRNÍ ELEKTRÁRNY) Z 358 KWP A TAKÉ NAHRAZENÍM (RELAMING) 85 STÁVAJÍCÍCH SVĚTLIC V PRŮMYSLOVÉM ZÁVODĚ LED OSVĚTLENÍM. (Czech)
    10 July 2022
    0 references
    BENDROVĖ PATEIKĖ PARAIŠKĄ INVESTICINIAM PROJEKTUI, KAD GAMYBOS PROCESAS TAPTŲ EFEKTYVESNIS, ĮRENGIANT ATSINAUJINANČIŲJŲ IŠTEKLIŲ (SAULĖS JĖGAINĖS) ĮRENGINĮ NUO 358 KWP IR TAIP PAT PAKEIČIANT (RELAMING) PRAMONINĖJE GAMYKLOJE ESANČIAS 85 FAKELŲ LEMPAS. (Lithuanian)
    10 July 2022
    0 references
    UZŅĒMUMS PIETEICĀS IEGULDĪJUMU PROJEKTAM, LAI PADARĪTU RAŽOŠANAS PROCESU EFEKTĪVĀKU, UZSTĀDOT ATJAUNOJAMO ENERGORESURSU (SAULES SPĒKSTACIJAS) IEKĀRTU NO 358 KWP, KĀ ARĪ AIZSTĀJOT (RELAMING) 85 LĀPAS RŪPNIECĪBAS RŪPNĪCĀ AR LED GAISMĀM. (Latvian)
    10 July 2022
    0 references
    ДРУЖЕСТВОТО Е КАНДИДАТСТВАЛО ЗА ИНВЕСТИЦИОНЕН ПРОЕКТ, ЗА ДА НАПРАВИ ПРОИЗВОДСТВЕНИЯ ПРОЦЕС ПО-ЕФЕКТИВЕН ЧРЕЗ ИНСТАЛИРАНЕТО НА ВЪЗОБНОВЯЕМА (СЛЪНЧЕВА ЕЛЕКТРОЦЕНТРАЛА) ИНСТАЛАЦИЯ ОТ 358 KWP, КАКТО И ЗАМЯНАТА (RELAMING) НА 85-ТЕ СЪЩЕСТВУВАЩИ ИЗРИГВАНИЯ В ПРОМИШЛЕНАТА ЦЕНТРАЛА С LED СВЕТЛИНИ. (Bulgarian)
    10 July 2022
    0 references
    A VÁLLALAT BERUHÁZÁSI PROJEKTRE PÁLYÁZOTT ANNAK ÉRDEKÉBEN, HOGY A TERMELÉSI FOLYAMAT HATÉKONYABBÁ VÁLJON EGY 358 KWP-OS MEGÚJULÓ (NAPERŐMŰ) LÉTESÍTMÉNY TELEPÍTÉSÉVEL, VALAMINT AZ IPARI ÜZEM 85 MEGLÉVŐ FÁKLYÁJÁNAK LED-ES LÁMPÁKKAL TÖRTÉNŐ CSERÉJÉVEL (RELAMING). (Hungarian)
    10 July 2022
    0 references
    RINNE AN CHUIDEACHTA IARRATAS AR THIONSCADAL INFHEISTÍOCHTA CHUN AN PRÓISEAS TÁIRGTHE A DHÉANAMH NÍOS ÉIFEACHTÚLA TRÍ SHUITEÁIL IN-ATHNUAITE (GLÉASRA CUMHACHTA GRÉINE) A SHUITEÁIL Ó 358 KWP AGUS ATHSHOLÁTHAR (RELAMING) NA MBLADHMANNA 85 ATÁ ANN CHEANA SA GHLÉASRA TIONSCLAÍOCH LE SOILSE FAOI STIÚIR. (Irish)
    10 July 2022
    0 references
    FÖRETAGET ANSÖKTE OM ETT INVESTERINGSPROJEKT FÖR ATT GÖRA PRODUKTIONSPROCESSEN MER EFFEKTIV GENOM INSTALLATION AV EN FÖRNYBAR (SOLKRAFTVERK) INSTALLATION FRÅN 358 KWP OCH ÄVEN ERSÄTTNING (RELAMING) AV DE 85 BEFINTLIGA FACKLORNA I INDUSTRIANLÄGGNINGEN MED LED-LAMPOR. (Swedish)
    10 July 2022
    0 references
    ETTEVÕTE TAOTLES INVESTEERIMISPROJEKTI, ET MUUTA TOOTMISPROTSESS TÕHUSAMAKS, PAIGALDADES 358 KWP-GA TAASTUVELEKTRIJAAMA (PÄIKESEELEKTRIJAAM) JA ASENDADES TÖÖSTUSETTEVÕTTES LED-VALGUSTITEGA 85 OLEMASOLEVA TÕRVIKPÕLETI (RELAMING). (Estonian)
    10 July 2022
    0 references
    MATERA
    0 references

    Identifiers

    F16F18000040006
    0 references