Project Q2056961 in Italy
Language Label Description Also known as
English
(10360.14072017.115000039) ENERGY EFFICIENCY IN PRIMARY SCHOOL
Project Q2056961 in Italy

    Statements

    0 references
    48,081.93 Euro
    0 references
    161,580.15 Euro
    0 references
    29.76 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    30 March 2020
    0 references
    COMUNE DI MONTE SAN SAVINO
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INTERVENTO 1: ISOLAMENTO TERMICO DI STRUTTURE ORIZZONTALI E VERTICALI: I LAVORI, IN DETTAGLIO, TRATTANO LA REALIZZAZIONE DELLA COIBENTAZIONE TERMICA DEI LOCALI SOTTOTETTI ESISTENTI ATTRAVERSO L?APPOSIZIONE, DIRETTAMENTE SUL SOLAIO PIANO DI CALPESTIO, DI N. 2 STRATI DI FELTRO IN LANA DI VETRO A ROTOLI DI SPESSORE MM. 100 PER ARRIVARE A FORMARE UN PACCHETTO TOTALE DI COIBENTAZIONE DI ALTEZZA MM. 200.INTERVENTO 2: SOSTITUZIONE DI SERRAMENTI E INFISSI: I LAVORI, IN DETTAGLIO, TRATTANO DI SMONTARE GLI INFISSI ESISTENTI IN FERRO A TAGLIO FREDDO E VETRI SINGOLI, ORMAI FATISCENTI, ED INSTALLARNE DEI NUOVI DI SOLITA FORMA E DIMENSIONI MA REALIZZATI IN P.V.C. CON PROFILI ESTRUSI DA MM. 70 CERTIFICATI A NORMA DI LEGGE CON TRASMITTANZA GENERALE (PROFILI + VETRI) PARI AD UW = 1,30 W/MQ?K.INTERVENTO 3: SOSTITUZIONE DI IMPIANTI DI CLIMATIZZAZIONE: I LAVORI, IN DETTAGLIO, TRATTANO DEL RIFACIMENTO COMPLETO DEGLI IMPIANTI ESISTENTI DELLA CENTRALE TERMICA A SERVIZIO DEL PLESSO SCOLASTICO CON RELATIVA SOS (Italian)
    0 references
    ACTION 1: THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES: THE WORKS, IN DETAIL, DEAL WITH THE CONSTRUCTION OF THE THERMAL INSULATION OF THE EXISTING SUB-FLOORS BY MEANS OF L? AFFIXING, DIRECTLY TO THE FLOOR OF THE BOTTOM OF N. 2 LAYERS OF FELT, IN GLASS WOOL, IN ROLLS OF A THICKNESS OF MM. 100 FOR THE PURPOSE OF FORMING A TOTAL MM. INSULATION PACKAGE 200.INTERVENTION 2: REPLACEMENT OF WINDOW FRAMES AND FRAMES: THIS WORK, IN DETAIL, ADDRESSES THE DISMANTLING OF THE EXISTING FIXTURES IN COLD IRON AND SINGLE WINDOWS, WHICH ARE NOW DILAPIDATED, AND INSTALLING NEW GROOVES IN THE SHAPE AND DIMENSIONS BUT PRODUCED IN SECTIONS EXTRUDED BY MM. 70 LEGALLY CERTIFICATED WITH GENERAL TRANSMITTANCE (PROFILES + GLASSES) EQUAL TO UW = 1,30 W/SQM? K.INTERVENTO 3: REPLACEMENT OF AIR-CONDITIONING SYSTEMS: THE WORK, IN DETAIL, DEALS WITH THE COMPLETE REFURBISHMENT OF THE EXISTING PLANTS OF THE HEATING PLANT AT THE SCHOOL HEATING PLANT WITH A RELATED SOS. (English)
    0 references
    ACTION 1: ISOLATION THERMIQUE DES STRUCTURES HORIZONTALES ET VERTICALES: LES TRAVAUX, EN DÉTAIL, TRAITENT DE LA RÉALISATION DE L’ISOLATION THERMIQUE DES LOCAUX GRENIERS EXISTANTS PAR L’APPOSITION, DIRECTEMENT SUR LE SOL, DE 2 COUCHES DE FEUTRE EN LAINE DE VERRE EN ROULEAUX D’ÉPAISSEUR MM. 100 POUR OBTENIR POUR FORMER UN ENSEMBLE TOTAL D’ISOLATION DE LA HAUTEUR MM. 200.INTERVENT 2: REMPLACEMENT DES FENÊTRES ET DES LUMINAIRES: LES TRAVAUX, EN DÉTAIL, TRAITENT DE DÉMONTER LES LUMINAIRES EXISTANTS EN FER COUPÉ À FROID ET EN VERRE SIMPLE, AUJOURD’HUI S’EFFONDRER, ET D’INSTALLER DE NOUVEAUX MONTAGES DE FORME ET DE DIMENSIONS HABITUELLES MAIS EN P.V.C. AVEC DES PROFILÉS EXTRUDÉS PAR MM. 70 CERTIFICATS SELON LA LOI AVEC TRANSMISSION GÉNÉRALE (PROFILS + LUNETTES) ÉGALE À UW = 1,30 W/M²?K.INTERVENTO 3: REMPLACEMENT DES SYSTÈMES DE CLIMATISATION: LES TRAVAUX, EN DÉTAIL, TRAITENT DE LA REMISE EN ÉTAT COMPLÈTE DES INSTALLATIONS EXISTANTES DE LA CENTRALE THERMIQUE DESSERVANT LE PLEXUS SCOLAIRE ET SOS CONNEXE (French)
    16 December 2021
    0 references
    ACTIE 1: THERMISCHE ISOLATIE VAN HORIZONTALE EN VERTICALE CONSTRUCTIES: DE WERKEN, IN DETAIL, GAAN OVER DE REALISATIE VAN DE THERMISCHE ISOLATIE VAN DE BESTAANDE ZOLDERKAMERS DOOR MIDDEL VAN HET AANBRENGEN, DIRECT OP DE VLOER, VAN 2 LAGEN VILT GEMAAKT VAN GLASWOL OP ROLLEN VAN MM DIKTE. 100 OM EEN TOTAALPAKKET VAN ISOLATIE VAN HOOGTE MM TE VORMEN. 200.INTERVENT 2: VERVANGING VAN RAMEN EN ARMATUREN: DE WERKEN, IN DETAIL, GAAN OVER HET DEMONTEREN VAN DE BESTAANDE ARMATUREN IN KOUD GESNEDEN IJZER EN ENKEL GLAS, NU AFBROKKELEN, EN INSTALLEER NIEUWE VAN GEBRUIKELIJKE VORM EN AFMETINGEN, MAAR GEMAAKT VAN P.V.C. MET PROFIELEN GEËXTRUDEERD DOOR MM. 70 CERTIFICATEN VOLGENS DE WET MET ALGEMENE TRANSMISSIE (PROFIELEN + GLAZEN) GELIJK AAN UW = 1,30 W/SQM?K.INTERVENTO 3: VERVANGING VAN AIRCONDITIONINGSYSTEMEN: DE WERKZAAMHEDEN HEBBEN, IN DETAIL, BETREKKING OP DE VOLLEDIGE RENOVATIE VAN DE BESTAANDE INSTALLATIES VAN DE THERMISCHE CENTRALE TEN DIENSTE VAN DE SCHOOL PLEXUS EN AANVERWANTE SOS (Dutch)
    23 December 2021
    0 references
    MASSNAHME 1: WÄRMEDÄMMUNG HORIZONTALER UND VERTIKALER STRUKTUREN: DIE ARBEITEN BEFASSEN SICH IM DETAIL MIT DER REALISIERUNG DER WÄRMEDÄMMUNG DER BESTEHENDEN DACHGESCHOSSRÄUME DURCH DIE ANBRINGUNG, DIREKT AUF DEM BODENBODEN, VON 2 FILZSCHICHTEN AUS GLASWOLLE IN ROLLEN MIT MM DICKE. 100, UM EIN GESAMTPAKET DER ISOLIERUNG DER HÖHE MM ZU BILDEN. 200.INTERVENT 2: AUSTAUSCH VON WINDOWS UND FIXTURES: DIE ARBEITEN BEFASSEN SICH IM DETAIL MIT DEM ZERLEGEN DER VORHANDENEN VORRICHTUNGEN IN KALT GESCHNITTENEM EISEN UND EINZELGLAS, JETZT ZERBRÖCKELN, UND INSTALLIEREN NEUE DER ÜBLICHEN FORM UND ABMESSUNGEN, ABER AUS P.V.C. MIT PROFILEN VON MM EXTRUDIERT. 70 ZERTIFIKATE NACH DEM GESETZ MIT ALLGEMEINER DURCHLÄSSIGKEIT (PROFILE + GLÄSER) GLEICH UW = 1,30 W/SQM?K.INTERVENTO 3: AUSTAUSCH VON KLIMAANLAGEN: DIE ARBEITEN BEFASSEN SICH IM DETAIL MIT DER KOMPLETTEN SANIERUNG DER BESTEHENDEN ANLAGEN DES THERMISCHEN KRAFTWERKS, DAS DEM SCHULPLEXUS UND DEM DAMIT VERBUNDENEN SOS DIENT. (German)
    24 December 2021
    0 references
    ACCIÓN 1: AISLAMIENTO TÉRMICO DE ESTRUCTURAS HORIZONTALES Y VERTICALES: LAS OBRAS, EN DETALLE, SE OCUPAN DE LA REALIZACIÓN DEL AISLAMIENTO TÉRMICO DE LAS SALAS DEL ÁTICO EXISTENTES A TRAVÉS DE LA COLOCACIÓN, DIRECTAMENTE EN EL SUELO, DE 2 CAPAS DE FIELTRO HECHA DE LANA DE VIDRIO EN ROLLOS DE ESPESOR MM. 100 PARA FORMAR UN PAQUETE TOTAL DE AISLAMIENTO DE ALTURA MM. 200.INTERVENTO 2: SUSTITUCIÓN DE WINDOWS Y ACCESORIOS: LAS OBRAS, EN DETALLE, SE OCUPAN DE DESMONTAR LOS ACCESORIOS EXISTENTES EN HIERRO CORTADO EN FRÍO Y VIDRIO ÚNICO, AHORA DESMORONÁNDOSE, E INSTALAR NUEVOS DE FORMA Y DIMENSIONES HABITUALES PERO FABRICADOS EN P.V.C. CON PERFILES EXTRUIDOS POR MM. 70 CERTIFICADOS SEGÚN LA LEY CON TRANSMISIÓN GENERAL (PERFILES + GAFAS) IGUALES A UW = 1,30 W/SQM?K.INTERVENTO 3: SUSTITUCIÓN DE SISTEMAS DE AIRE ACONDICIONADO: LAS OBRAS, EN DETALLE, SE OCUPAN DE LA RENOVACIÓN COMPLETA DE LAS PLANTAS EXISTENTES DE LA CENTRAL TÉRMICA AL SERVICIO DEL PLEXO ESCOLAR Y SOS RELACIONADAS (Spanish)
    25 January 2022
    0 references
    AKTION 1: VARMEISOLERING AF VANDRETTE OG LODRETTE STRUKTURER: ARBEJDERNE VEDRØRER I DETALJER OPFØRELSEN AF VARMEISOLERINGEN AF DE EKSISTERENDE UNDERGULVE VED HJÆLP AF L? DIREKTE PÅ GULVET I BUNDEN AF N. 2 LAG FILT, I GLASULD, I RULLER AF TYKKELSE MM. 100 MED HENBLIK PÅ AT DANNE EN SAMLET MM. ISOLERINGSPAKKE 200.INTERVENTION 2: UDSKIFTNING AF VINDUESRAMMER OG RAMMER: DETTE ARBEJDE, I DETALJER, OMHANDLER DEMONTERING AF DE EKSISTERENDE INVENTAR I KOLDT JERN OG ENKELTVINDUER, SOM NU ER FORFALDNE, OG INSTALLATION AF NYE RILLER I FORM OG DIMENSIONER, MEN PRODUCERET I SEKTIONER EKSTRUDERET AF MM. 70 LOVLIGT CERTIFICERET MED GENEREL TRANSMISSION (PROFILER + BRILLER) LIG MED UW = 1,30 W/SQM? K.INTERVENTO 3: UDSKIFTNING AF LUFTKONDITIONERINGSANLÆG: ARBEJDET BESKÆFTIGER SIG I DETALJER MED DEN FULDSTÆNDIGE RENOVERING AF DE EKSISTERENDE ANLÆG I VARMEANLÆGGET PÅ SKOLEVARMEANLÆGGET MED ET TILHØRENDE SOS. (Danish)
    5 July 2022
    0 references
    ΔΡΆΣΗ 1: ΘΕΡΜΟΜΌΝΩΣΗ ΟΡΙΖΌΝΤΙΩΝ ΚΑΙ ΚΑΤΑΚΌΡΥΦΩΝ ΔΟΜΏΝ: ΟΙ ΕΡΓΑΣΊΕΣ ΑΦΟΡΟΎΝ ΛΕΠΤΟΜΕΡΏΣ ΤΗΝ ΚΑΤΑΣΚΕΥΉ ΤΗΣ ΘΕΡΜΙΚΉΣ ΜΌΝΩΣΗΣ ΤΩΝ ΥΠΑΡΧΌΝΤΩΝ ΥΠΟΔΆΠΕΔΩΝ ΜΈΣΩ ΤΗΣ L; ΤΟΠΟΘΈΤΗΣΗ, ΑΠΕΥΘΕΊΑΣ ΣΤΟ ΔΆΠΕΔΟ ΤΟΥ ΠΥΘΜΈΝΑ ΤΟΥ Ν. 2 ΣΤΡΏΣΕΙΣ ΠΊΛΗΜΑ, ΣΕ ΥΑΛΟΒΆΜΒΑΚΑ, ΣΕ ΚΥΛΊΝΔΡΟΥΣ ΠΆΧΟΥΣ MM. 100 ΜΕ ΣΚΟΠΌ ΤΗ ΔΙΑΜΌΡΦΩΣΗ ΕΝΌΣ ΣΥΝΟΛΙΚΟΎ MM. ΣΥΣΚΕΥΑΣΊΑ ΜΌΝΩΣΗΣ 200.INTERVENTION 2: ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΠΛΑΙΣΊΩΝ ΚΑΙ ΠΛΑΙΣΊΩΝ ΠΑΡΑΘΎΡΩΝ: ΑΥΤΌ ΤΟ ΈΡΓΟ, ΛΕΠΤΟΜΕΡΏΣ, ΑΣΧΟΛΕΊΤΑΙ ΜΕ ΤΗΝ ΑΠΟΣΥΝΑΡΜΟΛΌΓΗΣΗ ΤΩΝ ΥΦΙΣΤΆΜΕΝΩΝ ΕΞΑΡΤΗΜΆΤΩΝ ΣΕ ΚΡΎΟ ΣΊΔΗΡΟ ΚΑΙ ΕΝΙΑΊΑ ΠΑΡΆΘΥΡΑ, ΤΑ ΟΠΟΊΑ ΤΏΡΑ ΕΊΝΑΙ ΕΡΕΙΠΩΜΈΝΑ, ΚΑΙ ΤΗΝ ΕΓΚΑΤΆΣΤΑΣΗ ΝΈΩΝ ΑΥΛΑΚΏΣΕΩΝ ΣΤΟ ΣΧΉΜΑ ΚΑΙ ΤΙΣ ΔΙΑΣΤΆΣΕΙΣ, ΑΛΛΆ ΠΑΡΆΓΟΝΤΑΙ ΣΕ ΤΜΉΜΑΤΑ ΠΟΥ ΕΞΏΘΗΣΗ ΑΠΌ MM. 70 ΝΌΜΙΜΑ ΠΙΣΤΟΠΟΙΗΜΈΝΑ ΜΕ ΓΕΝΙΚΉ ΜΕΤΆΔΟΣΗ (ΠΡΟΦΊΛ + ΓΥΑΛΙΆ) ΊΣΗ ΜΕ UW = 1,30 W/SQM; K.INTERVENTO 3: ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΣΥΣΤΗΜΆΤΩΝ ΚΛΙΜΑΤΙΣΜΟΎ: ΟΙ ΕΡΓΑΣΊΕΣ, ΛΕΠΤΟΜΕΡΏΣ, ΑΦΟΡΟΎΝ ΤΗΝ ΠΛΉΡΗ ΑΝΑΚΑΊΝΙΣΗ ΤΩΝ ΥΦΙΣΤΆΜΕΝΩΝ ΕΓΚΑΤΑΣΤΆΣΕΩΝ ΤΗΣ ΜΟΝΆΔΑΣ ΘΈΡΜΑΝΣΗΣ ΣΤΟ ΣΧΟΛΕΊΟ ΜΕ ΣΧΕΤΙΚΉ SOS. (Greek)
    5 July 2022
    0 references
    MJERA 1.: TOPLINSKA IZOLACIJA HORIZONTALNIH I VERTIKALNIH STRUKTURA: RADOVI SE DETALJNO BAVE IZGRADNJOM TOPLINSKE IZOLACIJE POSTOJEĆIH PODOVA POMOĆU L? PRIČVRŠĆIVANJE, IZRAVNO NA DNO N. 2 SLOJA PUSTA, U STAKLENOJ VUNI, U ROLAMA DEBLJINE MM. 100 U SVRHU FORMIRANJA UKUPNOG MM. IZOLACIJSKOG PAKETA 200.INTERVENTION 2: ZAMJENA OKVIRA I OKVIRA PROZORA: OVAJ RAD, DETALJNO, BAVI DEMONTAŽA POSTOJEĆIH ČVORA U HLADNOM ŽELJEZA I JEDAN WINDOWS, KOJI SE SADA RUŠI, I INSTALIRANJE NOVIH ŽLIJEBOVA U OBLIKU I DIMENZIJAMA, ALI PROIZVEDENE U DIJELOVIMA EKSTRUDIRANI MM. 70 ZAKONSKI CERTIFICIRANI S OPĆIM PROPUSNOSTI (PROFILI + NAOČALE) JEDNAKA UW = 1,30 W/SQM? K.INTERVENTO 3: ZAMJENA SUSTAVA KLIMATIZACIJE: RAD SE DETALJNO BAVI KOMPLETNOM OBNOVOM POSTOJEĆIH POSTROJENJA TOPLANA U ŠKOLSKOM TOPLANU S POVEZANIM SOS SUSTAVOM. (Croatian)
    5 July 2022
    0 references
    ACȚIUNEA 1: IZOLAREA TERMICĂ A STRUCTURILOR ORIZONTALE ȘI VERTICALE: LUCRĂRILE, ÎN DETALIU, SE OCUPĂ CU CONSTRUIREA IZOLAȚIEI TERMICE A SUB-PODELE EXISTENTE PRIN INTERMEDIUL L? APLICAREA, DIRECT PE PODEAUA DE JOS A N. 2 STRATURI DE PÂSLĂ, ÎN VATĂ DE STICLĂ, ÎN RULOURI CU GROSIMEA DE MM. 100, ÎN SCOPUL FORMĂRII UNUI PACHET TOTAL DE IZOLAȚIE MM. 200.INTERVENȚIA 2: ÎNLOCUIREA RAMELOR ȘI CADRELOR FERESTRELOR: ACEASTĂ LUCRARE, ÎN DETALIU, ABORDEAZĂ DEMONTAREA CORPURILOR EXISTENTE ÎN FIER RECE ȘI FERESTRE UNICE, CARE SUNT ACUM DĂRĂPĂNATE, ȘI INSTALAREA DE NOI CANELURI ÎN FORMĂ ȘI DIMENSIUNI, DAR PRODUSE ÎN SECȚIUNI EXTRUDATE DE MM. 70 CERTIFICATE LEGAL CU TRANSMISIE GENERALĂ (PROFILURI + OCHELARI) EGALĂ CU UW = 1,30 W/MP? K.INTERVENTO 3: ÎNLOCUIREA SISTEMELOR DE CLIMATIZARE: ACTIVITATEA, ÎN DETALIU, SE REFERĂ LA RENOVAREA COMPLETĂ A INSTALAȚIILOR EXISTENTE ALE CENTRALEI TERMICE DE LA CENTRALA DE ÎNCĂLZIRE ȘCOALĂ CU UN SOS CONEXE. (Romanian)
    5 July 2022
    0 references
    AKCIA 1: TEPELNÁ IZOLÁCIA HORIZONTÁLNYCH A VERTIKÁLNYCH KONŠTRUKCIÍ: PRÁCE SA PODROBNE ZAOBERAJÚ VÝSTAVBOU TEPELNEJ IZOLÁCIE EXISTUJÚCICH PODLAHOVÝCH PODLÁH POMOCOU L? PRIPEVNENIE PRIAMO NA PODLAHU SPODNEJ ČASTI N. 2 VRSTVY PLSTI, V SKLENENEJ VLNE, VO ZVITKOCH S HRÚBKOU MM. 100 ZA ÚČELOM VYTVORENIA CELKOVEJ MM. IZOLAČNÝ BALÍK 200.INTERVENTION 2: VÝMENA OKENNÝCH RÁMOV A RÁMOV: TÁTO PRÁCA SA PODROBNE ZAOBERÁ DEMONTÁŽOU EXISTUJÚCICH PRÍPRAVKOV V STUDENOM ŽELEZE A JEDNOTLIVÝCH OKNÁCH, KTORÉ SÚ TERAZ SCHÁTRANÉ, A INŠTALÁCIOU NOVÝCH DRÁŽOK V TVARE A ROZMEROCH, ALE VYRÁBANÝCH V ODDIELOCH EXTRUDOVANÝCH SPOLOČNOSŤOU MM. 70 PRÁVNE CERTIFIKOVANÝCH SO VŠEOBECNOU PRIEPUSTNOSŤOU (PROFILY + OKULIARE) ROVNAJÚCOU SA UW = 1,30 W/M²? K.INTERVENTO 3: VÝMENA KLIMATIZAČNÝCH SYSTÉMOV: PRÁCA SA PODROBNE ZAOBERÁ KOMPLETNOU REKONŠTRUKCIOU EXISTUJÚCICH ZARIADENÍ TEPLÁRNE V ŠKOLSKOM TEPLÁRNI S PRÍSLUŠNÝM SOS. (Slovak)
    5 July 2022
    0 references
    AZZJONI 1: INSULAZZJONI TERMALI TA’ STRUTTURI ORIZZONTALI U VERTIKALI: IX-XOGĦLIJIET, FID-DETTALL, JITTRATTAW IL-KOSTRUZZJONI TAL-INSULAZZJONI TERMALI TAS-SOTTOARTI EŻISTENTI PERMEZZ TA’ L? TWAĦĦIL, DIRETTAMENT MAL-ART TAL-QIEGĦ TAS-SAFFI N. 2 TAL-FELTRU, FIS-SUF TAL-ĦĠIEĠ, F’ROMBLI TA’ ĦXUNA TA’ MM. 100 BIL-GĦAN LI JIĠI FFURMAT PAKKETT MM TOTALI TA’ INSULAZZJONI 200.INTERVENZJONI 2: SOSTITUZZJONI TAL-FREJMS TAT-TWIEQI U TAL-OQFSA: DAN IX-XOGĦOL, FID-DETTALL, JINDIRIZZA Ż-ŻARMAR TA ‘L-ATTREZZATURI EŻISTENTI FIL-ĦADID KIESAĦ U SINGLE WINDOWS, LI ISSA HUMA DILAPIDATED, U L-INSTALLAZZJONI TA’ SKANALATURI ĠODDA FIL-FORMA U D-DIMENSJONIJIET IŻDA PRODOTTI F’SEZZJONIJIET ESTRUŻI MINN MM. 70 LEGALMENT IĊĊERTIFIKATI BI TRAŻMITTANZA ĠENERALI (PROFILI + NUĊĊALIJIET) UGWALI GĦAL UW = 1,30 W/SQM? K.INTERVENTO 3: SOSTITUZZJONI TAS-SISTEMI TAL-ARJA KKONDIZZJONATA: IL-ĦIDMA, FID-DETTALL, TITTRATTA R-RINNOVAZZJONI SĦIĦA TAL-IMPJANTI EŻISTENTI TAL-IMPJANT TAT-TISĦIN FL-IMPJANT TAT-TISĦIN TAL-ISKEJJEL B’SOS RELATAT. (Maltese)
    5 July 2022
    0 references
    AÇÃO 1: ISOLAMENTO TÉRMICO DE ESTRUTURAS HORIZONTAIS E VERTICAIS: AS OBRAS, EM PORMENOR, TRATAM DA CONSTRUÇÃO DO ISOLAMENTO TÉRMICO DOS SUBPAVIMENTOS EXISTENTES POR MEIO DE L? AFIXAÇÃO, DIRETAMENTE NO CHÃO DO FUNDO DE N. 2 CAMADAS DE FELTRO, EM LÃ DE VIDRO, EM ROLOS DE ESPESSURA DE MM. 100 COM A FINALIDADE DE FORMAR UM PACOTE DE ISOLAMENTO MM. TOTAL 200.INTERVENÇÃO 2: SUBSTITUIÇÃO DE CAIXILHOS E QUADROS DE JANELAS: ESTE TRABALHO, EM PORMENORES, ABORDA A DESMONTAGEM DOS EQUIPAMENTOS EXISTENTES EM FERRO FRIO E JANELAS SIMPLES, QUE AGORA ESTÃO DILAPIDADOS, E INSTALANDO NOVOS SULCOS NA FORMA E DIMENSÕES, MAS PRODUZIDOS EM SEÇÕES EXTRUDIDAS PELA MM. 70 LEGALMENTE CERTIFICADAS COM TRANSMITÂNCIA GERAL (PERFIS + ÓCULOS) IGUAL A UW = 1,30 W/SQM? K.INTERVENTO 3: SUBSTITUIÇÃO DOS SISTEMAS DE AR CONDICIONADO: O TRABALHO, EM PORMENORES, TRATA DA REMODELAÇÃO COMPLETA DAS INSTALAÇÕES EXISTENTES DA USINA DE AQUECIMENTO NA USINA DE AQUECIMENTO ESCOLAR COM UM SOS RELACIONADO. (Portuguese)
    5 July 2022
    0 references
    TOIMI 1: VAAKA- JA PYSTYRAKENTEIDEN LÄMPÖERISTYS: TEOKSISSA KÄSITELLÄÄN YKSITYISKOHTAISESTI OLEMASSA OLEVIEN ALALATTIOIDEN LÄMMÖNERISTYKSEN RAKENTAMISTA L:N AVULLA? KIINNITTÄMINEN SUORAAN LATTIAAN POHJAN N. 2 KERROSTA HUOPA, LASIVILLAA, RULLINA PAKSUUS MM. 100 VARTEN YHTEENSÄ MM. ERISTYS PAKETTI 200.INTERVENTION 2: IKKUNAKEHYSTEN JA -KEHYSTEN KORVAAMINEN: TÄSSÄ TYÖSSÄ KÄSITELLÄÄN YKSITYISKOHTAISESTI NYKYISTEN VALAISIMIEN PURKAMISTA KYLMÄSSÄ RAUDASSA JA YKSITTÄISISSÄ WINDOWS-IKKUNOISSA, JOTKA OVAT NYT RAPPEUTUNEET, JA UUSIEN URIEN ASENTAMINEN MUOTOON JA MITTOIHIN, MUTTA NE ON TUOTETTU MM: N PURISTAMISSA OSISSA. 70 LAILLISESTI VARMENNETTU YLEISLÄPÄISYLLÄ (PROFIILIT + LASIT) YHTÄ SUURI KUIN UW = 1,30 W/SQM? K.INTERVENTO 3: ILMASTOINTIJÄRJESTELMIEN KORVAAMINEN: TYÖ KOSKEE YKSITYISKOHTAISESTI KOULULÄMPÖLAITOKSEN OLEMASSA OLEVIEN LAITOSTEN KUNNOSTAMISTA JA SIIHEN LIITTYVÄÄ SOS:ÄÄ. (Finnish)
    5 July 2022
    0 references
    DZIAŁANIE 1: IZOLACJA TERMICZNA KONSTRUKCJI POZIOMYCH I PIONOWYCH: PRACE, W SZCZEGÓŁACH, DOTYCZĄ BUDOWY IZOLACJI TERMICZNEJ ISTNIEJĄCYCH PODPODŁÓG ZA POMOCĄ L? MOCOWANIE BEZPOŚREDNIO NA PODŁODZE DNA N. 2 WARSTWY FILCU, WEŁNY SZKLANEJ, W ROLKACH O GRUBOŚCI MM. 100 W CELU UTWORZENIA CAŁKOWITEGO PAKIETU IZOLACYJNEGO MM. 200.INTERVENCJA 2: WYMIANA RAM OKIENNYCH I OŚCIEŻNIC: TA PRACA SZCZEGÓŁOWO DOTYCZY DEMONTAŻU ISTNIEJĄCYCH OSPRZĘTÓW W ZIMNYM ŻELAZIE I POJEDYNCZYCH OKNACH, KTÓRE SĄ OBECNIE ZNISZCZONE, ORAZ INSTALACJI NOWYCH ROWKÓW W KSZTAŁCIE I WYMIARACH, ALE PRODUKOWANYCH W SEKCJACH WYTŁACZANYCH PRZEZ MM. 70 LEGALNIE CERTYFIKOWANYCH Z OGÓLNĄ PRZEPUSZCZALNOŚCIĄ (PROFILE + OKULARY) RÓWNĄ UW = 1,30 W/SQM? K.INTERVENTO 3: WYMIANA SYSTEMÓW KLIMATYZACJI: PRACE, W SZCZEGÓŁACH, DOTYCZĄ CAŁKOWITEGO REMONTU ISTNIEJĄCYCH ZAKŁADÓW CIEPŁOWNI W SZKOLNEJ CIEPŁOWNI Z POWIĄZANYM SOS. (Polish)
    5 July 2022
    0 references
    UKREP 1: TOPLOTNA IZOLACIJA VODORAVNIH IN NAVPIČNIH KONSTRUKCIJ: DELA SE PODROBNO UKVARJAJO Z GRADNJO TOPLOTNE IZOLACIJE OBSTOJEČIH PODTALOV S POMOČJO L? PRITRDITEV, NEPOSREDNO NA TLA NA DNU N. 2 PLASTI KLOBUČEVINE, V STEKLENE VOLNE, V ZVITKIH DEBELINE MM. 100 ZA NAMEN OBLIKOVANJA SKUPNEGA MM. IZOLACIJSKI PAKET 200.INTERVENTION 2: ZAMENJAVA OKENSKIH OKVIRJEV IN OKVIRJEV: TO DELO PODROBNO OBRAVNAVA DEMONTAŽO OBSTOJEČIH NAPELJAV V HLADNEM ŽELEZA IN ENOJNIH OKEN, KI SO ZDAJ RAZPADAJO, IN NAMESTITEV NOVIH ŽLEBOV V OBLIKI IN DIMENZIJAH, VENDAR PROIZVEDENI V ODDELKIH EKSTRUDIRA MM. 70 PRAVNO CERTIFICIRANA S SPLOŠNO PREPUSTNOST (PROFILI + OČALA) ENAKA UW = 1,30 W/M²? K.INTERVENTO 3: ZAMENJAVA KLIMATSKIH NAPRAV: DELO, PODROBNO, SE UKVARJA S POPOLNO PRENOVO OBSTOJEČIH NAPRAV TOPLARNE V ŠOLSKI TOPLARNI S SORODNIM SOS. (Slovenian)
    5 July 2022
    0 references
    OPATŘENÍ Č. 1: TEPELNÁ IZOLACE VODOROVNÝCH A VERTIKÁLNÍCH KONSTRUKCÍ: PRÁCE SE PODROBNĚ ZABÝVAJÍ VÝSTAVBOU TEPELNÉ IZOLACE STÁVAJÍCÍCH PODPODLAH POMOCÍ L? UCHYCENÍ PŘÍMO NA PODLAHU DNA N. 2 VRSTVY PLSTI, VE SKLENĚNÉ VLNĚ, V ROLÍCH O TLOUŠŤCE MM. 100 ZA ÚČELEM VYTVOŘENÍ CELKOVÉHO MM. IZOLAČNÍHO BALENÍ 200.INTERVENTION 2: VÝMĚNA OKENNÍCH RÁMŮ A RÁMŮ: TATO PRÁCE PODROBNĚ ŘEŠÍ DEMONTÁŽ STÁVAJÍCÍCH SVÍTIDEL VE STUDENÉM ŽELEZE A JEDNOTLIVÝCH OKNECH, KTERÉ JSOU NYNÍ ZCHÁTRALÉ, A INSTALACI NOVÝCH DRÁŽEK VE TVARU A ROZMĚRECH, ALE VYROBENÝCH V SEKCÍCH VYTLAČOVANÝCH MM. 70 LEGÁLNĚ CERTIFIKOVANÝCH S OBECNOU PROPUSTNOSTÍ (PROFILY + BRÝLE) ROVNAJÍCÍ SE UW = 1,30 W/SQM? K.INTERVENTO 3: VÝMĚNA KLIMATIZAČNÍCH SYSTÉMŮ: PRÁCE SE PODROBNĚ ZABÝVÁ KOMPLETNÍ REKONSTRUKCÍ STÁVAJÍCÍCH ZAŘÍZENÍ TEPLÁRNY VE ŠKOLNÍ TEPLÁRNĚ SE SOUVISEJÍCÍM SOS. (Czech)
    5 July 2022
    0 references
    1 VEIKSMAS. HORIZONTALIŲ IR VERTIKALIŲ KONSTRUKCIJŲ ŠILUMINĖ IZOLIACIJA: DARBAI, IŠSAMIAI, SUSIJĘS SU ŠILUMOS IZOLIACIJA ESAMŲ GRINDIS STATYBOS NAUDOJANT L? KLIJAVIMAS TIESIAI PRIE N. 2 SLUOKSNIŲ VELTINIO DUGNO GRINDŲ, STIKLO VATA, RITINIAIS, KURIŲ STORIS MM. 100, SIEKIANT SUFORMUOTI BENDRĄ MM. IZOLIACIJOS PAKETĄ 200.INTERVENTION 2: LANGŲ RĖMŲ IR RĖMŲ KEITIMAS: ŠIS DARBAS, IŠSAMIAI, SKIRTAS ESAMŲ ARMATŪRA IŠMONTAVIMO ŠALTO GELEŽIES IR VIENO LANGAI, KURIE DABAR YRA SUGRIAUTI, IR ĮDIEGTI NAUJUS GRIOVELIUS FORMOS IR MATMENŲ, BET GAMINAMI SKYRIUOSE EKSTRUZIJOS MM. 70 TEISIŠKAI SERTIFIKUOTAS SU BENDRO PERDAVIMO (PROFILIAI + AKINIAI) LYGUS UW = 1,30 W/SQM? K.INTERVENTO 3: ORO KONDICIONAVIMO SISTEMŲ KEITIMAS: ŠIS DARBAS IŠSAMIAI SUSIJĘS SU VISIŠKU ESAMŲ ŠILDYMO ĮRENGINIO ĮRENGINIŲ ATNAUJINIMU MOKYKLOS ŠILDYMO ĮMONĖJE SU SUSIJUSIA SOS. (Lithuanian)
    5 July 2022
    0 references
    DARBĪBA NR. 1. SILTUMIZOLĀCIJA HORIZONTĀLĀM UN VERTIKĀLĀM KONSTRUKCIJĀM: DARBI, DETALIZĒTI, NODARBOJAS AR BŪVNIECĪBU SILTUMIZOLĀCIJAS ESOŠO GRĪDAS AR L? PIESTIPRINĀŠANA, TIEŠI PIE GRĪDAS APAKŠĀ N. 2 SLĀŅI FILCA, STIKLA VATES, RUĻĻOS AR BIEZUMU MM. 100, LAI VEIDOTU KOPĒJO MM. IZOLĀCIJAS PAKETE 200.INTERVENTION 2: LOGU RĀMJU UN RĀMJU NOMAIŅA: ŠIS DARBS, DETALIZĒTI, ATTIECAS UZ ESOŠO ARMATŪRAS DEMONTĀŽU AUKSTĀ DZELZS UN VIENĀ WINDOWS, KAS TAGAD IR IZBLĪVĒTI, UN UZSTĀDOT JAUNAS RIEVAS FORMĀ UN DIMENSIJĀS, BET RAŽO SADAĻĀS EKSTRUDĒTA MM 70 JURIDISKI SERTIFICĒTS AR VISPĀRĒJO CAURLAIDĪBU (PROFILI + BRILLES), KAS VIENĀDS AR UW = 1,30 W/SQM? K.INTERVENTO 3: GAISA KONDICIONĒŠANAS SISTĒMU NOMAIŅA: DARBS DETALIZĒTI ATTIECAS UZ SKOLAS SILTUMSTACIJAS ESOŠO SPĒKSTACIJU PILNĪGU RENOVĀCIJU AR SAISTĪTU SOS. (Latvian)
    5 July 2022
    0 references
    ДЕЙНОСТ 1: ТОПЛОИЗОЛАЦИЯ НА ХОРИЗОНТАЛНИ И ВЕРТИКАЛНИ КОНСТРУКЦИИ: РАБОТИТЕ, В ДЕТАЙЛИ, СЕ ЗАНИМАВАТ С ИЗГРАЖДАНЕТО НА ТОПЛОИЗОЛАЦИЯ НА СЪЩЕСТВУВАЩИТЕ ПОДОВИ НАСТИЛКИ С ПОМОЩТА НА L? ПОСТАВЯНЕ, ДИРЕКТНО НА ПОДА НА ДЪНОТО НА N. 2 СЛОЯ ФИЛЦ, В СТЪКЛЕНА ВАТА, НА РУЛА С ДЕБЕЛИНА ММ. 100 ЗА ЦЕЛИТЕ НА ФОРМИРАНЕ НА ОБЩ ММ. ИЗОЛАЦИОНЕН ПАКЕТ 200.ИНТЕРВЕНЦИЯ 2: ПОДМЯНА НА ДОГРАМА И РАМКИ: ТАЗИ РАБОТА, В ПОДРОБНОСТИ, СЕ ОТНАСЯ ДО ДЕМОНТИРАНЕТО НА СЪЩЕСТВУВАЩИТЕ ТЕЛА В СТУДЕНО ЖЕЛЯЗО И ЕДИНИЧНИ ПРОЗОРЦИ, КОИТО СЕГА СА РАЗРУШЕНИ, И ИНСТАЛИРАНЕТО НА НОВИ КАНАЛИ ВЪВ ФОРМАТА И РАЗМЕРИТЕ, НО ПРОИЗВЕДЕНИ В СЕКЦИИ, ЕКСТРУДИРАНИ ОТ MM. 70 ЗАКОННО СЕРТИФИЦИРАНИ С ОБЩА ПРОПУСКЛИВОСТ (ПРОФИЛИ + ОЧИЛА), РАВНИ НА UW = 1,30 W/SQM? K.INTERVENTO 3: ПОДМЯНА НА КЛИМАТИЧНИ СИСТЕМИ: РАБОТАТА В ДЕТАЙЛИ СЕ ЗАНИМАВА С ПЪЛНОТО ОБНОВЯВАНЕ НА СЪЩЕСТВУВАЩИТЕ ИНСТАЛАЦИИ НА ОТОПЛИТЕЛНАТА ЦЕНТРАЛА В УЧИЛИЩНАТА ТОПЛОФИКАЦИОННА ЦЕНТРАЛА СЪС СЪОТВЕТНА SOS. (Bulgarian)
    5 July 2022
    0 references
    INTÉZKEDÉS: VÍZSZINTES ÉS FÜGGŐLEGES SZERKEZETEK HŐSZIGETELÉSE: A MUNKÁLATOK RÉSZLETESEN FOGLALKOZNAK AZ ÉPÍTÉS A HŐSZIGETELÉS A MEGLÉVŐ ALPADLÓK SEGÍTSÉGÉVEL L? KÖZVETLENÜL AZ N. 2 RÉTEG NEMEZ ALJÁNAK PADLÓJÁRA RÖGZÍTÉSE, ÜVEGGYAPOTBAN, MM 100 VASTAGSÁGÚ TEKERCSEKBEN, TELJES MM. SZIGETELŐCSOMAG LÉTREHOZÁSA CÉLJÁBÓL 200.INTERVENTION 2: ABLAKKERETEK ÉS KERETEK CSERÉJE: EZ A MUNKA RÉSZLETESEN FOGLALKOZIK A MEGLÉVŐ BERENDEZÉSI TÁRGYAK BONTÁSÁVAL HIDEG VASBAN ÉS EGYABLAKBAN, AMELYEK MOST ROMLANAK, ÉS ÚJ HORNYOKAT TELEPÍTENEK AZ ALAKBAN ÉS A MÉRETEKBEN, DE AZ MM ÁLTAL EXTRUDÁLT SZAKASZOKBAN KÉSZÜLNEK. 70 LEGÁLISAN TANÚSÍTVÁNNYAL, ÁLTALÁNOS ÁTERESZTŐKÉPESSÉGGEL (PROFILOK + SZEMÜVEG) EGYENLŐ UW = 1,30 W/SQM? K.INTERVENTO 3: LÉGKONDICIONÁLÓ RENDSZEREK CSERÉJE: A MUNKA RÉSZLETESEN FOGLALKOZIK A TELJES FELÚJÍTÁSA A MEGLÉVŐ ÜZEMEK A FŰTÉSI ÜZEM AZ ISKOLA FŰTÉSI ÜZEM KAPCSOLÓDÓ SOS. (Hungarian)
    5 July 2022
    0 references
    GNÍOMH 1: INSLIÚ TEIRMEACH AR STRUCHTÚIR CHOTHROMÁNACHA AGUS INGEARACHA: DÉILEÁLANN NA HOIBREACHA, GO MION, LE HINSLIÚ TEIRMEACH NA BHFO-URLAS ATÁ ANN CHEANA A THÓGÁIL TRÍ L? GREAMÚ, GO DÍREACH AR URLÁR BUN SHRAITHEANNA N. 2 FEILT, IN OLANN GHLOINE, I ROLLAÍ DE THIÚS MM. 100 CHUN PACÁISTE INSLITHE IOMLÁN MM. 200.INTERVENTION 2 A CHRUTHÚ: ATHSHOLÁTHAR FRÁMAÍ AGUS FRÁMAÍ FUINNEOIGE: AN OBAIR SEO, GO MION, AGHAIDH A THABHAIRT AR DHÍCHÓIMEÁIL NA DAINGNEÁIN ATÁ ANN CHEANA FÉIN I IARANN FUAR AGUS WINDOWS SINGIL, ATÁ DILAPIDATED ANOIS, AGUS A SHUITEÁIL GROOVES NUA I GCRUTH AGUS TOISÍ ACH A THÁIRGTEAR I GCODANNA EASBHRÚITE AG MM. 70 DEIMHNITHE GO DLÍTHIÚIL LE TRANSMITTANCE GINEARÁLTA (PROFILES + SPÉACLAÍ) COMHIONANN LE UW = 1,30 W/SQM? K.INTERVENTO 3: CÓRAIS AERCHÓIRIÚCHÁIN A ATHSHOLÁTHAR: DÉILEÁLANN AN OBAIR, GO MION, LE HATHCHÓIRIÚ IOMLÁN AR GHLÉASRAÍ REATHA AN GHLÉASRA TÉIMH AG IONAD TÉIMH NA SCOILE LE SOS GAOLMHAR. (Irish)
    5 July 2022
    0 references
    ÅTGÄRD 1: VÄRMEISOLERING AV HORISONTELLA OCH VERTIKALA STRUKTURER: ARBETENA, I DETALJ, HANDLAR OM BYGGANDET AV VÄRMEISOLERINGEN AV DE BEFINTLIGA UNDERGOLVEN MED HJÄLP AV L? ANBRINGANDE, DIREKT PÅ GOLVET AV BOTTEN AV N. 2 FILTSKIKT, I GLASULL, I RULLAR MED EN TJOCKLEK AV MM. 100 FÖR ATT BILDA EN TOTAL MM. ISOLERINGSPAKET 200.INTERVENTION 2: UTBYTE AV FÖNSTERKARMAR OCH FÖNSTERKARMAR: DETTA ARBETE BEHANDLAR I DETALJ NEDMONTERINGEN AV DE BEFINTLIGA ARMATURERNA I KALLT JÄRN OCH ENSTAKA FÖNSTER, SOM NU ÄR FÖRFALLNA, OCH INSTALLATION AV NYA SPÅR I FORM OCH DIMENSIONER MEN SOM PRODUCERAS I SEKTIONER EXTRUDERADE AV MM. 70 JURIDISKT CERTIFIERAD MED ALLMÄN TRANSMITTANS (PROFILER + GLASÖGON) LIKA MED UW = 1,30 W/KVM? K.INTERVENTO 3: UTBYTE AV LUFTKONDITIONERINGSSYSTEM: ARBETET HANDLAR I DETALJ OM DEN FULLSTÄNDIGA RENOVERINGEN AV DE BEFINTLIGA ANLÄGGNINGARNA I VÄRMEANLÄGGNINGEN VID SKOLANS VÄRMEVERK MED TILLHÖRANDE SOS. (Swedish)
    5 July 2022
    0 references
    MEEDE 1: HORISONTAALSETE JA VERTIKAALSETE STRUKTUURIDE SOOJUSISOLATSIOON: TÖÖDES KÄSITLETAKSE ÜKSIKASJALIKULT OLEMASOLEVATE ALAMPÕRANDATE SOOJUSISOLATSIOONI EHITAMIST L-I ABIL? KINNITADES OTSE N. 2 VILDIST KIHI PÕHJA PÕRANDALE KLAASVILLANA, RULLIDES PAKSUSEGA MM. 100, ET MOODUSTADA KOKKU MM. ISOLATSIOONIPAKETT 200.INTERVENTION 2: AKNARAAMIDE JA -RAAMIDE VÄLJAVAHETAMINE: SEE TÖÖ KÄSITLEB ÜKSIKASJALIKULT OLEMASOLEVATE SEADMETE DEMONTEERIMIST KÜLMAS RAUAS JA ÜKSIKUS AKNAS, MIS ON NÜÜD LAGUNENUD, NING UUTE SOONTE PAIGALDAMIST KUJU JA MÕÕTMETEGA, KUID MIS ON TOODETUD OSADES, MILLE ON VÄLJA PRESSINUD MM. 70, MIS ON SEADUSLIKULT SERTIFITSEERITUD ÜLDISE LÄBILASKVUSEGA (PROFIILID + PRILLID) VÕRDUB UW = 1,30 W/SQM? K.INTERVENTO 3: KLIIMASEADMETE VÄLJAVAHETAMINE: TÖÖ KÄSITLEB ÜKSIKASJALIKULT OLEMASOLEVATE KÜTTEJAAMADE TÄIELIKKU RENOVEERIMIST KOOLIKÜTTEJAAMAS KOOS SELLEGA SEOTUD SOS-IGA. (Estonian)
    5 July 2022
    0 references
    MONTE SAN SAVINO
    0 references

    Identifiers