COMPLETION OF INFRASTRUCTURE WORKS AIMED AT THE CONSERVATION, EXPLOITATION AND ENJOYMENT OF THE GREEN CAVE (Q2051614)
Jump to navigation
Jump to search
Project Q2051614 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | COMPLETION OF INFRASTRUCTURE WORKS AIMED AT THE CONSERVATION, EXPLOITATION AND ENJOYMENT OF THE GREEN CAVE |
Project Q2051614 in Italy |
Statements
425,000.0 Euro
0 references
850,000.0 Euro
0 references
50.0 percent
0 references
2 September 2017
0 references
31 December 2019
0 references
AZIENDA SPECIALE PARCO DI PORTO CONTE
0 references
1.COMPLETAMENTO E RIPRISTINO CENTRO DI PRIMA ACCOGLIENZA 2.PISTA PEDONALE DI ACCESSO ADIACENTE ALLA STRADA PROVINCIALE 3.CONSOLIDAMENTO DELLA FALESIA SOVRASTANTE IL PERCORSO DI ACCESSO 4.CONSOLIDAMENTI ALL¿INTERNO DELLA GROTTA 5.RIPRISTINO DELLA ESISTENTE SCALINATA DI ACCESSO ESTERNA 6.REALIZZAZIONE NUOVI CAMMINAMENTI NEL PERCORSO INTERNO ALLA GROTTA 7.REALIZZAZIONE SISTEMA DI ILLUMINAZIONE PERCORSO DI ACCESSO 8.REALIZZAZIONE SISTEMA DI ILLUMINAZIONE INTERNO DELLA GROTTA 9.CARTELLONISTICA DI BASE IN SPAZI ATTREZZATI 10.SISTEMA DI MONITORAGGIO DEI PARAMETRI CHIMICI E FISICI 11.MONITORAGGIO DELLA STABILITà DELLA FALESIA E DELLA GROTTA 12.SCAVI ARCHEOLOGICI (Italian)
0 references
1.COMPLETING AND RE-ESTABLISHMENT OF FIRST RECEPTION CENTRE 2.PIDATE, ADJACENT TO THE PROVINCIAL ROAD 3.CONSOLIDATE, OF THE AREA OVER THE ACCESS PATH 4.CONSOLIDENUTION WITHIN THE CAVE 5.RIPRIMISINE OF THE EXISTING EXTERNAL ACCESS PATH 6.RESALYATION, NEW WALKWAYS IN THE INNER TRACK OF THE CAVE 7.PERFORMANCE OF THE LIGHTING SYSTEM OF ACCESS 8.RESALISATION SYSTEM FOR THE INTERNAL LIGHTING OF THE CAVE 9.CARTETLLONISTICA BASED IN 10.MONITORING OF THE CHEMICAL AND PHYSICAL PARAMETERS OF THE 11.MONITORING SYSTEM FOR THE DETERMINATION OF THE CHEMICAL AND PHYSICAL PARAMETERS OF THE 12.MONITORING ESTABLISHMENT.MONITORING) (English)
0.078957519795939
0 references
1.COMPLÉTATION ET RESTAURATION DU PREMIER CENTRE D’ACCUEIL 2.FEDEST CHEMIN D’ACCÈS ADJACENT À LA ROUTE PROVINCIALE 3.CONSOLIDATION DE LA FALAISE AU-DESSUS DU CHEMIN D’ACCÈS 4.CONSOLIDAMENTS À L’INTÉRIEUR DE LA GROTTE 5.RESTORATION DE L’ESCALIER D’ACCÈS EXTERNE EXISTANT 6.REALISATION DE NOUVELLES PASSERELLES DANS LE CHEMIN À L’INTÉRIEUR DE LA GROTTE 7.REALISATION DU SYSTÈME D’ÉCLAIRAGE DU SYSTÈME D’ÉCLAIRAGE 8.REALISATION DU SYSTÈME D’ÉCLAIRAGE INTERNE DE LA GROTTE 9.BASE CARTELLONISTIQUE DANS LES ESPACES ÉQUIPÉS 10.SISTEM SURVEILLANCE DES PARAMÈTRES CHIMIQUES ET PHYSIQUES 11.MONITORAGE DE LA STABILITÉ DE LA FALAISE ET DE LA CAVERNE 12.SCAVI ARCHÉOLOGIQUE (French)
16 December 2021
0 references
1.COMPLETATIE EN RESTAURATIE VAN HET EERSTE ONTVANGSTCENTRUM 2.FEDEST TOEGANGSPAD GRENZEND AAN DE PROVINCIALE WEG 3.CONSOLIDATION VAN DE KLIF BOVEN HET TOEGANGSPAD 4.CONSOLIDAMENTS IN DE GROT 5.RESTORATION VAN DE BESTAANDE EXTERNE TOEGANGSTRAP 6.REALISATION NIEUWE LOOPPADEN IN HET PAD BINNEN DE GROT 7.REALISATION VAN VERLICHTINGSSYSTEEM TOEGANGSPAD 8.REALISATION VAN HET INTERNE VERLICHTINGSSYSTEEM VAN DE GROT 9.CARTELLONISTIC BASIS IN UITGERUSTE RUIMTEN 10.SISTEM MONITORING VAN CHEMISCHE EN FYSISCHE PARAMETERS 11.MONITORAGE VAN DE STABILITEIT VAN DE KLIF EN GROT 12.SCAVI ARCHEOLOGISCHE BASIS (Dutch)
23 December 2021
0 references
1.COMPLETATION UND RESTAURIERUNG DES ERSTEN EMPFANGSZENTRUMS 2.FEDEST ZUGANG PFAD NEBEN DER PROVINZSTRASSE 3.CONSOLIDATION DER KLIPPE ÜBER DEM ZUGANGSWEG 4.CONSOLIDAMENTS INNERHALB DER HÖHLE 5.RESTORATION DER BESTEHENDEN EXTERNEN ZUGANGSTREPPE 6.REALISATION NEUE GEHWEGE IM PFAD INNERHALB DER HÖHLE 7.REALISATION DER BELEUCHTUNGSSYSTEM ZUGANG PFAD 8.REALISATION VON DEM INTERNEN BELEUCHTUNGSSYSTEM DER HÖHLE 9.KARTELLONISTISCHE BASIS IN AUSGESTATTETEN RÄUMEN 10.SISTEM ÜBERWACHUNG VON CHEMISCHEN UND PHYSIKALISCHEN PARAMETERN 11.MONITORAGE DER STABILITÄT DER KLIPPE UND HÖHLE 12.SCAVI ARCHÄOLOGISCHE (German)
24 December 2021
0 references
1.COMPLETACIÓN Y RESTAURACIÓN DEL PRIMER CENTRO DE RECEPCIÓN 2.FEDEST CAMINO DE ACCESO ADYACENTE A LA CARRETERA PROVINCIAL 3.CONSOLIDACIÓN DEL ACANTILADO POR ENCIMA DEL CAMINO DE ACCESO 4.CONSOLIDAMENTES DENTRO DE LA CUEVA 5.RESTORACIÓN DE LA ESCALERA DE ACCESO EXTERIOR EXISTENTE 6.REALISACIÓN NUEVAS PASARELAS EN EL CAMINO DENTRO DE LA CUEVA 7.REALISACIÓN DEL SISTEMA DE ALUMBRADO CAMINO DE ACCESO 8.REALISACIÓN DEL SISTEMA DE ILUMINACIÓN INTERNA DE LA CUEVA 9.CARTELLONISTIC BASE EN ESPACIOS EQUIPADOS 10.SISTEM MONITORIZACIÓN DE PARÁMETROS QUÍMICOS Y FÍSICOS 11.MONITORIO DE LA ESTABILIDAD DEL ACANTILADO Y CUEVA 12.SCAVI (Spanish)
25 January 2022
0 references
1.KOMPLETING OG GENETABLERING AF FØRSTE MODTAGELSESCENTER 2.PIDATE, DER STØDER OP TIL PROVINSVEJ 3.CONSOLIDATE, AF OMRÅDET OVER ADGANGSVEJ 4.CONSOLIDENUTION INDEN FOR HULEN 5.RIPRIMISINE AF DEN EKSISTERENDE EKSTERNE ADGANGSVEJ 6.RESALYATION, NYE GANGBROER I DET INDRE SPOR AF HULEN 7.PERFORMANCE AF BELYSNINGSSYSTEMET FOR ADGANG 8.RESALISATION SYSTEM TIL INTERN BELYSNING AF HULEN 9.CARTETLLONISTICA BASERET I 10.MONITORING AF DE KEMISKE OG FYSISKE PARAMETRE I 11.MONITORING SYSTEMET TIL BESTEMMELSE AF DE KEMISKE OG FYSISKE PARAMETRE FOR 12.MONITORING ESTABLISHMENT.MONITORING) (Danish)
5 July 2022
0 references
1.ΣΥΝΑΡΜΟΛΌΓΗΣΗ ΚΑΙ ΑΠΟΚΑΤΆΣΤΑΣΗ ΤΟΥ ΠΡΏΤΟΥ ΚΈΝΤΡΟΥ ΥΠΟΔΟΧΉΣ 2.PIDATE, ΔΊΠΛΑ ΣΤΗΝ ΕΠΑΡΧΙΑΚΉ ΟΔΌ 3.CONSOLIDATE, ΤΗΣ ΠΕΡΙΟΧΉΣ ΠΆΝΩ ΑΠΌ ΤΟ ΜΟΝΟΠΆΤΙ ΠΡΌΣΒΑΣΗΣ 4.CONSOLIDENUTION ΕΝΤΌΣ ΤΟΥ ΣΠΗΛΑΊΟΥ 5.RIPRIMISINE ΤΗΣ ΥΠΆΡΧΟΥΣΑΣ ΕΞΩΤΕΡΙΚΉΣ ΔΙΑΔΡΟΜΉΣ ΠΡΌΣΒΑΣΗΣ 6.RESALYATION, ΝΈΟΙ ΔΙΆΔΡΟΜΟΙ ΣΤΗΝ ΕΣΩΤΕΡΙΚΉ ΤΡΟΧΙΆ ΤΟΥ ΣΠΗΛΑΊΟΥ 7.ΔΡΟΜΗ ΤΟΥ ΣΥΣΤΉΜΑΤΟΣ ΦΩΤΙΣΜΟΎ ΠΡΌΣΒΑΣΗΣ 8.RESALISATION ΓΙΑ ΤΟΝ ΕΣΩΤΕΡΙΚΌ ΦΩΤΙΣΜΌ ΤΟΥ ΣΠΗΛΑΊΟΥ 9.CARTETLLONISTICA ΜΕ ΈΔΡΑ ΤΟ 10.MONITORING ΤΩΝ ΧΗΜΙΚΏΝ ΚΑΙ ΦΥΣΙΚΏΝ ΠΑΡΑΜΈΤΡΩΝ ΤΟΥ ΣΥΣΤΉΜΑΤΟΣ 11.MONITORING ΓΙΑ ΤΟΝ ΠΡΟΣΔΙΟΡΙΣΜΌ ΤΩΝ ΧΗΜΙΚΏΝ ΚΑΙ ΦΥΣΙΚΏΝ ΠΑΡΑΜΈΤΡΩΝ ΤΟΥ 12.MONITORING ESTABLISHMENT.MONITORING) (Greek)
5 July 2022
0 references
1.COMPLETING I PONOVNA USPOSTAVA PRVOG PRIHVATNOG CENTRA 2.PIDATE, UZ POKRAJINSKU CESTU 3.CONSOLIDATE, PODRUČJA PREKO PRISTUPNOG PUTA 4.CONSOLIDENUTION UNUTAR ŠPILJE 5.RIPRIMISINE POSTOJEĆEG VANJSKOG PRISTUPNOG PUTA 6.RESALYATION, NOVE ŠETNICE U UNUTARNJEM KOLOSIJEKU ŠPILJE 7.PERFORMANCE SUSTAVA RASVJETE PRISTUPNOG 8.RESALISATION SUSTAVA ZA UNUTARNJU RASVJETU ŠPILJE 9.CARTETLLONISTICA SA SJEDIŠTEM U 10.MONITORING KEMIJSKIH I FIZIKALNIH PARAMETARA 11.MONITORING SUSTAVA ZA ODREĐIVANJE KEMIJSKIH I FIZIKALNIH PARAMETARA 12.MONITORING ESTABLISHMENT.MONITORING) (Croatian)
5 July 2022
0 references
1.COMPLETARE SI REINSTALARE A PRIMULUI CENTRU DE RECEPTIE 2.PIDATE, ADIACENT DRUMULUI PROVINCIAL 3.CONSOLIDAT, A ZONEI PESTE CALEA DE ACCES 4.CONSOLIDENȚIE ÎN PEȘTERA 5.RIPRIMISINE A CĂII DE ACCES EXTERNE EXISTENTE 6.RESALIAȚIE, NOI CĂI DE TRECERE PE PISTA INTERIOARĂ A PEȘTERII 7.PERFORMANȚA SISTEMULUI DE ILUMINAT DE ACCES 8.RESALISATION PENTRU ILUMINATUL INTERN AL PEȘTERII 9.CARTETLLONISTICA BAZAT ÎN 10.MONITORING A PARAMETRILOR CHIMICI ȘI FIZICI AI SISTEMULUI 11.MONITORING PENTRU DETERMINAREA PARAMETRILOR CHIMICI ȘI FIZICI AI 12.MONITORING ESTABLISHMENT.MONITORING) (Romanian)
5 July 2022
0 references
1.SPOLOČNOSŤ A OBNOVA PRVÉHO PRIJÍMACIEHO STREDISKA 2.PIDATE, PRIĽAHLEJ K PROVINČNEJ CESTE 3.CONSOLIDATE, AREÁLU NAD PRÍSTUPOVOU CESTOU 4.CONSOLIDENUTION V JASKYNI 5.RIPRIMÍN EXISTUJÚCEJ VONKAJŠEJ PRÍSTUPOVEJ CESTY 6.RESALYATION, NOVÉ CHODNÍKY VO VNÚTORNEJ DRÁHE JASKYNE 7.PERFORMANCE OSVETĽOVACIEHO SYSTÉMU PRÍSTUPOVÉHO PRÍSTUPU 8.RESALISATION SYSTÉM PRE VNÚTORNÉ OSVETLENIE JASKYNE 9.CARTETLLONISTICA SO SÍDLOM V 10.MONITOROVANIE CHEMICKÉ A FYZIKÁLNE PARAMETRE 11.MONITORING SYSTÉMU NA STANOVENIE CHEMICKÝCH A FYZIKÁLNYCH PARAMETROV 12.MONITORING ESTABLISHMENT.MONITORING) (Slovak)
5 July 2022
0 references
1.L-ISPEZZJONI U L-ISTABBILIMENT MILL-ĠDID TA ‘L-EWWEL ĊENTRU TA’ AKKOLJENZA 2.PIDATE, ĦDEJN IT-TRIQ PROVINĊJALI 3.KONSOLIDATA, TAŻ-ŻONA FUQ IL-PASSAĠĠ TA ‘AĊĊESS 4.KONSOLIDAZZJONI FI ĦDAN IL-GROTTA 5.RIPRIMISINE TAL-PASSAĠĠ TA’ AĊĊESS ESTERN EŻISTENTI 6.RESALYATION, PASSAĠĠI ĠODDA FIL-BINARJU TA ‘ĠEWWA TAL-GROTTA 7.PERFORMANCE TAS-SISTEMA TAD-DAWL TA’ AĊĊESS 8.RESALISATION SISTEMA GĦAT-TIDWIL INTERN TAL-GROTTA 9.CARTETLLONISTICA BBAŻATA F’10.MONITORING TA ' IL-PARAMETRI KIMIĊI U FIŻIĊI TAS-SISTEMA TA’ 11.MONITORING GĦAD-DETERMINAZZJONI TAL-PARAMETRI KIMIĊI U FIŻIĊI TA’ L-ESTABLIMENT TAL-MONITORING 12.MONITORING) (Maltese)
5 July 2022
0 references
1.CONCLUSÃO E REESTABELECIMENTO DO PRIMEIRO CENTRO DE RECEPÇÃO 2.PIDATE, AJACENTE À ESTRADA PROVISÓRIA 3.CONSOLIDATE, DA ÁREA SOBRE O PAINEL DE ACESSO 4.CONSOLIDENUÇÃO NA CAVA 5.RIPRIMISINA DO PAINEL DE ACESSO EXTERNO EXTERNO EXISTENTE 6.RESALIZAÇÃO, NOVOS CAMINHOS DE CAVALO 7.PERFORMAÇÃO DO SISTEMA DE ILUMINAÇÃO DO ACESSO 8.RESALIZAÇÃO DO SISTEMA DE ILUMINAÇÃO INTERNA DA CAVA 9.CARTETLLONISTICA BASE NO 10.MONITORIZAÇÃO DOS PARÂMETROS QUÍMICO E FÍSICO DO 11.SISTEMA DE MONITORIZAÇÃO PARA A DETERMINAÇÃO DO PARQUÍMICO E DOS PARQUÍMICOS DO ESTABELAMENTO 12.) (Portuguese)
5 July 2022
0 references
1.COMPLETING JA UUDELLEEN PERUSTAMINEN ENSIMMÄISEN VASTAANOTTOKESKUKSEN 2.PIDATE, VIERESSÄ MAAKUNNALLINEN TIE 3.CONSOLIDATE, ALUEEN YLI KULKUVÄYLÄN 4.KOSKAUKSEN LUOLASSA 5.RIPRIMISINE NYKYISEN ULKOISEN KULKUVÄYLÄN 6.RESALYATION, UUDET KULKUVÄYLÄT SISÄRADALLA LUOLAN 7.PERFORMANCE VALAISTUSJÄRJESTELMÄN 8.RESALISATION JÄRJESTELMÄN SISÄINEN VALAISTUS LUOLA 9.CARTETLLONISTICA PERUSTUU 10.MONITORING 11.MONITORING-JÄRJESTELMÄN KEMIALLISISTA JA FYSIKAALISISTA PARAMETREISTA 12. MONITORING ESTABLISHMENT.MONITORING -JÄRJESTELMÄN KEMIALLISTEN JA FYYSISTEN PARAMETRIEN MÄÄRITTÄMISEKSI (Finnish)
5 July 2022
0 references
1.URUCHOMIENIE I PRZYWRÓCENIE PIERWSZEGO OŚRODKA RECEPCYJNEGO 2.PIDATE, PRZYLEGAJĄCEGO DO DROGI WOJEWÓDZKIEJ 3.CONSOLIDATE, OBSZARU NAD ŚCIEŻKĄ DOJAZDOWĄ 4. CONSOLIDENUTION W JASKINI 5.RIPRIMISINE ISTNIEJĄCEJ ZEWNĘTRZNEJ ŚCIEŻKI DOSTĘPU 6.RESALYATION, NOWE CHODNIKI W TORZE WEWNĘTRZNYM JASKINI 7.PERFORMANCE SYSTEMU OŚWIETLENIA SYSTEMU DOSTĘPU 8.RESALISATION DLA WEWNĘTRZNEGO OŚWIETLENIA JASKINI 9.CARTETLLONISTICA Z SIEDZIBĄ W 10.MONITORING PARAMETRÓW CHEMICZNYCH I FIZYCZNYCH SYSTEMU 11.MONITORING DO OZNACZANIA PARAMETRÓW CHEMICZNYCH I FIZYCZNYCH 12.MONITORING ESTABLISHMENT.MONITORING) (Polish)
5 July 2022
0 references
1.COMPLETING IN PONOVNA VZPOSTAVITEV PRVEGA SPREJEMNEGA CENTRA 2.PIDATE, V BLIŽINI POKRAJINSKE CESTE 3.CONSOLIDATE, OBMOČJA NAD DOSTOPNO POTJO 4.CONSOLIDENUTION ZNOTRAJ JAME 5.RIPRIMISINE OBSTOJEČE ZUNANJE DOSTOPOVNE POTI 6.RESALAATION, NOVE STEZE NA NOTRANJI STEZI JAME 7.PERFORMANCE SISTEMA RAZSVETLJAVE DOSTOPOVNEGA 8.RESALISATION SISTEMA ZA NOTRANJO RAZSVETLJAVO JAME 9.CARTETLLONISTICA S SEDEŽEM V 10.MONITORING KEMIKALIJE IN FIZIKALNI PARAMETRI 11.MONITORING SISTEMA ZA DOLOČANJE KEMIJSKIH IN FIZIKALNIH PARAMETROV 12.MONITORING ESTABLISHMENT.MONITORING) (Slovenian)
5 July 2022
0 references
1.COMPLETING A OBNOVENÍ PRVNÍHO PŘIJÍMACÍHO STŘEDISKA 2.PIDATE, PŘILEHLÉ K PROVINČNÍ SILNICI 3.CONSOLIDATE, OBLASTI NAD PŘÍSTUPOVOU STEZKOU 4.CONSOLIDENUTION V JESKYNI 5.RIPRIMISINE STÁVAJÍCÍ VNĚJŠÍ PŘÍSTUPOVÉ CESTY 6.RESALYATION, NOVÉ CHODNÍKY VE VNITŘNÍ KOLEJI JESKYNĚ 7.PERFORMANCE OSVĚTLOVACÍHO SYSTÉMU PŘÍSTUPOVÉHO SYSTÉMU 8.RESALISATION PRO VNITŘNÍ OSVĚTLENÍ JESKYNĚ 9.CARTETLLONISTICA V 10.MONITORU CHEMICKÉ A FYZIKÁLNÍ PARAMETRY 11.MONITORING SYSTÉMU PRO STANOVENÍ CHEMICKÝCH A FYZIKÁLNÍCH PARAMETRŮ 12.MONITORING ESTABLISHMENT.MONITORING) (Czech)
5 July 2022
0 references
1.BENDROVIMAS IR ATKŪRIMAS PIRMOJO PRIĖMIMO CENTRO 2.PIDATE, GRETA PROVINCIJOS KELIO 3.CONSOLIDATE, IŠ ZONOS VIRŠ PRIEIGOS KELIO 4.CONSOLIDENUTION PER URVAS 5.RIPRIMISINE ESAMO IŠORINIO PRIEIGOS TAKO 6.RESALYATION, NAUJŲ PĖSČIŲJŲ TAKAI VIDINIAME KELYJE URVAS 7.PERFORMANCE APŠVIETIMO SISTEMOS 8.RESALISATION SISTEMA VIDAUS APŠVIETIMO URVAS 9. REMIANTIS 10.MONITORING SISTEMOS CHEMINIŲ IR FIZINIŲ PARAMETRŲ NUSTATYMAS 12.MONITORING 12.MONITORING ESTABLISHMENT.MONITORING) (Lithuanian)
5 July 2022
0 references
1.COMPLETING UN ATJAUNOŠANA PIRMĀ UZŅEMŠANAS CENTRA 2.PIDATE, BLAKUS PROVINCES CEĻA 3.CONSOLIDATE, NO ZONAS PĀRI PIEKĻUVES CEĻA 4.CONSOLIDENUTION IETVAROS ALAS 5.RIPRIMISINE ESOŠĀS ĀRĒJĀS PIEKĻUVES CEĻA 6.RESALYATION, JAUNI CELIŅI IEKŠĒJĀ TRASĒ ALAS 7.PERFORMANCE APGAISMOJUMA SISTĒMAS PIEKĻUVES 8.RESALISATION SISTĒMAS IEKŠĒJĀ APGAISMOJUMA ALAS 9.CARTETLONISTICA ATRODAS 10.MONITORING NO 11.MONITORING SISTĒMAS ĶĪMISKAJIEM UN FIZIKĀLAJIEM PARAMETRIEM 12.MONITORINGESTABLISHMENT.MONITORING ĶĪMISKO UN FIZIKĀLO PARAMETRU NOTEIKŠANAI (Latvian)
5 July 2022
0 references
1.COMPLETING И ВЪЗСТАНОВЯВАНЕ НА ПЪРВИ ПРИЕМЕН ЦЕНТЪР 2.ПИДАТ, В НЕПОСРЕДСТВЕНА БЛИЗОСТ ДО ПРОВИНЦИАЛНИЯ ПЪТ 3.CONSOLIDATE, НА ПЛОЩТА НАД ПЪТЕКАТА ЗА ДОСТЪП 4.CONSOLIDENUTION В ПЕЩЕРАТА 5.RIPRIMISINE НА СЪЩЕСТВУВАЩАТА ВЪНШНА ПЪТЕКА ЗА ДОСТЪП 6.РЕЗАЛИЯЦИЯ, НОВИ ПЪТЕКИ ВЪВ ВЪТРЕШНАТА ПИСТА НА ПЕЩЕРАТА 7.ПЕРФОРМАЦИЯ НА ОСВЕТИТЕЛНАТА СИСТЕМА ЗА ДОСТЪП 8.РЕЗАЙЗАЦИЯ ЗА ВЪТРЕШНО ОСВЕТЛЕНИЕ НА ПЕЩЕРАТА 9.CARTETLLONISTICA СЪС СЕДАЛИЩЕ В ГР. 10.МОНИТОРИРАНЕ НА ХИМИЧНИТЕ И ФИЗИЧНИТЕ ПАРАМЕТРИ НА 11.МОНИТОРИНГ СИСТЕМА ЗА ОПРЕДЕЛЯНЕ НА ХИМИЧНИТЕ И ФИЗИЧНИТЕ ПАРАМЕТРИ НА 12.МОНИТОРЕН ИЗСЛЕДВАНЕ.МОНИТОРИНГ) (Bulgarian)
5 July 2022
0 references
1.AZ ELSŐ FOGADÓKÖZPONT 2.PIDÁTÁSA, A 3.CONSOLIDATE TARTOMÁNYI ÚT MELLETT, A 4. CONSOLIDATE ELÉRÉSI ÚT FELETTI TERÜLETRŐL, A MEGLÉVŐ KÜLSŐ ELÉRÉSI ÚT 6. RENDELKEZÉSE, ÚJ SÉTÁNYOK A 7. BARLANG BELSŐ VÁGÁNYÁN 8.RESALISATION RENDSZER A BARLANG BELSŐ VILÁGÍTÁSÁHOZ 9.CARTETLLONISTICA 10. A 11.MONITORING RENDSZER KÉMIAI ÉS FIZIKAI PARAMÉTEREINEK MEGHATÁROZÁSA A 12. MONITORING ESTABLISHMENT.MONITORING KÉMIAI ÉS FIZIKAI PARAMÉTEREINEK MEGHATÁROZÁSÁRA) (Hungarian)
5 July 2022
0 references
1.COMPLETING AGUS ATH-BHUNÚ AN CHÉAD IONAD FÁILTITHE 2.PIDATE, IN AICE LEIS AN MBÓTHAR CÚIGE 3.CONSOLIDATE, DEN LIMISTÉAR THAR AN COSÁN ROCHTANA 4.CONSIDENUTION LAISTIGH DEN UAIMH 5.RIPRIMISINE DEN CHONAIR ROCHTANA SEACHTRACH ATÁ ANN FAOI LÁTHAIR 6.RESALYATION, SIÚLÓIDÍ NUA I RIAN ISTIGH AN UAIMH 7.PERFORMANCE AN CHÓRAIS SOILSITHE ROCHTANA 8.RESALISATION CÓRAS LE HAGHAIDH SOILSIÚ INMHEÁNACH AN PHLUAIS 9.CARTETLLONISTICA BUNAITHE I 10.MONITORING AN CHÓRAIS SOILSITHE ROCHTANA 8.RESALISATION CÓRAS LE HAGHAIDH SOILSIÚ INMHEÁNACH AN UAIMH 9.CARTETLLONISTICA BUNAITHE I 10. PARAIMÉADAIR CHEIMICEACHA AGUS FHISICEACHA AN CHÓRAIS 11.MONITORING CHUN PARAIMÉADAIR CHEIMICEACHA AGUS FHISICEACHA AN ESTABLISHMENT.MONITORING 12.MONITORING A CHINNEADH) (Irish)
5 July 2022
0 references
1.KOMPLETT OCH ÅTERUPPRÄTTANDE AV FÖRSTA MOTTAGNINGSCENTRUM 2.PIDATE, INTILL LANDSVÄG 3.CONSOLIDATE, AV OMRÅDET ÖVER TILLFARTSLEDEN 4.CONSOLIDENUTION INOM GROTTAN 5.RIPRIMISINE AV DEN BEFINTLIGA EXTERNA TILLFARTSLEDEN 6.RESALYATION, NYA GÅNGVÄGAR I DEN INRE SPÅRET I GROTTAN 7.PERFORMANCE AV BELYSNINGSSYSTEMET FÖR TILLGÅNG 8.RESALISATIONSYSTEM FÖR DEN INRE BELYSNINGEN AV GROTTAN 9.CARTETLLONISTICA BASERAD I 10.MONITORING AV DE KEMISKA OCH FYSIKALISKA PARAMETRARNA I 11.MONITORING-SYSTEMET FÖR BESTÄMNING AV DE KEMISKA OCH FYSIKALISKA PARAMETRARNA I 12.MONITORING ESTABLISHMENT.MONITORING) (Swedish)
5 July 2022
0 references
1.ESIMESE VASTUVÕTUKESKUSE ÜHENDAMINE JA TAASTAMINE 2.PIDATE, MIS PIIRNEB PROVINTSIMAANTEEGA 3.CONSOLIDATE, ALA JUURDEPÄÄSUTEE 4.KONSOLIDUTION KOOPAS 5.RIPRIMISINE OLEMASOLEVA VÄLISE JUURDEPÄÄSUTRAJEKTOORI 6.RESALYATION, UUED KÕNNITEED KOOPA SISEMISEL RAJAL 7.PERFORMANCE VALGUSTUSSÜSTEEMI 8.RESALISATION SÜSTEEMI SISEVALGUSTUS KOOBAS 9.CARTETLLONISTICA PÕHINEB 10.MONITORING SÜSTEEMI 11.MONITORING KEEMILISTEST JA FÜÜSIKALISTEST PARAMEETRITEST 12.MONITORING ESTABLISHMENT.MONITORING KEEMILISTE JA FÜÜSIKALISTE PARAMEETRITE MÄÄRAMISEKS) (Estonian)
5 July 2022
0 references
ALGHERO
0 references
8 April 2023
0 references
Identifiers
G16J17000470008
0 references