CIS ICES (Q1869162)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q1869162 in Italy
Language Label Description Also known as
English
CIS ICES
Project Q1869162 in Italy

    Statements

    0 references
    9,250.0 Euro
    0 references
    18,500.0 Euro
    0 references
    50.0 percent
    0 references
    12 February 2016
    0 references
    5 October 2016
    0 references
    11 November 2016
    0 references
    IC MONTESSORI/RONCO B/SULBIATE
    0 references
    0 references

    45°38'2.40"N, 9°25'14.45"E
    0 references
    LA SOLUZIONE PROPOSTA SI BASA SULLA PIANIFICAZIONE REMOTA REALIZZATA CONSIDERANDO LUTILIZZO DI ACCES POINT WNAP320 GESTITI CENTRALMENTE DA UN WIRELESS CONTROLLER E BASANDOSI SULLE PLANIMETRIE IL NUMERO DI ACCES POINT STIMATI N13 E STATO CALCOLATO IN BASE AD UNA POTENZA DI TRASMISSIONE DEL SEGNALE AL 75 OVVERO 75 MW SUI 100MW MASSIMI DA NORMATIVE VIGENTI E GARANTISCE UNA COPERTURA DELLE ZONE DI INTERESSE CON UN SEGNALE MINIMO DI 75DBM IN MODO DA SUPPORTARE LA NAVIGAZIONE WEB ED EMAILING (Italian)
    0 references
    THE SOLUTION PROPOSED IS BASED ON THE REMOTE PLANNING CARRIED OUT ON THE BASIS OF THE USE OF THE ACCES POINT WNAP320 CENTRALLY MANAGED BY A WIRELESS CONTROLLER AND BASED ON THE PLANS THE NUMBER OF ESTIMATES POINT N13 AND THE STATE CALCULATED ON THE BASIS OF A TRANSMISSION POWER OF THE SIGNAL AT 75 OR 75 MW ON THE MAXIMUM 100 MW FROM EXISTING REGULATIONS AND ENSURES COVERAGE OF AREAS OF INTEREST WITH A MINIMUM SIGNAL OF 75 DBM IN ORDER TO SUPPORT WEB NAVIGATION AND EMAILING. (English)
    0 references
    LA SOLUTION PROPOSÉE EST BASÉE SUR UNE PLANIFICATION À DISTANCE RÉALISÉE COMPTE TENU DE L’UTILISATION DU POINT D’ACCÈS WNAP320 CENTRALISÉEMENT GÉRÉ PAR UN CONTRÔLEUR SANS FIL ET SUR LA BASE DES PLANS LE NOMBRE DE POINTS D’ACCÈS ESTIMÉ N13 ET A ÉTÉ CALCULÉ EN FONCTION D’UNE PUISSANCE DE TRANSMISSION DE SIGNAL 75 MW OU 75 MW MAXIMUM 100 MW PAR LA RÉGLEMENTATION ACTUELLE ET GARANTIT LA COUVERTURE DES ZONES D’INTÉRÊT AVEC UN SIGNAL MINIMUM DE 75DBM AFIN DE SOUTENIR LA NAVIGATION WEB ET L’EMAILING (French)
    10 December 2021
    0 references
    DE VOORGESTELDE OPLOSSING IS GEBASEERD OP PLANNING OP AFSTAND, REKENING HOUDEND MET HET GEBRUIK VAN TOEGANGSPUNT WNAP320 CENTRAAL BEHEERD DOOR EEN DRAADLOZE CONTROLLER EN OP BASIS VAN DE PLANNEN HET AANTAL TOEGANGSPUNTEN GESCHAT N13 EN IS BEREKEND OP BASIS VAN EEN SIGNAALTRANSMISSIEVERMOGEN 75 MW OF 75 MW MAXIMAAL 100 MW DOOR DE HUIDIGE REGELGEVING EN GARANDEERT DEKKING VAN DE AANDACHTSGEBIEDEN MET EEN MINIMUMSIGNAAL VAN 75DBM TER ONDERSTEUNING VAN WEBNAVIGATIE EN E-MAILING (Dutch)
    22 December 2021
    0 references
    DIE VORGESCHLAGENE LÖSUNG BASIERT AUF DER FERNPLANUNG UNTER BERÜCKSICHTIGUNG DER VERWENDUNG VON ZUGANGSPUNKT WNAP320, DIE ZENTRAL VON EINEM DRAHTLOSEN CONTROLLER VERWALTET WIRD, UND BASIERT AUF DEN PLÄNEN DER GESCHÄTZTEN ANZAHL DER ZUGÄNGE N13 UND WURDE NACH EINER SIGNALÜBERTRAGUNGSLEISTUNG VON 75 MW ODER MAXIMAL 75 MW NACH DEN GELTENDEN VORSCHRIFTEN BERECHNET UND GARANTIERT DIE ABDECKUNG DER INTERESSENGEBIETE MIT EINEM MINDESTSIGNAL VON 75DBM, UM WEBNAVIGATION UND E-MAIL ZU UNTERSTÜTZEN. (German)
    23 December 2021
    0 references
    LA SOLUCIÓN PROPUESTA SE BASA EN LA PLANIFICACIÓN REMOTA REALIZADA TENIENDO EN CUENTA EL USO DEL PUNTO DE ACCESO WNAP320 GESTIONADO CENTRALMENTE POR UN CONTROLADOR INALÁMBRICO Y BASADO EN LOS PLANES EL NÚMERO DE PUNTOS DE ACCESO ESTIMADOS N13 Y SE HA CALCULADO DE ACUERDO CON UNA POTENCIA DE TRANSMISIÓN DE SEÑAL 75 MW O 75 MW MÁXIMO 100 MW POR LA NORMATIVA VIGENTE Y GARANTIZA LA COBERTURA DE LAS ÁREAS DE INTERÉS CON UNA SEÑAL MÍNIMA DE 75DBM CON EL FIN DE APOYAR LA NAVEGACIÓN WEB Y EL CORREO ELECTRÓNICO (Spanish)
    23 January 2022
    0 references
    DEN FORESLÅEDE LØSNING ER BASERET PÅ FJERNPLANLÆGNING UDFØRT PÅ GRUNDLAG AF ANVENDELSEN AF ACCES-PUNKTET WNAP320 CENTRALT STYRET AF EN TRÅDLØS CONTROLLER OG BASERET PÅ PLANERNE ANTALLET AF ESTIMATER PUNKT N13 OG STATEN BEREGNET PÅ GRUNDLAG AF EN TRANSMISSION EFFEKT AF SIGNALET PÅ 75 ELLER 75 MW PÅ DEN MAKSIMALE 100 MW FRA EKSISTERENDE REGLER OG SIKRER DÆKNING AF INTERESSEOMRÅDER MED ET MINIMUM SIGNAL PÅ 75 DBM FOR AT UNDERSTØTTE WEBNAVIGATION OG E-MAIL. (Danish)
    3 July 2022
    0 references
    Η ΠΡΟΤΕΙΝΌΜΕΝΗ ΛΎΣΗ ΒΑΣΊΖΕΤΑΙ ΣΤΟΝ ΑΠΟΜΑΚΡΥΣΜΈΝΟ ΣΧΕΔΙΑΣΜΌ ΠΟΥ ΠΡΑΓΜΑΤΟΠΟΙΕΊΤΑΙ ΜΕ ΒΆΣΗ ΤΗ ΧΡΉΣΗ ΤΟΥ ΣΗΜΕΊΟΥ ΠΡΌΣΒΑΣΗΣ WNAP320 ΠΟΥ ΔΙΑΧΕΙΡΊΖΕΤΑΙ ΚΕΝΤΡΙΚΆ ΈΝΑΣ ΑΣΎΡΜΑΤΟΣ ΕΛΕΓΚΤΉΣ ΚΑΙ ΜΕ ΒΆΣΗ ΤΑ ΣΧΈΔΙΑ ΤΟΝ ΑΡΙΘΜΌ ΤΩΝ ΕΚΤΙΜΉΣΕΩΝ ΤΟΥ ΣΗΜΕΊΟΥ N13 ΚΑΙ ΤΟΥ ΚΡΆΤΟΥΣ ΠΟΥ ΥΠΟΛΟΓΊΖΕΤΑΙ ΜΕ ΒΆΣΗ ΤΗΝ ΙΣΧΎ ΜΕΤΆΔΟΣΗΣ ΤΟΥ ΣΉΜΑΤΟΣ 75 Ή 75 MW ΜΕ ΜΈΓΙΣΤΗ ΙΣΧΎ 100 MW ΑΠΌ ΤΟΥΣ ΥΦΙΣΤΆΜΕΝΟΥΣ ΚΑΝΟΝΙΣΜΟΎΣ ΚΑΙ ΕΞΑΣΦΑΛΊΖΕΙ ΤΗΝ ΚΆΛΥΨΗ ΠΕΡΙΟΧΏΝ ΕΝΔΙΑΦΈΡΟΝΤΟΣ ΜΕ ΕΛΆΧΙΣΤΟ ΣΉΜΑ 75 DBM ΓΙΑ ΤΗΝ ΥΠΟΣΤΉΡΙΞΗ ΤΗΣ ΠΛΟΉΓΗΣΗΣ ΣΤΟ ΔΙΑΔΊΚΤΥΟ ΚΑΙ ΤΗΣ ΗΛΕΚΤΡΟΝΙΚΉΣ ΑΛΛΗΛΟΓΡΑΦΊΑΣ. (Greek)
    3 July 2022
    0 references
    PREDLOŽENO RJEŠENJE TEMELJI SE NA PLANIRANJU NA DALJINU PROVEDENOM NA TEMELJU UPORABE TOČKE PRISTUPA WNAP320 KOJOM CENTRALNO UPRAVLJA BEŽIČNI KONTROLER I NA TEMELJU PLANOVA BROJ PROCJENA TOČKE N13 I DRŽAVE IZRAČUNATE NA TEMELJU SNAGE PRIJENOSA SIGNALA OD 75 ILI 75 MW NA MAKSIMALNO 100 MW IZ POSTOJEĆIH PROPISA I OSIGURAVA POKRIVENOST PODRUČJA INTERESA S MINIMALNIM SIGNALOM OD 75 DBM KAKO BI SE PODRŽALA WEB NAVIGACIJA I SLANJE E-POŠTE. (Croatian)
    3 July 2022
    0 references
    SOLUȚIA PROPUSĂ SE BAZEAZĂ PE PLANIFICAREA DE LA DISTANȚĂ EFECTUATĂ PE BAZA UTILIZĂRII PUNCTULUI DE ACCES WNAP320 GESTIONAT LA NIVEL CENTRAL DE UN CONTROLER FĂRĂ FIR ȘI PE BAZA PLANURILOR NUMĂRUL DE ESTIMĂRI DE LA PUNCTUL N13 ȘI DE STAT CALCULAT PE BAZA UNEI PUTERI DE TRANSMISIE A SEMNALULUI LA 75 SAU 75 MW LA MAXIMUM 100 MW DIN REGLEMENTĂRILE EXISTENTE ȘI ASIGURĂ ACOPERIREA ZONELOR DE INTERES CU UN SEMNAL MINIM DE 75 DBM PENTRU A SPRIJINI NAVIGAREA PE INTERNET ȘI E-MAILURILE. (Romanian)
    3 July 2022
    0 references
    NAVRHOVANÉ RIEŠENIE JE ZALOŽENÉ NA DIAĽKOVOM PLÁNOVANÍ VYKONÁVANOM NA ZÁKLADE POUŽITIA PRÍSTUPOVÉHO BODU WNAP320 CENTRÁLNE RIADENÉHO BEZDRÔTOVÝM REGULÁTOROM A NA ZÁKLADE PLÁNOV NA ZÁKLADE POČTU ODHADOV BODU N13 A ŠTÁTU VYPOČÍTANÉHO NA ZÁKLADE VYSIELACIEHO VÝKONU SIGNÁLU PRI 75 ALEBO 75 MW NA MAXIMÁLNOM 100 MW Z EXISTUJÚCICH PREDPISOV A ZABEZPEČUJE POKRYTIE OBLASTÍ ZÁUJMU S MINIMÁLNYM SIGNÁLOM 75 DBM S CIEĽOM PODPORIŤ WEBOVÚ NAVIGÁCIU A E-MAIL. (Slovak)
    3 July 2022
    0 references
    IS-SOLUZZJONI PROPOSTA HIJA BBAŻATA FUQ L-IPPJANAR MILL-BOGĦOD IMWETTAQ FUQ IL-BAŻI TAL-UŻU TAL-PUNT WNAP320 ĠESTIT ĊENTRALMENT MINN KONTROLLUR BLA FILI U BBAŻAT FUQ IL-PJANIJIET IN-NUMRU TA’ STIMI TAL-PUNT N13 U L-ISTAT IKKALKULAT FUQ IL-BAŻI TA’ QAWWA TA’ TRAŻMISSJONI TAS-SINJAL TA’ 75 JEW 75 MW FUQ IL-MASSIMU TA’ 100 MW MIR-REGOLAMENTI EŻISTENTI U JIŻGURA L-KOPERTURA TA’ ŻONI TA’ INTERESS B’SINJAL MINIMU TA’ 75 DBM SABIEX JAPPOĠĠA N-NAVIGAZZJONI FUQ L-INTERNET U L-POSTA ELETTRONIKA. (Maltese)
    3 July 2022
    0 references
    A SOLUÇÃO PROPOSTA BASEIA-SE NO PLANEAMENTO À DISTÂNCIA EFETUADO COM BASE NA UTILIZAÇÃO DO PONTO DE ACESSO WNAP320 GERIDO CENTRALMENTE POR UM CONTROLADOR SEM FIOS E COM BASE NOS PLANOS, O NÚMERO DE ESTIMATIVAS PONTO N13 E O ESTADO CALCULADO COM BASE NUMA POTÊNCIA DE TRANSMISSÃO DO SINAL A 75 OU 75 MW NO MÁXIMO 100 MW A PARTIR DOS REGULAMENTOS EXISTENTES E GARANTE A COBERTURA DAS ÁREAS DE INTERESSE COM UM SINAL MÍNIMO DE 75 DBM, A FIM DE APOIAR A NAVEGAÇÃO NA WEB E O CORREIO ELETRÓNICO. (Portuguese)
    3 July 2022
    0 references
    EHDOTETTU RATKAISU PERUSTUU ETÄSUUNNITTELUUN, JOKA PERUSTUU LANGATTOMAN OHJAIMEN KESKITETYSTI HALLINNOIMAN LIITYNTÄPISTEEN WNAP320 KÄYTTÖÖN JA JOKA PERUSTUU SUUNNITELMIIN JA JOKA PERUSTUU ESTIMAATTEIHIN N13 JA VALTIO, JOKA ON LASKETTU SIGNAALIN SIIRTOTEHON PERUSTEELLA 75 MW:N TAI 75 MW:N ENIMMÄISTEHOLLA 100 MW:N ENIMMÄISTEHOLLA VOIMASSA OLEVISTA SÄÄNNÖKSISTÄ, JA VARMISTAA, ETTÄ KIINNOSTAVAT ALUEET KATETAAN VÄHINTÄÄN 75 DBM:N SIGNAALILLA, JOTTA VOIDAAN TUKEA VERKKONAVIGOINTIA JA SÄHKÖPOSTIA. (Finnish)
    3 July 2022
    0 references
    PROPONOWANE ROZWIĄZANIE OPIERA SIĘ NA ZDALNYM PLANOWANIU PRZEPROWADZONYM NA PODSTAWIE WYKORZYSTANIA PUNKTU DOSTĘPOWEGO WNAP320 ZARZĄDZANEGO CENTRALNIE PRZEZ KONTROLER BEZPRZEWODOWY I W OPARCIU O PLANY LICZBY OSZACOWAŃ PUNKTU N13 I PAŃSTWA OBLICZONEGO NA PODSTAWIE MOCY PRZESYŁOWEJ SYGNAŁU O MOCY 75 LUB 75 MW NA MAKSYMALNYM 100 MW ZGODNIE Z OBOWIĄZUJĄCYMI PRZEPISAMI ORAZ ZAPEWNIA POKRYCIE OBSZARÓW ZAINTERESOWANIA PRZY MINIMALNYM SYGNALE 75 DBM W CELU WSPARCIA NAWIGACJI INTERNETOWEJ I POCZTY ELEKTRONICZNEJ. (Polish)
    3 July 2022
    0 references
    PREDLAGANA REŠITEV TEMELJI NA NAČRTOVANJU NA DALJAVO, KI SE IZVAJA NA PODLAGI UPORABE TOČKE WNAP320, KI JO CENTRALNO UPRAVLJA BREZŽIČNI KRMILNIK, IN NA PODLAGI NAČRTOV ŠTEVILA OCEN TOČKE N13 IN DRŽAVE, IZRAČUNANE NA PODLAGI PRENOSNE MOČI SIGNALA PRI 75 ALI 75 MW NA NAJVEČ 100 MW IZ OBSTOJEČIH PREDPISOV, TER ZAGOTAVLJA POKRITOST INTERESNIH PODROČIJ Z MINIMALNIM SIGNALOM 75 DBM ZA PODPORO SPLETNI NAVIGACIJI IN POŠILJANJU E-POŠTE. (Slovenian)
    3 July 2022
    0 references
    NAVRHOVANÉ ŘEŠENÍ VYCHÁZÍ Z DÁLKOVÉHO PLÁNOVÁNÍ PROVÁDĚNÉHO NA ZÁKLADĚ VYUŽITÍ PŘÍSTUPOVÉHO BODU WNAP320 CENTRÁLNĚ ŘÍZENÉHO BEZDRÁTOVÝM ŘÍDÍCÍM ZAŘÍZENÍM A NA ZÁKLADĚ PLÁNŮ POČET ODHADOVANÝCH BODŮ N13 A STÁTU VYPOČTENÝ NA ZÁKLADĚ PŘENOSOVÉHO VÝKONU SIGNÁLU 75 NEBO 75 MW NA MAXIMÁLNÍM 100 MW ZE STÁVAJÍCÍCH PŘEDPISŮ A ZAJIŠŤUJE POKRYTÍ ZÁJMOVÝCH OBLASTÍ S MINIMÁLNÍM SIGNÁLEM 75 DBM ZA ÚČELEM PODPORY WEBOVÉ NAVIGACE A E-MAILOVÁNÍ. (Czech)
    3 July 2022
    0 references
    SIŪLOMAS SPRENDIMAS GRINDŽIAMAS NUOTOLINIU PLANAVIMU, ATLIEKAMU REMIANTIS PRIEIGOS TAŠKO WNAP320 NAUDOJIMU, KURĮ CENTRALIZUOTAI VALDO BELAIDIS VALDIKLIS, IR REMIANTIS PLANAIS, KIEK APYTIKSLIŲ TAŠKŲ N13 IR VALSTYBĖ APSKAIČIUOJAMA REMIANTIS 75 MW ARBA 75 MW SIGNALO PERDAVIMO GALIA, ATSIŽVELGIANT Į DIDŽIAUSIĄ 100 MW GALIĄ PAGAL GALIOJANČIAS TAISYKLES, IR UŽTIKRINA, KAD DOMINANČIOS TERITORIJOS APRĖPTIS BŪTŲ NE MAŽESNĖ KAIP 75 DBM, KAD BŪTŲ GALIMA PALAIKYTI NARŠYMĄ ŽINIATINKLYJE IR EL. PAŠTO SIUNTIMĄ. (Lithuanian)
    3 July 2022
    0 references
    IEROSINĀTAIS RISINĀJUMS IR BALSTĪTS UZ ATTĀLINĀTO PLĀNOŠANU, KAS VEIKTA, PAMATOJOTIES UZ ACCES PUNKTA WNAP320 IZMANTOŠANU, KO CENTRALIZĒTI PĀRVALDA BEZVADU KONTROLIERIS, UN PAMATOJOTIES UZ PLĀNIEM PAR N13 PUNKTA APLĒSĒM UN VALSTI, KAS APRĒĶINĀTA, PAMATOJOTIES UZ SIGNĀLA PĀRRAIDES JAUDU 75 VAI 75 MW UZ MAKSIMĀLO 100 MW SASKAŅĀ AR SPĒKĀ ESOŠAJIEM NOTEIKUMIEM, UN NODROŠINA INTEREŠU ZONU PĀRKLĀJUMU AR MINIMĀLO SIGNĀLU 75 DBM, LAI ATBALSTĪTU TĪMEKĻA NAVIGĀCIJU UN E-PASTU. (Latvian)
    3 July 2022
    0 references
    ПРЕДЛОЖЕНОТО РЕШЕНИЕ СЕ ОСНОВАВА НА ДИСТАНЦИОННОТО ПЛАНИРАНЕ, ИЗВЪРШЕНО ВЪЗ ОСНОВА НА ИЗПОЛЗВАНЕТО НА ТОЧКАТА НА ПРИСЪЕДИНЯВАНЕ WNAP320, УПРАВЛЯВАНА ЦЕНТРАЛНО ОТ БЕЗЖИЧЕН КОНТРОЛЕР, И ВЪЗ ОСНОВА НА ПЛАНОВЕТЕ — БРОЯ НА ПРОГНОЗНИТЕ ТОЧКИ N13 И ДЪРЖАВАТА, ИЗЧИСЛЕНА ВЪЗ ОСНОВА НА МОЩНОСТ ЗА ПРЕДАВАНЕ НА СИГНАЛА ПРИ 75 ИЛИ 75 MW ПРИ МАКСИМУМ 100 MW ОТ СЪЩЕСТВУВАЩИТЕ РАЗПОРЕДБИ, И ОСИГУРЯВА ПОКРИТИЕ НА ОБЛАСТИТЕ ОТ ИНТЕРЕС С МИНИМАЛЕН СИГНАЛ ОТ 75 DBM, ЗА ДА СЕ ПОДПОМОГНЕ УЕБ НАВИГАЦИЯТА И ИЗПРАЩАНЕТО ПО ЕЛЕКТРОННА ПОЩА. (Bulgarian)
    3 July 2022
    0 references
    A JAVASOLT MEGOLDÁS A WNAP320 CSATLAKOZÓPONT VEZETÉK NÉLKÜLI VEZÉRLŐ ÁLTAL KÖZPONTILAG IRÁNYÍTOTT HASZNÁLATA ALAPJÁN VÉGZETT TÁVTERVEZÉSEN ALAPUL, A TERVEKEN ALAPULVA AZ N13-AS BECSLÉSI PONT ÉS AZ ÁLLAM ÁLTAL A 75 MW-OS VAGY 75 MW-OS JELÁTVITELI TELJESÍTMÉNY ALAPJÁN SZÁMÍTOTT, A MEGLÉVŐ SZABÁLYOZÁS SZERINTI MAXIMÁLIS 100 MW-OS JELÁTVITELI TELJESÍTMÉNY ALAPJÁN, ÉS BIZTOSÍTJA AZ ÉRDEKLŐDÉSI TERÜLETEK LEFEDETTSÉGÉT LEGALÁBB 75 DBM JELLEL A WEBES NAVIGÁCIÓ ÉS AZ E-MAILEZÉS TÁMOGATÁSA ÉRDEKÉBEN. (Hungarian)
    3 July 2022
    0 references
    TÁ AN RÉITEACH ATÁ BEARTAITHE BUNAITHE AR AN GCIANPHLEANÁIL A DHÉANTAR AR BHONN ÚSÁID AN PHOINTE ROCHTANA WNAP320 ARNA BHAINISTIÚ GO LÁRNACH AG RIALAITHEOIR GAN SREANG AGUS BUNAITHE AR NA PLEANANNA LÍON NA MEASTACHÁN POINTE N13 AGUS AN STÁT ARNA RÍOMH AR BHONN CUMHACHT TARCHURTHA AN CHOMHARTHA AG 75 NÓ 75 MW AR AN UASMHÉID 100 MW Ó NA RIALACHÁIN ATÁ ANN CHEANA AGUS ÁIRITHÍTEAR LEIS CUMHDACH NA LIMISTÉAR SPÉISE LE COMHARTHA ÍOSTA 75 DBM CHUN TACÚ LE LOINGSEOIREACHT GRÉASÁIN AGUS RÍOMHPHOST. (Irish)
    3 July 2022
    0 references
    DEN FÖRESLAGNA LÖSNINGEN BYGGER PÅ DEN FJÄRRPLANERING SOM UTFÖRS PÅ GRUNDVAL AV ANVÄNDNINGEN AV ACCES-PUNKTEN WNAP320 CENTRALT FÖRVALTAD AV EN TRÅDLÖS STYRENHET OCH PÅ GRUNDVAL AV PLANERNA ANTALET UPPSKATTNINGAR PUNKT N13 OCH STATEN BERÄKNAT PÅ GRUNDVAL AV EN ÖVERFÖRINGSEFFEKT FÖR SIGNALEN PÅ 75 ELLER 75 MW PÅ MAXIMALT 100 MW ENLIGT BEFINTLIGA BESTÄMMELSER OCH SÄKERSTÄLLER TÄCKNING AV INTRESSEOMRÅDEN MED EN MINSTA SIGNAL PÅ 75 DBM FÖR ATT STÖDJA WEBBNAVIGERING OCH E-POST. (Swedish)
    3 July 2022
    0 references
    PAKUTUD LAHENDUS PÕHINEB KAUGPLANEERIMISEL, MIS VIIAKSE LÄBI TRAADITA KONTROLLERI POOLT TSENTRAALSELT HALLATAVA ACCES-PUNKTI WNAP320 KASUTAMISE ALUSEL, NING PLAANIDE PÕHJAL, KUI PALJU HINNANGULISI PUNKTE N13 JA RIIK ARVUTATAKSE SIGNAALI EDASTUSVÕIMSUSE ALUSEL 75 MW VÕI 75 MW JUURES MAKSIMAALSELT 100 MW KEHTIVATEST EESKIRJADEST, NING TAGAB HUVIPAKKUVATE ALADE KATVUSE MINIMAALSE SIGNAALIGA 75 DBM, ET TOETADA VEEBI NAVIGEERIMIST JA E-POSTI SAATMIST. (Estonian)
    3 July 2022
    0 references
    SULBIATE
    0 references
    9035 del 13/07/2015 - FESR - Realizzazione/ampliamento LAN/WLAN
    0 references

    Identifiers