Revitalisation Old Town Estate in Golina (Q137060)

From EU Knowledge Graph
Jump to navigation Jump to search
Project Q137060 in Poland
Language Label Description Also known as
English
Revitalisation Old Town Estate in Golina
Project Q137060 in Poland

    Statements

    0 references
    3,035,572.02 zloty
    0 references
    674,807.66 Euro
    13 January 2020
    0 references
    4,047,429.37 zloty
    0 references
    899,743.55 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    13 June 2019
    0 references
    26 February 2021
    0 references
    GMINA GOLINA
    0 references
    0 references

    52°31'26.00"N, 16°18'54.00"E
    0 references
    Przedmiotem projektu jest rewitalizacja Os.Starówka w Gm.Golina,w wyniku której planuje się realizację dwóch najbardziej priorytetowych zadań ujętych w Lokalnym Programie Rewitalizacji (LPR) Gminy na lata 2017-2023 tj: 1.„Nadanie nowej funkcji budynkowi po byłej restauracji Smakosz”–zakres prac obejmuje przebudowę,rozbudowę i zmianę sposobu użytkowania budynku usługowego na budynek użyteczności publicznej z przeznaczeniem na usługi społeczne i edukacyjno-kulturalne związane z zaspokajaniem zbiorowych potrzeb wspólnot.Obiekt znajduje się w układzie urbanistycznym wpisanym do gminnej ewidencji zabytków.2.„Rewitalizacja zabytkowego Parku Miejskiego w Golinie”wpisanego do Rejestru Zabytków 3 kwietnia 1990 r. pod nr A-437/179 w zakresie poprawy funkcjonalności przestrzeni publicznej i nadania nowej funkcji rewitalizowanemu terenowi poprzez zagospodarowanie układu przestrzennego i komunikacyjnego,nowe nasadzenia,montaż elementów wyposażenia,małej architektury,oświetlenia,letniej sceny z pergolą,wymiany urządzeń na placu zabaw,ścieżki edukacyjnej.Wdrożenie działań zmierzających do osiągnięcia celów strategicznych umożliwi integrację oraz aktywizację mieszkańców obszaru rewitalizacji,a także podniesienie ich komfortu i bezpieczeństwa bez względu na wiek czy inne czynniki socjodemograficzne.Projekt skierowany zostanie do szerokiej grupy odbiorców indywidualnych i instytucjonalnych.Wartość projektu: 5 372 292,40 zł (wydatki kwalifikowalne: 4 413 713,51 zł), w tym:-dofinansowanie z EFRR: 3 750 088,23 zł-wkład własny: 661 780,28 złWskaźniki produktu planowane do osiągnięcia w 2020 roku:Powierzchnia obszarów objętych rewitalizacją - 9,26 haLiczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami – 1,0 szt. Liczba wspartych obiektów infrastruktury zlokalizowanych na rewitalizowanych obszarach – 1,0 szt. Otwarta przestrzeń utworzona lub rekultywowana na obszarach miejskich – 92199,00 m2Udział projektu w odniesieniu do obszaru objętego programem rewitalizacji – 0,09% (Polish)
    0 references
    The subject of the project is the revitalisation of Os.Starówka in Gm.Golina, as a result of which the two most priority tasks included in the Local Regeneration Programme (LPR) of the Municipality for the years 2017-2023 are planned, i.e.: 1.Assigning a new function to the building after the former restaurant Smakosz' – the scope of the works includes the conversion, extension and change of use of the service building to a public utility building intended for social and educational and cultural services related to meeting the collective needs of the communities. PLN 5 372 292,40 (eligible expenditure: PLN 4 413 713.51), including:-funding from the ERDF: 3 750 088,23 PLN-own contribution: 661 780,28 złProduct indicators planned to be achieved in 2020:Area of areas subject to revitalisation – 9,26 haNumber of facilities tailored to the needs of people with disabilities – 1,0 pieces. Number of supported infrastructure facilities located in revitalised areas – 1,0 pieces. Open space created or rehabilitated in urban areas – 92199,00 m2Project share in the area covered by the revitalisation programme – 0,09 % (English)
    21 October 2020
    0.6893442914882355
    0 references
    Le projet a pour objet la revitalisation d’Os.Starówka à Gm.Golina, à la suite de laquelle les deux tâches les plus prioritaires incluses dans le programme de revitalisation locale de la municipalité pour 2017-2023 sont prévues: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (dépenses éligibles: PLN 4 413 713,51), y compris:- cofinancement par le FEDER: 3 750 088,23 PLN — Contribution propre: 661 780,28 złIndicateurs de produits prévus pour 2020: La zone des zones couvertes par la revitalisation — 9,26 ha Nombre d’installations adaptées aux besoins des personnes handicapées — 1,0 pcs. Nombre d’installations d’infrastructure soutenues situées dans des zones revitalisées — 1,0 PCs. Espace ouvert créé ou restauré dans les zones urbaines — 92199,00 m2Part du projet pour la zone couverte par le programme de revitalisation — 0,09 % (French)
    2 December 2021
    0 references
    Gegenstand des Projekts ist die Wiederbelebung von Os.Starówka in Gm.Golina, wodurch die beiden vorrangigsten Aufgaben des lokalen Revitalisierungsprogramms (LPR) der Gemeinde 2017-2023 geplant sind: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (zuschussfähige Ausgaben: 4 413 713,51 PLN, einschließlich:- Kofinanzierung aus dem EFRE: 3 750 088,23 PLN-eigener Beitrag: 661 780,28 złProduktindikatoren sollen 2020 erreicht werden:Der Bereich der von der Revitalisierung abgedeckten Gebiete – 9,26 haAnzahl der an die Bedürfnisse von Menschen mit Behinderungen angepassten Einrichtungen – 1,0 Stk. Anzahl der unterstützten Infrastruktureinrichtungen in revitalisierten Gebieten – 1,0 Stk. Freiflächen in städtischen Gebieten geschaffen oder restauriert – 92199,00 m2Projektanteil für das Revitalisierungsprogramm – 0,09 % (German)
    13 December 2021
    0 references
    Het onderwerp van het project is de revitalisering van Os.Starówka in Gm.Golina, waardoor de twee prioritaire taken in het Local Revitalisation Program (LPR) van de gemeente voor 2017-2023 zijn gepland: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (subsidiabele uitgaven: 4 413 713,51) PLN, met inbegrip van:- medefinanciering uit het EFRO: 3 750 088.23 PLN-eigen bijdrage: 661 780,28 złProductindicatoren die naar verwachting in 2020 zullen worden verwezenlijkt: Het gebied van gebieden die onder revitalisering vallen — 9,26 haAantal voorzieningen aangepast aan de behoeften van mensen met een handicap — 1,0 stuks. Aantal ondersteunde infrastructuurvoorzieningen in gerevitaliseerde gebieden — 1,0 stuks. Open ruimte gecreëerd of gerestaureerd in stedelijke gebieden — 92199,00 m2Projectaandeel voor het revitalisatieprogrammagebied — 0,09 % (Dutch)
    17 December 2021
    0 references
    Oggetto del progetto è la rivitalizzazione di Os.Starówka a Gm.Golina, grazie alla quale sono previsti i due compiti più prioritari inclusi nel Programma di Rivitalizzazione Locale (LPR) del Comune per il periodo 2017-2023: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the PLN 5 372 292,40 (spese ammissibili: PLN 4 413 713,51 PLN, tra cui:- cofinanziamento da parte del FESR: 3 750 088.23 PLN-proprio contributo: 661 780,28 złIndicatori di prodotto previsti per il 2020:L'area delle aree coperte da rivitalizzazione — 9,26 haNumero di strutture adattate alle esigenze delle persone con disabilità — 1,0 pz. Numero di infrastrutture supportate situate in aree rivitalizzate — 1,0 pz. Spazio aperto creato o restaurato in aree urbane — 92199,00 m2Partecipazione del progetto per l'area del programma di rivitalizzazione — 0,09 % (Italian)
    15 January 2022
    0 references
    El tema del proyecto es la revitalización de Os.Starówka en Gm.Golina, como resultado de lo cual se planifican las dos tareas más prioritarias incluidas en el Programa de Revitalización Local (LPR) del Municipio para 2017-2023: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (gastos subvencionables: 4 413 713,51 PLN, incluida la cofinanciación del FEDER: 3 750 088,23 PLN — contribución propia: 661 780,28 złIndicadores del producto previstos para 2020:El ámbito de las áreas cubiertas por la revitalización — 9,26 haNúmero de instalaciones adaptadas a las necesidades de las personas con discapacidad — 1,0 unidades. Número de instalaciones de infraestructura apoyadas ubicadas en áreas revitalizadas — 1,0 unidades. Espacio abierto creado o restaurado en zonas urbanas — 92199,00 m2Parte del proyecto para el área del programa de revitalización — 0,09 % (Spanish)
    19 January 2022
    0 references
    Projektets emne er revitalisering af Os.Starówka i Gm.Golina, hvilket betyder, at de to mest prioriterede opgaver, der indgår i kommunens lokale revitaliseringsprogram (LPR) for 2017-2023, planlægges: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (støtteberettigede udgifter: 4 413 713,51) PLN, herunder:- samfinansiering fra EFRU: 3 750 088,23 PLN-egenbidrag: 661 780,28 złProduktindikatorer planlagt til at blive opnået i 2020:De områder, der er omfattet af revitalisering — 9,26 haAntal faciliteter, der er tilpasset behovene hos personer med handicap — 1,0 stk. Antal understøttede infrastrukturanlæg beliggende i revitaliserede områder — 1,0 stk. Åbent rum skabt eller restaureret i byområder — 92199,00 m2Projektandel for revitaliseringsprogramområdet — 0,09 % (Danish)
    3 July 2022
    0 references
    Αντικείμενο του έργου είναι η αναζωογόνηση της Os.Starówka στην Gm.Golina, με αποτέλεσμα να προγραμματίζονται τα δύο σημαντικότερα καθήκοντα προτεραιότητας που περιλαμβάνονται στο Τοπικό Πρόγραμμα Αναζωογόνησης (LPR) του Δήμου για την περίοδο 2017-2023: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (επιλέξιμες δαπάνες: 4 413 713,51 PLN, μεταξύ των οποίων:- συγχρηματοδότηση από το ΕΤΠΑ: 3 750 088.23 PLN ίδια συνεισφορά: 661 780,28 złΔείκτες προϊόντος που προβλέπεται να επιτευχθούν το 2020: Ο τομέας των περιοχών που καλύπτονται από την αναζωογόνηση — 9,26 haΑαριθμός εγκαταστάσεων προσαρμοσμένες στις ανάγκες των ατόμων με αναπηρία — 1,0 τεμ. Αριθμός υποστηριζόμενων υποδομών που βρίσκονται σε αναζωογονημένες περιοχές — 1,0 τεμ. Ανοικτός χώρος που δημιουργήθηκε ή αποκαταστάθηκε σε αστικές περιοχές — 92199,00 m2Μερίδιο έργου για την περιοχή του προγράμματος αναζωογόνησης — 0,09 % (Greek)
    3 July 2022
    0 references
    Predmet projekta je revitalizacija Os.Starówke u Gm.Golini, zbog čega su planirane dvije prioritetne zadaće uključene u Program lokalne revitalizacije (LPR) Općine za razdoblje 2017. – 2023.: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (prihvatljivi rashodi: 4 413 713,51 PLN, uključujući:- sufinanciranje iz EFRR-a: 3 750 088,23 PLN vlastiti doprinos: 661 780,28 ZłPokazatelji proizvoda planirani su za 2020.: Područje područja obuhvaćenih revitalizacijom – 9,26 haBroj objekata prilagođenih potrebama osoba s invaliditetom – 1,0 kom. Broj infrastrukturnih objekata kojima je dodijeljena potpora u revitaliziranim područjima – 1,0 kom. Otvoreni prostor stvoren ili obnovljen u urbanim područjima – 92199,00 m2Udio projekta za programsko područje revitalizacije – 0,09 % (Croatian)
    3 July 2022
    0 references
    Obiectul proiectului este revitalizarea Os.Starówka în Gm.Golina, în urma căreia sunt planificate cele două sarcini prioritare incluse în Programul de Revitalizare Locală (LPR) al Municipiului pentru perioada 2017-2023: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (cheltuieli eligibile: 4 413 713,51 PLN), inclusiv:- cofinanțare din FEDR: 3 750 088,23 PLN – contribuție proprie: 661 780,28 złIndicatori de produs prevăzuți a fi realizați în 2020:Aria zonelor acoperite de revitalizare – 9,26 haNumăr de facilități adaptate nevoilor persoanelor cu handicap – 1,0 buc. Numărul de instalații de infrastructură sprijinite situate în zone revitalizate – 1,0 buc. Spațiu deschis creat sau restaurat în zonele urbane – 92199,00 m2Cotă de proiect pentru zona programului de revitalizare – 0,09 % (Romanian)
    3 July 2022
    0 references
    Predmetom projektu je revitalizácia Os.Starówka v Gm.Golina, v dôsledku čoho sú naplánované dve prioritné úlohy zahrnuté v programe miestnej revitalizácie (LPR) obce na roky 2017 – 2023: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (oprávnené výdavky: 4 413 713,51 PLN vrátane:- spolufinancovania z EFRR: 3 750 088.23 PLN vlastný príspevok: 661 780,28 zł Ukazovatele produktu plánované na rok 2020: Plocha oblastí pokrytých revitalizáciou – 9,26 haPočet zariadení prispôsobených potrebám ľudí so zdravotným postihnutím – 1,0 ks. Počet podporovaných infraštruktúrnych zariadení umiestnených v revitalizovaných oblastiach – 1,0 ks. Otvorený priestor vytvorený alebo obnovený v mestských oblastiach – 92 199,00 m² Podiel projektu pre oblasť programu revitalizácie – 0,09 % (Slovak)
    3 July 2022
    0 references
    Is-suġġett tal-proġett huwa r-rivitalizzazzjoni ta’ Os.Starówka f’Gm.Golina, li b’riżultat ta’ dan huma ppjanati l-aktar żewġ kompiti prijoritarji inklużi fil-Programm ta’ Rivitalizzazzjoni Lokali (LPR) tal-Muniċipalità għall-2017–2023: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the PLN 5 372 292.40 (nefqa eliġibbli: PLN 4 413 713.51), inkluż:- kofinanzjament mill-FEŻR: 3 750 088.23 kontribuzzjoni proprja ta’ PLN: 661 780,28 Indikaturi tal-prodotti ppjanati li jinkisbu fl-2020:Il-qasam tal-oqsma koperti mir-rivitalizzazzjoni — 9.26 haNumru ta’ faċilitajiet adattati għall-ħtiġijiet tal-persuni b’diżabilità — 1.0 biċċa. Numru ta ‘faċilitajiet ta’ infrastruttura appoġġjati li jinsabu f’żoni revitalized — 1.0 biċċa. Spazju miftuħ maħluq jew restawrat f’żoni urbani — 92199,00 m2Is-sehem tal-proġett għaż-żona tal-programm ta’ rivitalizzazzjoni — 0.09 % (Maltese)
    3 July 2022
    0 references
    O objeto do projeto é a revitalização de Os.Starówka em Gm.Golina, em resultado da qual estão planeadas as duas tarefas mais prioritárias incluídas no Programa de Regeneração Local (LPR) do Município para os anos 2017-2023, a saber: 1.Atribuição de uma nova função ao edifício após o antigo restaurante Smakosz' – o âmbito das obras inclui a conversão, ampliação e mudança de utilização do edifício de serviços para um edifício de utilidade pública destinado a serviços sociais, educativos e culturais relacionados com a satisfação das necessidades coletivas das comunidades. 5 372 292,40 PLN (despesas elegíveis: 4 413 713,51 PLN), incluindo:-financiamento do FEDER: 3 750 088,23 PLN contribuição própria: 661 780,28 złIndicadores de produtos previstos para 2020:Área das zonas sujeitas a revitalização – 9,26 haNúmero de instalações adaptadas às necessidades das pessoas com deficiência – 1,0 unidades. Número de infraestruturas apoiadas localizadas em zonas revitalizadas – 1,0 peças. Espaço aberto criado ou reabilitado em zonas urbanas – 92199,00 m2Parte do projeto na área abrangida pelo programa de revitalização – 0,09 % (Portuguese)
    3 July 2022
    0 references
    Hankkeen aiheena on Os.Starówkan elvyttäminen Gm.Golinassa, minkä seurauksena kunnan paikalliseen elvyttämisohjelmaan (LPR) vuosiksi 2017–2023 on suunniteltu kaksi tärkeintä tehtävää: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 zlotya (tukikelpoiset menot: 4 413 713,51 zlotya, mukaan lukien:- EAKR:n yhteisrahoitus: 3 750 088,23 Puolan zlotya oma rahoitusosuus: 661 780,28 zł Tuoteindikaattorit, jotka on tarkoitus saavuttaa vuonna 2020: elvytyksen piiriin kuuluvien alueiden pinta-ala – 9,26 haVammaisten tarpeisiin mukautettujen tilojen määrä – 1,0 kpl. Tuettujen infrastruktuurien määrä elvytetyillä alueilla – 1,0 kpl. Kaupunkialueilla luotu tai kunnostettu avoin tila – 92199,00 m2Projektin osuus elvyttämisohjelma-alueelle – 0,09 % (Finnish)
    3 July 2022
    0 references
    Predmet projekta je revitalizacija Os.Starówke v Gm.Golini, zaradi česar sta načrtovani dve prednostni nalogi, vključeni v program lokalne revitalizacije (LPR) občine za obdobje 2017–2023: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (upravičeni odhodki: 4 413 713,51) PLN, vključno s:- sofinanciranjem iz ESRR: 3 750 088.23 lastni prispevek v PLN: 661 780,28 złProduct Kazalniki, ki naj bi bili doseženi v 2020:Področje področij, ki jih zajema revitalizacija – 9,26 haŠtevilo objektov, prilagojenih potrebam invalidov – 1,0 kosov. Število podprtih infrastrukturnih objektov na oživljenih območjih – 1,0 kosov. Odprt prostor, ustvarjen ali obnovljen na urbanih območjih – 92199,00 m2Delež projekta za območje programa oživitve – 0,09 % (Slovenian)
    3 July 2022
    0 references
    Předmětem projektu je revitalizace Os.Starówky v Gm.Golina, v jejímž důsledku jsou naplánovány dva prioritní úkoly zahrnuté do místního programu revitalizace (LPR) obce na období 2017–2023: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (způsobilé výdaje: 4 413 713.51 PLN, včetně:- spolufinancování z EFRR: 3 750 088.23 PLN vlastní příspěvek: 661 780,28 złUkazatele produktů plánované k dosažení v roce 2020: Oblast oblastí pokrytých revitalizací – 9,26 haPočet zařízení přizpůsobených potřebám osob se zdravotním postižením – 1,0 ks. Počet podporovaných infrastrukturních zařízení v revitalizovaných oblastech – 1,0 ks. Otevřený prostor vytvořený nebo obnovený v městských oblastech – 92199,00 m2Podíl projektu pro revitalizační program – 0,09 % (Czech)
    3 July 2022
    0 references
    Projekto tema – Os.Starówka atgaivinimas Gm.Golina, todėl planuojamos dvi prioritetinės užduotys, įtrauktos į savivaldybės 2017–2023 m. vietos atgaivinimo programą (LPR): 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (tinkamos finansuoti išlaidos: 4 413 713,51 PLN, įskaitant:- bendrą finansavimą iš ERPF: 3 750 088.23 PLN įnašas: 661 780,28 złProduktų rodikliai, kuriuos planuojama pasiekti 2020 m. Remiamų infrastruktūros objektų, esančių atgaivintose vietovėse, skaičius – 1,0 vnt. Atvira erdvė, sukurta arba atkurta miestų teritorijose – 92199,00 m2Projekto dalis atgaivinimo programos teritorijoje – 0,09 % (Lithuanian)
    3 July 2022
    0 references
    Projekta priekšmets ir Os.Starówka atdzīvināšana Gm.Golinā, kā rezultātā tiek plānoti divi prioritārie uzdevumi, kas iekļauti pašvaldības vietējās atdzīvināšanas programmā (LPR) 2017.–2023. gadam: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the PLN 5 372 292,40 (attiecināmie izdevumi: PLN 4 413 713,51), tostarp:- līdzfinansējums no ERAF: 3 750 088,23 PLN pašu ieguldījums: 661 780,28 złProduktu indikatori, kurus plānots sasniegt 2020. gadā: Atjaunojamo platību platība — 9,26 haIekārtu skaits, kas pielāgots cilvēku ar invaliditāti vajadzībām — 1,0 gab. Atbalstīto infrastruktūras objektu skaits, kas atrodas atjaunotās teritorijās — 1,0 gab. Pilsētu teritorijās izveidota vai atjaunota atvērtā telpa — 92199,00 m2Projekta daļa atdzīvināšanas programmas teritorijai — 0,09 % (Latvian)
    3 July 2022
    0 references
    Предмет на проекта е съживяването на Os.Starówka в Gm.Golina, в резултат на което са планирани двете най-приоритетни задачи, включени в програмата за местно съживяване (LPR) на общината за 2017—2023 г.: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 PLN (допустими разходи: 4 413 713.51 PLN), включително:- съфинансиране от ЕФРР: 3 750 088.23 Собствен принос в PLN: 661 780,28 złПродуктови показатели, планирани да бъдат постигнати през 2020 г.: Областта на районите, обхванати от съживяването — 9,26 ха Брой съоръжения, адаптирани към нуждите на хората с увреждания — 1,0 бр. Брой на подпомаганите инфраструктурни съоръжения, разположени в обновени райони — 1,0 бр. Отворено пространство, създадено или възстановено в градските райони — 92199,00 м2 Дял на проекта за площта на програмата за съживяване — 0,09 % (Bulgarian)
    3 July 2022
    0 references
    A projekt tárgya a Gm.Golina-i Os.Starówka újjáélesztése, amelynek eredményeként az önkormányzat 2017–2023-as időszakra vonatkozó Helyi Rehabilitációs Programjában (LPR) szereplő két legfontosabb feladatot tervezik: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292.40 PLN (támogatható kiadások: PLN 4 413 713.51), beleértve:- az ERFA-ból történő társfinanszírozást: 3 750 088.23 PLN saját hozzájárulás: 661 780,28 złTermékmutatók 2020-ban:Az újjáélesztés által érintett területek területe – 9,26 haA fogyatékkal élők igényeihez igazított létesítmények száma – 1,0 db. Az újjáélesztett területeken található támogatott infrastrukturális létesítmények száma – 1,0 db. Városi területeken létrehozott vagy helyreállított nyílt tér – 92199,00 m2A revitalizációs programterületre vonatkozó projektrészesedés – 0,09% (Hungarian)
    3 July 2022
    0 references
    Is é ábhar an tionscadail ná athbheochan Os.Starówka i Gm.Golina, agus mar thoradh air sin tá an dá thasc tosaíochta is mó a áirítear sa Chlár Athbheochana Áitiúil (LPR) den Bardas le haghaidh 2017-2023 beartaithe: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the PLN 5 372 292.40 (caiteachas incháilithe: PLN 4 413 713.51), lena n-áirítear:- cómhaoiniú ó CFRE: 3 750 088.23 Iar-ranníocaíocht féin: 661 780,28 złTáscairí táirge beartaithe a bhaint amach in 2020: Réimse na limistéar a chumhdaítear le hathbheochan — 9.26 haNumber na n-áiseanna atá curtha in oiriúint do riachtanais daoine faoi mhíchumas — 1.0 ríomhaire. Líon na n-áiseanna bonneagair a fhaigheann tacaíocht agus atá lonnaithe i limistéir athbheochana — 1.0 ríomhaire. Spás oscailte a cruthaíodh nó a athchóiríodh i gceantair uirbeacha — 92199,00 m2Sciar tionscadail do limistéar an chláir athbheochana — 0.09 % (Irish)
    3 July 2022
    0 references
    Ämnet för projektet är förnyelsen av Os.Starówka i Gm.Golina, vilket innebär att de två mest prioriterade uppgifterna i kommunens lokala vitaliseringsprogram (LPR) för 2017–2023 planeras: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 zloty (stödberättigande utgifter: 4 413 713,51 zloty, inklusive:- medfinansiering från Eruf: 3 750 088.23 egna bidrag: 661 780,28 złProduktindikatorer som planeras att uppnås 2020: Område med områden som omfattas av vitalisering – 9,26 haAntal anläggningar anpassade till behoven hos personer med funktionsnedsättning – 1,0 st. Antal infrastrukturanläggningar som får stöd i vitaliserade områden – 1,0 st. Öppet utrymme som skapats eller restaurerats i stadsområden – 92199,00 m2Projektandel för revitaliseringsprogramområdet – 0,09 % (Swedish)
    3 July 2022
    0 references
    Projekti teemaks on Os.Starówka taaselustamine Gm.Golinas, mille tulemusena on kavandatud kaks kõige prioriteetsemat ülesannet, mis sisalduvad valla kohalikus taaselustamisprogrammis aastateks 2017–2023: 1.“Giving a new function to the building after the former restaurant Smakosz” — the scope of work includes the reconstruction, extension and change of the use of the service building into a public utility building for social and educational and cultural services related to meeting the collective needs of the communities.The object is in the urban layout entered in the municipal register of monuments.2.“Revitalisation of the historic Municipal Park in Golina” entered in the Register of Monuments on 3 April 1990, under the number A-437/179, will be able to improve the functionality of the public space and to give us a new function of the urban facilities, the improvement of the urban environment and the development of the urban environment, the modernisation of the urbanisation of the area, the modernisation of the urbanisation of the area, the implementation of the urbanisation of the area, the improvement of the urbanisation of the urban area, the improvement of the urbanisation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban environment, the integration of the residents into the area, the rehabilitation of the urban environment, the rehabilitation of the urban environment, the integration of the urban environment, the integration of the residents of the public area, the revitalisation of the revitalised area and the urbanisation of the urban areas, the development of the conditions of the architecture of the monuments, as well as the improvement of the functionalities of the public space, the rehabilitation of the urban area, the improvement of the urbanisation of the urban area, the improvement of the urban environment and the improvement of the safety of the urban area, the improvement of the functionality of the public space, the rehabilitation of the urban area, the improvement of the urban environment and the development of the urban environment, the integration of the development of the urban area, the integration of the urban area, the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public space, the rehabilitation of the urban area, the improvement of the safety of the urban area, and the rehabilitation of the urban environment, the integration of the urban area, and the integration of the public areas, as well as the improvement of the functionality of the public space, the improvement of the functionality of the urban area, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban area, the integration of the public area and the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban environment, the rehabilitation of the urban areas, the integration of the urban area, the integration of the urban areas, the improvement of the functionality of the public area and the revitalisation of the urban facilities, the improvement of the urban environment and the rehabilitation of the urban environment, the rehabilitation of the urban area, the rehabilitation of the urban area, the improvement of the public area and the integration of the urban facilities, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the public space, the rehabilitation of the urban area, the rehabilitation of the urban area, and the rehabilitation of the urban area, as well as the improvement of the functionality of the public area, the rehabilitation of the urban area, the rehabilitation of the urban area and the development of the urban environment, the integration of the urban area, the integration of the urban area, the integration of the public area and the 5 372 292,40 Poola zlotti (abikõlblikud kulud: 4 413 713,51 Poola zlotti, sealhulgas:- kaasrahastamine ERFist: 3 750 088.23 PLN-omapanus: 2020. aastaks kavandatud 661 780,28 złTootmisnäitajad: taaselustamisega hõlmatud valdkondade valdkond – 9,26 ha Puuetega inimeste vajadustele kohandatud rajatiste arv – 1,0 tk. Taaselustatud piirkondades asuvate toetatud taristurajatiste arv – 1,0 tk. Linnapiirkondades loodud või taastatud avatud ruum – 92199,00 m2Projekti osakaal taaselustamisprogrammi piirkonnas – 0,09 % (Estonian)
    3 July 2022
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: koniński
    0 references
    13 December 2023
    0 references

    Identifiers

    RPWP.09.02.01-30-0080/17
    0 references