Revision history of "Improvement of water and sewage management in the City and the Municipality of Piwniczna-Zdrój" (Q85226)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:2322:23, 2 March 2023DG Regio talk contribs 41,814 bytes −128 Changed label, description and/or aliases in ro, lv, da, it, et, ga, sk, lt, cs, de, sv, bg, es, hr, fi, hu, sl, pt, nl, el, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0404:04, 26 July 2022DG Regio talk contribs 39,829 bytes +23,063 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

29 October 2020

14 October 2020

  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,095 bytes +154 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 10,941 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,067 bytes +1,079 Created claim: summary (P836): The project involves both the extension of the existing sewage treatment plant in Piwniczna-Zdrój from 5560 RLM to 8474 RLM, as well as the construction of new sections of sanitary sewage system with a length of 4.93 km, resulting in a connection of 380 RLM., translated_summary
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 9,988 bytes −613 Removed claim: summary (P836): The project involves both the extension of the existing sewage treatment plant in Piwniczna-Zdrój with 5560 p.e. to 8474 p.e., as well as the construction of new sections of the sanitary sewage system of 4.93 km long, resulting in 380 p.e., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 9,314 bytes +613 Created claim: summary (P836): The project involves both the extension of the existing sewage treatment plant in Piwniczna-Zdrój with 5560 p.e. to 8474 p.e., as well as the construction of new sections of the sanitary sewage system of 4.93 km long, resulting in 380 p.e., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020