Revision history of "Modernisation and reconstruction of the existing water supply network and the construction of sanitary sewerage with connections in the municipality of Chełm Śląski." (Q124202)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0420:04, 2 March 2023DG Regio talk contribs 62,118 bytes +18 Changed label, description and/or aliases in sk, da, it, lv, ga, fi, fr, et, ro, cs, sl, sv, el, hr, lt, pt, es, nl, hu, de, bg, mt, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 20:1020:10, 2 July 2022DG Regio talk contribs 60,429 bytes +36,778 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:2208:22, 2 December 2021DG Regio talk contribs 15,363 bytes +1,936 Created claim: summary (P836): L’objectif du projet est de reconstruire le réseau d’approvisionnement en eau dans l’UE. Spring, Wieniawski, Rock, Romera, Zapłocie, Equal, ainsi que la construction d’un nouveau système d’assainissement ul. Kolberg et Kolberg-side à Chełm Śląski, qui contribueront directement à: — ordonner la gestion de l’eau et des eaux usées dans la municipalité facilitera et améliorera le niveau de vie de la population — protéger l’environnement et éliminer...
  • curprev 08:2208:22, 2 December 2021DG Regio talk contribs 13,427 bytes +260 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:2812:28, 21 October 2020DG Regio talk contribs 13,606 bytes +228 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2812:28, 21 October 2020DG Regio talk contribs 13,378 bytes −228 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2812:28, 21 October 2020DG Regio talk contribs 13,606 bytes +1,774 Created claim: summary (P836): The aim of the project is to rebuild water supply networks in a street. Spring, Wieniawski, Rock, Romera, Zaplotte, Equal, as well as the construction of a new sanitary sewage system ul. Kolberg and Kolberg-side in Chełm Silesia, which will contribute directly to: — ordering water and sewage management in the commune – facilitates and improves the standard of living of residents – environmental protection and eliminates the risks associated with...
  • curprev 12:2812:28, 21 October 2020DG Regio talk contribs 11,832 bytes −1,234 Removed claim: summary (P836): The aim of the project is to rebuild the water supply networks in ul. Spring, Vienna, rock, Roman, brown, equal, and construction of a new sanitary sewage system. Kolberg and Kolberg in Chełm Śląski, which will directly contribute to: The water — wastewater management in the municipality — will facilitate and improve the standard of living of the inhabitants — environmental protection and the risk of pollution, especially water management. The...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:2110:21, 10 March 2020DG Regio talk contribs 11,358 bytes +1,234 Created claim: summary (P836): The aim of the project is to rebuild the water supply networks in ul. Spring, Vienna, rock, Roman, brown, equal, and construction of a new sanitary sewage system. Kolberg and Kolberg in Chełm Śląski, which will directly contribute to: The water — wastewater management in the municipality — will facilitate and improve the standard of living of the inhabitants — environmental protection and the risk of pollution, especially water management. The i...

24 February 2020

18 February 2020

31 January 2020

14 January 2020