Revision history of "Construction of sewage treatment plant in Kąclowa with the construction of sanitary sewage system – stage I" (Q112681)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:4120:41, 2 March 2023DG Regio talk contribs 91,273 bytes −11 Changed label, description and/or aliases in cs, lv, fi, pt, sl, da, ro, hr, el, lt, it, sk, hu, nl, sv, fr, de, ga, et, mt, bg, es, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:5112:51, 27 July 2022DG Regio talk contribs 89,167 bytes +58,233 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 17,910 bytes +3,310 Created claim: summary (P836): Le projet consiste en la construction d’une station d’épuration d’une capacité de 750 m³ par jour (Qmax = 960 m³/j) à Kąclowa et d’un réseau d’assainissement d’une longueur de 10,34 km dans l’agglomération de Grybów. Le projet prévoit deux tâches: 1) Construction d’une station d’épuration des eaux usées à Kąclowa; 2) Construction d’un réseau d’assainissement sanitaire avec raccordements à Kąclowa. Les tâches comprennent des activités liées à la...
  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 14,600 bytes +208 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 14,833 bytes +172 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 14,661 bytes −165 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 14,826 bytes +2,920 Created claim: summary (P836): The project consists of the construction of sewage treatment plant with a capacity of 750 m³ sewage per day (Qmax = 960 m³/d) in the village of Kąclowa and sanitary sewage system with a length of 10.34 km in the Grybów agglomeration. The project envisages 2 tasks: 1) Construction of a sewage treatment plant in K±llow; 2) Construction of sanitary sewage system with connections in the city of Kąclow. The tasks include activities related to project...
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 11,906 bytes −2,313 Removed claim: summary (P836): The project consists of the construction of a wastewater treatment plant with a capacity of 750 m³ of sewage per day (Qmax = 960 m³/d) in Kącka and a sanitary sewage system of 10.34 km in length in the agglomeration of Gfish. The project foresees 2 tasks: 1) Construction of a waste water treatment plant in the Kąckie; 2) Construction of a sewerage network with connections in the Kąclowone. Tasks shall include activities related to project and...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0212:02, 9 March 2020DG Regio talk contribs 12,941 bytes +2,313 Created claim: summary (P836): The project consists of the construction of a wastewater treatment plant with a capacity of 750 m³ of sewage per day (Qmax = 960 m³/d) in Kącka and a sanitary sewage system of 10.34 km in length in the agglomeration of Gfish. The project foresees 2 tasks: 1) Construction of a waste water treatment plant in the Kąckie; 2) Construction of a sewerage network with connections in the Kąclowone. Tasks shall include activities related to project and co...

24 February 2020

18 February 2020

31 January 2020

14 January 2020