Thermal modernisation of the SP No. 11 building at ul. Korola 38a in Tarnowskie Góry (Q123848)

From EU Knowledge Graph
Revision as of 17:08, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q123848 in Poland
Language Label Description Also known as
English
Thermal modernisation of the SP No. 11 building at ul. Korola 38a in Tarnowskie Góry
Project Q123848 in Poland

    Statements

    0 references
    1,822,394.44 zloty
    0 references
    437,374.67 Euro
    13 January 2020
    0 references
    2,143,993.45 zloty
    0 references
    514,558.43 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    7 October 2015
    0 references
    15 September 2019
    0 references
    GMINA TARNOWSKIE GÓRY
    0 references
    0 references

    50°27'55.4"N, 18°50'1.0"E
    0 references
    Przedmiotem projektu jest kompleksowa termomodernizacja budynku użyteczności publicznej, którym jest budynek Szkoły Podstawowej nr 11 przy ul. Korola 38a w Tarnowskich Górach. Kompleksowa termomodernizacja będzie polegała na: dociepleniu ścian, dociepleniu cokołu, dociepleniu stropu ostatniej kondygnacji, dociepleniu dachu, izolacji ścian piwnicznych, wykonaniu drenażu opaskowego, montażu instalacji odgromowej, modernizacji instalacji c.o. wraz z włączeniem do sieci miejskiej oraz montażu energooszczędnego oświetlenia LED. Realizacja projektu ma na celu izolację termiczną pomieszczeń oraz poprawę warunków termicznych obiektu, a także podniesienie komfortu użytkowania budynku jak również zmniejszenie zapotrzebowania na energię konieczną do jego ogrzewania. (Polish)
    0 references
    The subject of the project is a comprehensive thermal modernisation of the public utility building, which is the building of Primary School No. 11 at ul. Korola 38a in Tarnowskie Góry. Comprehensive thermomodernisation will consist of: insulation of the walls, warming of the plinth, insulation of the ceiling of the last floor, insulation of the roof, insulation of cellar walls, execution of belt drain, lightning installation, modernisation of the central heating system with integration into the urban network and installation of energy-saving LED lighting. The aim of the project is to thermal insulation of the premises and to improve the thermal conditions of the facility, as well as to increase the comfort of use of the building as well as to reduce the demand for energy necessary for its heating. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.03.01-24-047A/17
    0 references