Lukavice sewer — connection to ČOV Žamberk II (Q59831)

From EU Knowledge Graph
Revision as of 11:07, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Sewage capture from Lukavice and their transfer to the Žamberk II WWTP. In Lukavice there is an existing unconstructed system of unified sewers (originally rain sewers) to which overflows from septic tanks are connected. The sewers of the existing sewers will be caught by new sewers and sectional ČS. All captured waste water will be transported to the main ČS and transferred from it to the existing sewerage of the town of Žamberk and further to...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Lukavice sewer — connection to ČOV Žamberk II
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    31,538,593.8 Czech koruna
    0 references
    1,261,543.75 Euro
    10 January 2020
    0 references
    49,472,304.0 Czech koruna
    0 references
    1,978,892.16 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    17 October 2017
    0 references
    17 July 2019
    0 references
    Vodovody a kanalizace Žamberk, veřejná obchodní společnost
    0 references
    0 references
    0 references

    50°5'11.58"N, 16°29'9.60"E
    0 references
    56401
    0 references
    Podchycení odpadních vod z obce Lukavice a jejich převedení na ČOV Žamberk II. V obci Lukavice je stávající nesoustavný sytém jednotné kanalizace (původně dešťová kanalizace), do které jsou napojeny přepady ze septiků. Stoky stávající kanalizace budou podchyceny novými stokami a sekčními ČS. Veškeré podchycené odpadní vody budou dopraveny do hlavní ČS a z ní převedeny do stávající kanalizace města Žamberk a dále na ČOV Žamberk II. (Czech)
    0 references
    Sewage capture from Lukavice and their transfer to the Žamberk II WWTP. In Lukavice there is an existing unconstructed system of unified sewers (originally rain sewers) to which overflows from septic tanks are connected. The sewers of the existing sewers will be caught by new sewers and sectional ČS. All captured waste water will be transported to the main ČS and transferred from it to the existing sewerage of the town of Žamberk and further to the WWTP Žamberk II. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/15_021/0001209
    0 references