Construction of a section of the G-class road from the intersection of ul. Polish Army from St. Downtown to the design of the Jarocin bypass junction. (Q135184)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a section of the G-class road from the intersection of ul. Polish Army from St. Downtown to the design of the Jarocin bypass junction. |
Project in Poland financed by DG Regio |
Statements
11,931,289.7 zloty
0 references
15,908,386.27 zloty
0 references
75.0 percent
0 references
5 October 2015
0 references
9 November 2018
0 references
GMINA JAROCIN
0 references
Przedmiotem projektu jest budowa drogi gminnej klasy G od skrzyżowania ul. Wojska Polskiego z ul. Śródmiejską o dł. 1830,0 m (0+000 km –1+830 km) w tym 1779,0 m (0+000 km - 1+779 km) kwalifikowanego, o nośności 115kN/oś, z kategorią ruchu KR3, do „węzła Jarocin” w ciągu drogi ekspresowej S11. Na projekt składają się elementy robót: a) budowa drogi o dł. 1830,0 m i szer. 7,0 m (przy łukach i zjazdach do 12,0 m) o nawierzchni bitumicznej, w tym 1779,0 m kwalifikowanego; b) budowa chodników o łącznej dł. 1776,0 m i szer. (1,5 m do 3,5 m) z kostki betonowej; c) budowa dróg rowerowych (długość wspartej infrastruktury rowerowej) o łącznej dł. 1576,0 m i szer. (2,2 m do 2,5 m) o nawierzchni bitumicznej; d) budowa 2 rond (o śr. zew. 31,0 m i szer. pasa ruchu 5,5 m), 1 skrzyżowania zwykłego z drogą gminną; e) montaż balustrad ochronnych: typu U-11a o dł. 245,0 m; f) budowa odwodnienia: kanalizacji deszczowej o dł. 2040,18 m i przydrożnych rowów o dł. 801,0 m g) budowa kanału technologicznego o dł. 1665,0 m; h) budowa 12 przejść dla pieszych; i) budowa 4 zatok autobusowych o głębokości 3,0 m; j) budowa nowego oświetlenia ulicznego (60 punktów świetlnych); k) budowa 2 przepustów (obiektów infrastruktury drogowej) na rowach melioracyjnych przecinających budowaną drogę o łącznej dł. 42,6m oraz 3 przepustów pod zjazdami w ciągu rowów przydrożnych (nie ujęte we wskaźnikach produktu); l) ułożenie opaski drenarskiej (od ul. Glinki do włączenia w S11) o dł. 6.050,3 m; m) montaż 189 nowych znaków i tablic pionowych oraz 14 słupków przeszkodowych; n) budowa 1 muru oporowego o dł. 55,0 m jako zabezpieczenie skarpy nasypu drogi przy stawie; o) przebudowa infrastruktury kolidującej z inwestycją (sieć wodociągowa, kanalizacyjna, gazowa, oświetlenia drogowego; sieć elektroenergetyczna ENERGA, PKP Energetyka; sieć telekomunikacyjna ORANGE). (Polish)
0 references
The object of the project is the construction of a G-class road from the intersection of ul. Polish Army from St. Downtown by long. 1830.0 m (0 + 000 km – 1 + 830 km) of which 1779.0 m (0 + 000 km – 1+ 779 km) qualified, with a load capacity of 115kN/axis, with KR3 traffic category, to the “Jarocin node” within the S11 expressway. The project consists of elements of works: construction of the road by length. 1830.0 m and wide. 7,0 m (for arches and descents up to 12,0 m) with bituminous surface, including 1779,0 m qualified; the construction of pavements with a total length. 1776.0 m and wide. (1.5 m to 3,5 m) of concrete cube; the construction of bicycle roads (length of supported bicycle infrastructure) with a total length. 1576.0 m and wide. (2.2 m to 2,5 m) with bituminous surface; d) construction of 2 roundabouts (w. zw. 31.0 m and wide lane 5.5 m), 1 junction with municipal road; installation of protective balustrades: U-11a type by long. 245,0 m; construction of dehydration: rainwater Sewerage. 2040.18 m and road ditches long. 801.0 m g) construction of the technological canal by length. 1665,0 m; construction of 12 pedestrian crossings; construction of 4 bus bays with a depth of 3,0 m; construction of new street lighting (60 light points); construction of 2 culverts (road infrastructure facilities) on drainage ditches crossing the built road with a total length. 42,6 m and 3 culverts under exits within road ditches (not included in product indicators); L) installation of the drain band (from ul. Clays to be insulated in S11) 6050,3 m; m) mounting 189 new vertical signs and boards and 14 obstruction posts; construction of 1 resistance wall length. 55,0 m as a protection of the embankment of the road at the pond; O) Reconstruction of the infrastructure conflicting with the investment (water, sewage, gas, road lighting; electricity grid ENERGA, PKP Energetyka; telecommunication network ORANGE). (English)
21 October 2020
0 references
Identifiers
RPWP.05.01.02-30-0015/16
0 references