Construction of railway line No. 582 Czarnca – Włoszczowa Płn. (Q127870)

From EU Knowledge Graph
Revision as of 15:27, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of railway line No. 582 Czarnca – Włoszczowa Płn.
Project in Poland financed by DG Regio

    Statements

    0 references
    36,372,932.68 zloty
    0 references
    8,729,503.84 Euro
    13 January 2020
    0 references
    42,791,685.5 zloty
    0 references
    10,270,004.52 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 September 2017
    0 references
    18 September 2020
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Q2515024 (Deleted Item)
    0 references
    Przedmiotowy projekt dotyczy budowy nowej linii kolejowej nr 582 łączącej posterunek odgałęźny Czarnca ze stacją Włoszczowa Północ. Potrzeba wybudowania nowej linii kolejowej wynika z faktu, że obecnie nie ma możliwości wjazdu z linii kolejowej 61- z kierunku Kielc na linię nr 4 (CMK) w kierunku Warszawy i Łodzi, bez zmiany kierunku jazdy. Taka sama sytuacja dotyczy relacji odwrotnej. Planowane przedsięwzięcie obejmować będzie budowę linii kolejowej o łącznej długości 3,252 km (długość nowobudowanego odcinka to 3,204km) wraz z niezbędną infrastrukturą techniczną oraz przebudowę istniejących obiektów inżynieryjnych, SRK, sieci trakcyjnej, elektroenergetyki i telekomunikacji. Linia kolejowa Czarnca – Włoszczowa Północ łącząca linię kolejową nr 61 Kielce – Fosowskie z linią nr 4 CMK Grodzisk Mazowiecki – Zawiercie ma stanowić dodatkowy element spójnego systemu kolejowych połączeń między aglomeracjami miejskimi w Polsce. Koncentrować będzie ruch z wielu kierunków w celu maksymalnego wykorzystania jej zdolności przepustowej. Zakłada się, że będzie ona obsługiwała potoki pasażerów pomiędzy aglomeracjami: Warszawą, Łodzią i Kielcami. (Polish)
    0 references
    This project concerns the construction of a new railway line No. 582 connecting the Czarnca branch station with Włoszczowa Północ station. The need to build a new railway line is due to the fact that there is currently no possibility of entry from the railway line 61 from Kielce to line 4 (CMK) towards Warsaw and Łódź, without changing the direction of the journey. The same is true of the opposite relationship. The planned project will include the construction of a railway line with a total length of 3.252 km (the length of the newly built section is 3.204 km) together with the necessary technical infrastructure and reconstruction of existing engineering facilities, SRK, overhead contact line, electricity and telecommunications. The Czarnca – Włoszczowa Północ railway line connecting the railway line No. 61 Kielce – Fosowskie with line No 4 CMK Grodzisk Mazowiecki – Zawiercie is intended to be an additional element of a coherent rail system of connections between urban agglomerations in Poland. It will concentrate traffic from multiple directions in order to maximise its capacity. It is assumed that it will handle the streams of passengers between agglomerations: Warsaw, Łódź and Kielce. (English)
    21 October 2020
    0 references

    Identifiers

    RPSW.05.02.00-26-0001/17
    0 references