No label defined (Q122698)

From EU Knowledge Graph
Revision as of 10:08, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    3,573,618.6 zloty
    0 references
    857,668.46 Euro
    13 January 2020
    0 references
    4,982,480.39 zloty
    0 references
    1,195,795.29 Euro
    13 January 2020
    0 references
    71.72 percent
    0 references
    1 February 2019
    0 references
    28 February 2021
    0 references
    OTTIMO SYSTEMS SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ SPÓŁKA KOMANDYTOWA
    0 references
    0 references
    Celem projektu jest opracowanie palety preparatów i produktów do napraw i retuszu uszkodzeń na powierzchniach różnego typu materiałów, akcesoriów do ich aplikacji, a także usług dedykowanych. W projekcie będą realizowane badania przemysłowe i prace rozwojowe, które łącznie trwać będą 25 miesięcy, rozpoczną się 1.02.2019r. i trwać będą do 28.02.2021r. W przedsięwzięcie firma zaangażuje 13 pracowników na umowę o pracę i umowę cywilnoprawną, a także podwykonawców. Etapy realizacji projektu: 1. Opracowanie receptur produktów. 2. Opracowanie koncepcji technicznych produktów. 3. Zaprojektowanie i wykonanie produktów. 4. Integracja komponentów i opracowanie prototypów. 5. Badania prototypów produktów w symulowanych warunkach operacyjnych. 6. Optymalizacja prototypów produktów. 7. Weryfikacja produktów w warunkach rzeczywistych. (Polish)
    0 references
    The aim of the project is to develop a range of preparations and products for repair and repair of damages on surfaces of various types of materials, accessories for their applications, as well as dedicated services. The project will carry out industrial research and development, which will last a total of 25 months, will start on 1.02.2019 and will last until 28.02.2021. The company will involve 13 employees on a contract of employment and civil law contract, as well as subcontractors. Stages of project implementation: 1. Development of product recipes. 2. Development of technical concepts of products. 3. Design and manufacture of products. 4. Integration of components and development of prototypes. 5. Testing prototypes of products under simulated operating conditions. 6. Optimisation of product prototypes. 7. Verification of products under real conditions. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.01.02.00-24-0347/18
    0 references