Construction of sanitary sewage system in Kościelec (Q85444)

From EU Knowledge Graph
Revision as of 15:59, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of sanitary sewage system in Kościelec
Project in Poland financed by DG Regio

    Statements

    0 references
    2,992,020.93 zloty
    0 references
    718,085.02 Euro
    13 January 2020
    0 references
    3,520,024.63 zloty
    0 references
    844,805.91 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    29 November 2019
    0 references
    GMINA KOŚCIELEC
    0 references
    0 references
    0 references

    52°10'27.5"N, 18°34'11.3"E
    0 references
    Projekt obejmuje budowę sieci kanalizacji sanitarnej wraz z przykanalikami oraz 3 przepompowni ścieków. Powstanie łącznie 8,55 km sieci kanalizacji sanitarnej, do której przyłączonych zostanie około 780 osób. Budowa sieci kanalizacji sanitarnej w miejscowości Kościelec stanowi jedno zadanie, przy czym zostało ono podzielone na dwa etapy realizacji: - I etap realizowany w 2018 r. i obejmujący prace związane z kolektorem „C” i „B”: -kanalizacja sanitarna grawitacyjna – 2251,9 mb; -rurociąg tłoczny – 1174,5 mb; -przykanaliki kanalizacyjne – 385,6 mb; -2 przepompownie ścieków. -II etap realizowany w 2019 r., obejmujący swym zakresem prace związane z kolektorem „A” -kanalizacja sanitarna grawitacyjna – 4393,4 mb; -rurociąg tłoczny – 727,5 mb; -przykanaliki kanalizacyjne – 1212,4 mb. (Polish)
    0 references
    The project includes the construction of a sanitary sewerage network with sewer pipes and 3 sewage pumping plants. A total of 8.55 km of sanitary sewage system will be built, to which about 780 people will be connected. The construction of a sanitary sewerage network in Kościelec is one task, but it has been divided into two stages of implementation: — The first stage implemented in 2018 and covering the work related to collectors “C” and “B”: —gravity sanitary sewage – 2251.9 mb; —pressure pipe – 1174,5 mb; — sewage pipes – 385,6 mb; —2 sewage pumping stations. —the second stage implemented in 2019, covering its scope of work related to the “A” collector – gravity sanitary sewage – 4393.4 mb; —pressure pipe – 727,5 mb; —channels – 1212.4 mb. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.03.00-00-0199/16
    0 references