Construction of a sewerage network in the village of Kościelec (Q85444)

From EU Knowledge Graph
Revision as of 15:59, 14 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project includes the construction of a sanitary sewerage network with sewer pipes and 3 sewage pumping plants. A total of 8.55 km of sanitary sewage system will be built, to which about 780 people will be connected. The construction of a sanitary sewerage network in Kościelec is one task, but it has been divided into two stages of implementation: — The first stage implemented in 2018 and covering the work related to collectors “C” and “B”: —...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a sewerage network in the village of Kościelec
Project in Poland financed by DG Regio

    Statements

    0 references
    2,992,020.93 zloty
    0 references
    718,085.02 Euro
    13 January 2020
    0 references
    3,520,024.63 zloty
    0 references
    844,805.91 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    29 November 2019
    0 references
    GMINA KOŚCIELEC
    0 references
    0 references
    0 references

    52°10'27.5"N, 18°34'11.3"E
    0 references
    Projekt obejmuje budowę sieci kanalizacji sanitarnej wraz z przykanalikami oraz 3 przepompowni ścieków. Powstanie łącznie 8,55 km sieci kanalizacji sanitarnej, do której przyłączonych zostanie około 780 osób. Budowa sieci kanalizacji sanitarnej w miejscowości Kościelec stanowi jedno zadanie, przy czym zostało ono podzielone na dwa etapy realizacji: - I etap realizowany w 2018 r. i obejmujący prace związane z kolektorem „C” i „B”: -kanalizacja sanitarna grawitacyjna – 2251,9 mb; -rurociąg tłoczny – 1174,5 mb; -przykanaliki kanalizacyjne – 385,6 mb; -2 przepompownie ścieków. -II etap realizowany w 2019 r., obejmujący swym zakresem prace związane z kolektorem „A” -kanalizacja sanitarna grawitacyjna – 4393,4 mb; -rurociąg tłoczny – 727,5 mb; -przykanaliki kanalizacyjne – 1212,4 mb. (Polish)
    0 references
    The project includes the construction of a sanitary sewerage network with sewer pipes and 3 sewage pumping plants. A total of 8.55 km of sanitary sewage system will be built, to which about 780 people will be connected. The construction of a sanitary sewerage network in Kościelec is one task, but it has been divided into two stages of implementation: — The first stage implemented in 2018 and covering the work related to collectors “C” and “B”: —gravity sanitary sewage – 2251.9 mb; —pressure pipe – 1174,5 mb; — sewage pipes – 385,6 mb; —2 sewage pumping stations. —the second stage implemented in 2019, covering its scope of work related to the “A” collector – gravity sanitary sewage – 4393.4 mb; —pressure pipe – 727,5 mb; —channels – 1212.4 mb. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.03.00-00-0199/16
    0 references