Development of wastewater management in the municipality of Solina — construction of a sewage treatment plant and construction of wastewater collection in the Polishki agglomeration (Q118900)

From EU Knowledge Graph
Revision as of 10:54, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of wastewater management in the municipality of Solina — construction of a sewage treatment plant and construction of wastewater collection in the Polishki agglomeration
Project in Poland financed by DG Regio

    Statements

    0 references
    13,598,699.19 zloty
    0 references
    3,263,687.81 Euro
    13 January 2020
    0 references
    19,826,066.8 zloty
    0 references
    4,758,256.03 Euro
    13 January 2020
    0 references
    68.59 percent
    0 references
    9 October 2017
    0 references
    31 December 2020
    0 references
    GMINA SOLINA
    0 references
    0 references
    Celem bezpośrednim projektu jest wzrost liczby ludności korzystającej z systemu odprowadzania i oczyszczania ścieków w Aglomeracji Polańczyk.Do celów ogólnych projektu należą: wzrost jakości życia mieszkańców gminy, poprawa atrakcyjności obszaru dla inwestycji gospodarczych, zmniejszone zanieczyszczenie środowiska naturalnego. Przedmiotem projektu jest budowa oczyszczalni ścieków oraz budowa 21,6 km kanalizacji ściekowej w Aglomeracji Polańczyk. Przedsięwzięcie ma na celu budowę gminnego systemu oczyszczania ścieków dla Aglomeracji Polańczyk wraz z oczyszczalnią ścieków w Berezce, która w wyniku realizacji projektu przejmie ścieki sanitarne z miejscowości Berezka i Polańczyk (gdzie planuje się likwidację istniejącej oczyszczalni ścieków po realizacji przedmiotowego projektu), a docelowo Bereźnica Wyżna i Wola Matiaszowa. Prace związane z realizacją zakresu rzeczowego projektu będą prowadzone w granicach Aglomeracji Polańczyk i Aglomeracji Solina, jednakże efekty realizacji projektu (produkty i rezultaty) będą skierowane wyłącznie do Aglomeracji Polańczyk. W ramach zadania przewiduje się odprowadzenie ścieków sanitarnych z zabudowań w systemie rozdzielczym grawitacyjno-tłocznym do projektowanej oczyszczalni ścieków sanitarnych na działkach o numerach ewidencyjnych: 509, 510 Obr. Berezka o przepustowości 1800m3/d. Trasa kanalizacji usytuowana będzie w podwórzach, placach, drogach, a także w rejonie rowów, jarów i potoku.Zakres przedmiotowego projektu obejmuje: 1. Budowę sieci kanalizacji sanitarnej w Berezce o długości 14 686m.2. Budowę sieci tłocznej w Berezce od przepompowni ścieków S1 na projektowaną oczyszczalnię ścieków (do studni rozprężnej) w Berezce o długości 1110m.3. Budowę oczyszczalni ścieków w Berezce o przepustowości 1800m3/d.4. Budowę sieci kanalizacji sanitarnej z Polańczyka do Berezki (odcinek przechodzący przez Aglomerację Solina) o długości 5 890m. (Polish)
    0 references
    The direct objective of the project is to increase the population using the waste water collection and treatment system in the Polishima Aglomeracja cywilny for the general purpose of: increasing the quality of life of local residents, improving the attractiveness of an area for economic investment, reduced environmental pollution. The object of the project is the construction of a sewage treatment plant and the construction of 21.6 km of wastewater collection in the Polish-based agglomeration. The project is aimed at the construction of a municipal waste water treatment system for the urban waste water treatment system in respect of the wastewater treatment plant in Berezce, which will, as a result of the project, take over the sanitary waste water from the village of Berezko and Polańczyk (where it is planned to decommission the existing sewage treatment plant after the project has been carried out) and, ultimately, Berec University and Wola Matazowa. Work on the material scope of the project will be carried out within the limits of the Polish-based Aglomeracja Solina, but the results of the project (outputs and results) will be directed solely to the Poles of Poles. In the context of the task, sanitary sewage is to be discharged from the premises of the gravity/discharge system to the planned sanitary sewage treatment plant on parcels with reference numbers: 509, 510. A Bereko, with a capacity of 1 800 m³/d. the sewerage route will be located in the yards, squares, roads, ditches, jares and trenches. the scope of the project includes: 1. Construction of a sewerage network in Berezce of 14 686 M.2. Construction of a reciprocating piston network in Berezka from wastewater pumping station S1 to a projected sewage treatment plant (to the expansion wells) in Berezowa of 1 110 M.3. Construction of a wastewater treatment plant in Berezce with a capacity of 1 800 m³/d.4. Construction of a sewerage network from the Polook to the Berezar (section passing through the Solidify Agglomeration Solina) of 5 890 m in length. (English)
    0 references

    Identifiers

    RPPK.04.03.01-18-0012/17
    0 references