Improving the energy efficiency of SM AGROS in Dobrime Month, through the thermal renovation of multi-family residential buildings. (Q132367)

From EU Knowledge Graph
Revision as of 23:18, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of SM AGROS in Dobrime Month, through the thermal renovation of multi-family residential buildings.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,105,314.07 zloty
    0 references
    265,275.3768 Euro
    13 January 2020
    0 references
    1,615,956.25 zloty
    0 references
    387,829.5 Euro
    13 January 2020
    0 references
    68.4 percent
    0 references
    10 May 2016
    0 references
    31 December 2021
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA "AGROS" W DOBRYM MIEŚCIE
    0 references
    0 references

    53°59'12.8"N, 20°23'50.3"E
    0 references
    Zakłada wykonanie w budynkach przy ul. Grudziądzkiej 15 i 17 modernizacji systemu grzewczego (wymianę zaworów termostatycznych, założenie wymienników ciepła), izolacji rurociągów c.w.u., docieplenie ścian zewnętrznych, stropodachów wentylowanych i stropów piwnic (przy Grudziądzkiej 15, dodatkowo wymianę okien drewnianych piwnicznych), a w budynkach przy ul. Łużyckiej 61-71, naprawę izolacji cieplnej rur ciepłowniczych, docieplenie ścian zewnętrznych, stropodachów i stropów piwnic oraz wymianę okien drewnianych (klatek schodowych). Prace obejmują prace budowlane, demontażowe i instalacyjne. Wszelkie elementy objęte projektem uwzględniają obowiązujące przepisy prawne i normy właściwe do prac termomodernizacyjnych. Termomodernizacja budynków, przyczyni się do zmniejszenia energochłonności budynków, zmniejszenia zużycia energii pierwotnej, zmniejszenie kosztów bieżącego utrzymania nieruchomości, a tym samym poprawę jakości życia mieszkańców oraz wzrost poczucia wartości mieszkańców, związany z mieszkaniem w estetycznych, energooszczędnych mieszkaniach. Zgodnie z definicją zawartą w Szczegółowym opisie osi priorytetowej Efektywność energetyczna RPO WiM na lata 2014-2020, „Głęboka kompleksowa modernizacja energetyczna budynku” obejmuje kompleksową termomodernizację, zgodnie z art.2 pkt. 2 ustawy z dnia 21 listopada 2008 r. o wspieraniu termomodernizacji i remontów (Dz.U z 2014r., poz. 712), w wyniku której oszczędność energii wyniesie min. 25%. Osiągnięte oszczędności w zakresie zużycia energii oraz przewidywane efekty ekologiczne wynikają z audytów energetycznych sporządzanych przed rozpoczęciem prac remontowo-budowlanych (ex-ante) oraz po ich zakończeniu (ex-post). Przewidywane inwestycje remontowe wpisują się także w przyjęte przez gminę lokalne strategie i plany gospodarki niskoemisyjnej. (Polish)
    0 references
    It assumes execution in the buildings at ul. Grudziądz 15 and 17 modernisation of the heating system (replacement of thermostatic valves, installation of heat exchangers), pipe insulation for hot water., insulation of external walls, ventilation of ventilated and basement floors (with Grudziądz 15, further replacement of wooden tips) and in buildings at ul. Lusatia 61-71, repair of thermal insulation of district heating pipes, insulation of external walls, costume housing and basement floors and replacement of wooden windows (staircases). The works include construction, dismantling and installation works. All the elements covered by the project shall take into account the applicable legislation and the standards applicable to the thermomodernisation work. Renovation of buildings, reducing the energy intensity of buildings, reducing primary energy consumption, reducing the cost of maintaining real estate, improving the quality of life of the population and increasing the feeling of the inhabitants’ sense of living in aesthetic, energy-efficient housing. As defined in the Detailed description of the priority axis of the Priority axis of the energy efficiency of the ROP WiM for the period 2014-2020, “The Comprehensive Energy Modernisation of the Building” includes a comprehensive thermal modernisation in accordance with Article 2 (a). 2 Act of 21 November 2008 on support for thermal modernisation and renovation (OJ 2014, item 712), which will lead to energy savings of at least 25 %. The energy savings achieved and the expected environmental effects are the result of energy audits drawn up before and after the works to be carried out (ex-post). Projected renovation investments are also part of the local strategies and low-carbon plans adopted by the municipality. (English)
    0 references

    Identifiers

    RPWM.04.03.02-28-0020/19
    0 references