DEVELOPMENT OF PROVINCIAL ROAD NO 715 — UL. BRZEZIŃSKA IN KOLUSZKI (Q101700)

From EU Knowledge Graph
Revision as of 17:18, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
DEVELOPMENT OF PROVINCIAL ROAD NO 715 — UL. BRZEZIŃSKA IN KOLUSZKI
Project in Poland financed by DG Regio

    Statements

    0 references
    8,791,120.61 zloty
    0 references
    2,109,868.9464 Euro
    13 January 2020
    0 references
    10,342,494.89 zloty
    0 references
    2,482,198.77 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    9 December 2016
    0 references
    31 December 2018
    0 references
    WOJEWÓDZTWO ŁÓDZKIE
    0 references
    0 references

    51°48'2.5"N, 19°44'40.6"E
    0 references

    51°44'40.2"N, 19°49'4.8"E
    0 references
    Realizacja proj. wynika z potrzeby zwiększenia dostępności transportowej województwa łódzkiego w ruchu drogowym. Celem realizacji inwestycji jest: poprawa warunków technicznych, przepustowości i bezpieczeństwa ruchu kołowego (tranzytowego i lokalnego) i pieszego, dostosowanie nośności drogi do wymagań obowiązujących przepisów oraz poprawa warunków ekologicznych. Realizacja inwestycji służyć będzie zarówno mieszkańcom, którzy w celach zawodowych lub rekreacyjnych korzystają z niej, jak i osobom, przybywającym spoza regionu w celach turystycznych bądź biznesowych. Użytkownikami drogi są także przewoźnicy, kierowcy zawodowi, przedsiębiorcy, turyści przejeżdżający DW 715. Zakres inwestycji obejmuje rozbudowę DW 715 w Koluszkach na odcinku od km 5+155 do km 7+401.(2,246km): rozbiórkę i budowę konstrukcji jezdni(rb);rozbudowę i przebudowę skrzyżowań w tym z DW 716 na skrzyżowanie typu rondo wraz z rozbudową DW 716 na odcinku wlotu na rondo(rb);budowę zatok autobusowych (rb); rozbiórkę i budowę chodników (rb);rozbiórkę i budowę zjazdów (rb) budowę zatoki parkingowej (rb); budowę kanalizacji deszczowej i rowów krytych oraz przebudowę rowów (rb);budowę i przebudowę oświetlenia drogowego(rb);przebudowę kanalizacji kablowej i zasilania sygnalizacji świetlnej(rb); przebudowę sieci: elektroenergetycznej, teletechnicznej i wodociągowej(prz.Inf.); przebudowę przyłączy energetycznych i wodociągowych; przebudowę dróg gminnych.(rb). W ramach projektu realizowane będą usługi związane z: opracowaniem SW–firma zewnętrzna; nadzorem inwestorskim- pracownicy ZDW, nadzór autorski- firma zewnętrzna; promocja projektu – wyk. tablic infor/pam.– wykonawca robót budowlanych. W projekcie przyjęta została typowa technologia wykonania robót i odpowiednie rozwiązania konstrukcyjne. Proponowane rozwiązanie projektowe jest optymalne, a zaplanowane wydatki niezbędne do realizacji projektu i osiągnięcia celów. Szczegóły dotyczące parametrów technicznych drogi i rozwiązań technologicznych opisano w SW. (Polish)
    0 references
    The implementation of the project results from the need to increase the transport accessibility of the Łódzkie region in road traffic. The purpose of the investment is to: improving the technical conditions, capacity and safety of traffic (transit and local) and walking, adapting the load capacity to the requirements of the applicable rules and improving ecological conditions. Investments will be made both for residents who use it for professional or leisure purposes and for people coming from outside the region for tourism or business purposes. Road users are also transport operators, professional drivers, entrepreneurs, tourists crossing the DW 715. The investment scope includes the extension of DW 715 in the section from km 5 + 155 to km 7 + 401 (2.246 km): demolition and construction of road construction (rb); the extension and upgrading of intersections, including from the DW 716, to the intersection of the roundabout with the extension of the roundabout 716 to the section of the inlet to the roundabout (rb); construction of bus bays (rb); demolition and construction of pavements (rb); demolition and construction of exits (rb); construction of a car park (rb); construction of storm water and covered ditches and reconstruction of ditches (rb); construction and reconstruction of road lighting (rb); reconstruction of ducts and power supply (rb); upgrading of networks: electrical, telecommunications and water supply (F. (f)); upgrading of energy and water connections; reconstruction of municipal roads (RB). The project will provide services related to: an external company; investment by skimming — the staff of the ZEW, by an external firm; promotion of the project — dashboards infor/pam. — construction contractor. The project adopted a typical technology for the execution of works and appropriate construction solutions. The proposed project solution is optimal and the planned expenses necessary for the realisation of the project and the achievement of the objectives are achieved. Details of the technical parameters of the road and technological solutions are described in the STC. (English)
    0 references

    Identifiers

    RPLD.03.02.01-10-0006/16
    0 references