Construction of production facilities and infrastructure (Q3056698)

From EU Knowledge Graph
Revision as of 09:30, 9 October 2024 by DG Regio (talk | contribs) (‎Set a claim value: summary (P836): The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q3056698 in Latvia
Language Label Description Also known as
English
Construction of production facilities and infrastructure
Project Q3056698 in Latvia

    Statements

    0 references
    476,052.43 Euro
    0 references
    1,057,894.29 Euro
    0 references
    45.0 percent
    0 references
    23 February 2017
    0 references
    22 September 2017
    0 references
    SIA "GLĀZERI BT"
    0 references
    0 references

    56°55'42.31"N, 23°54'39.67"E
    0 references
    Projekta mērķis ir izveidot jaunas SIA "Glāzeri BT" ražošanas telpas un infrastruktūru "Priedēs" Piņķos, Babītes pagasta, Babītes novadā.Komersants darbojas lokšņu stikla formēšanas un apstrādes nozarē, un jaunizveidotā infrastruktūra tiks izmantota, lai uzņēmums paplašinātu savu saimniecisko darbību šajā nozarē, ieviešot efektīvu stikla lokšņu rūdīšanas - apstrādes procesu ar mērķi integrēties globālajās gatavās produkcijas piegāžu ķēdēs.Saskaņā ar apstiprināto būvprojektu tiks veikti šādi būvniecības darbi:Esošo ražošanas telpu pārbūve – 709.1 m2 Jaunu telpu būvniecība – 1795.4 m2, no kurāmRažošanas telpas – 1548.1 m2Administratīvo telpas un veikals – 247.3 m2Ņemot vērā ERAF atbalsta programmas nosacījumus, uzņēmums plāno saņemt līdzfinansējumu esošo ražošanas telpu (709,1 m2) pārbūvei un jauno ražošanas telpu (1548.1 m2) būvniecībai. Kopējā projekta ietvaros plānotā būvdarbu platība –2257.2 m2.Projekta kopējās izmaksas sastāda 1 175 176.97 eiro, no kurām 1 057 894.29.00 eiro ir attiecināmās izmaksas, kuras ir paredzētas jaunās ražošanas ēkas būvniecībai un esošās ražošanas ēkas pārbūvei.ERAF finansējums tiek plānots 45% no attiecināmajām izmaksām 476 052.43 eiro apmērā.Projektā plānotās aktivitātes - būvdarbi ir uzsākti pēc projekta pieteikuma iesniegšanas CFLA š.g. augustā, jo SIA "Glāzeri BT" ir Babītes novada būvvaldē apstiprināts būvprojekts tehniskā projekta stadijā, uzņēmums ir veicis konkursu par būvniecības darbu veikšanu, izvēlējies būvuzņēmēju, ar kuru noslēgts līgums, un saņēmis būvatļauju. Ņemot vērā projekta skaņošanas laiku ar CFLA, tiek plānots, ka līgums ar CFLA par sabiedriskā finansējuma piešķiršanu tiks noslēgts 2017.gada janvārī, tādējādi Projektu tiek plānots realizēt 7 mēnešu laikā pēc līguma noslēgšanas brīža ar CFLA - līdz 2017.gada 31.jūlijam. (Latvian)
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Taking into account the timing of project alignment with CFLA, it is planned that the contract with CFLA on the award of public funding will be concluded in January 2017, thus the Project is planned to be implemented within 7 months after the conclusion of the contract with CFLA – until July 31, 2017. (English)
    15 July 2021
    0.5035666700735948
    0 references
    L’objectif de ce projet est de créer de nouveaux locaux de production et d’infrastructures de «Glasersi BT» Ltd. «Priedes» à Pi’dish, paroisse de Babite, comté de Babite. Le négociant opère dans le domaine du formage et du traitement du verre plat, et l’infrastructure nouvellement créée sera utilisée pour développer son activité économique dans ce secteur en introduisant un processus efficace de trempe et de traitement des tôles de verre dans le but d’intégrer dans les chaînes d’approvisionnement mondiales des produits finis. La superficie totale prévue pour la construction du projet s’élève à 2 257,2 m². Le coût total du projet s’élève à 1 175 176,97 EUR, dont 1 057 894,29 EUR sont des coûts éligibles, qui sont destinés à la construction du nouveau bâtiment de production et à la reconstruction du bâtiment de production existant.Le financement du FEDER est prévu pour 45 % des coûts éligibles de 476 052,43 EUR.Les activités prévues dans le projet — travaux de construction ont commencé après la présentation de la demande de projet à la CFCA en août de cette année, car SIA «Glāzeri BT» est un projet de construction approuvé par le conseil de construction de la municipalité de Babite au stade de la conception technique, la société a procédé à l’attribution d’un permis de construction, avec l’adjudicataire d’un contrat de construction. Compte tenu du calendrier du projet avec CFCA, il est prévu que le contrat avec CFCA pour l’octroi d’un financement public soit conclu en janvier 2017, de sorte que le projet devrait être mis en œuvre dans les 7 mois suivant la conclusion du contrat avec l’ACFC — d’ici le 31 juillet 2017. (French)
    25 November 2021
    0 references
    Ziel des Projekts ist die Schaffung neuer Produktionsstätten und Infrastruktur der „Glasersi BT“ Ltd. „Priedes“ in Piņïi, Pfarrei Babite, Kreis Babite. Der Händler ist im Bereich der Flachglasumformung und -verarbeitung tätig, und die neu geschaffene Infrastruktur wird genutzt, um ihre wirtschaftliche Tätigkeit in diesem Sektor durch die Einführung eines effizienten Prozesses der Glasbleche Temperierung und Verarbeitung zu erweitern, um in die globalen Lieferketten der fertigen Produkte zu integrieren. Die geplante Baufläche des Projekts beträgt insgesamt 2 257,2 m².Die Gesamtkosten des Projekts belaufen sich auf 1 175 176,97 EUR, davon 1 057 894,29,00 EUR förderfähige Kosten, die für den Bau des neuen Produktionsgebäudes und den Wiederaufbau des bestehenden Produktionsgebäudes bestimmt sind.Die EFRE-Finanzierung ist für 45 % der zuschussfähigen Kosten in Höhe von 476 052,43 EUR geplant.Die geplanten Tätigkeiten im Projekt – die Bauarbeiten sind nach Einreichung des Projektantrags bei der CFCA im August dieses Jahres begonnen worden, da die SIA „Glāzeri BT“ ein Bauvorhaben ist, das vom Babite Municipality Construction Board im Stadium der technischen Planung genehmigt wurde, und das Unternehmen hat eine Baugenehmigung abgeschlossen. Unter Berücksichtigung des Zeitplans des Projekts mit der CFCA ist geplant, dass der Vertrag mit der CFCA über die Gewährung öffentlicher Mittel im Januar 2017 abgeschlossen wird, sodass das Projekt innerhalb von 7 Monaten nach Abschluss des Vertrags mit der CFCA bis zum 31. Juli 2017 durchgeführt werden soll. (German)
    28 November 2021
    0 references
    Het project heeft tot doel nieuwe productielocaties en infrastructuur te creëren van „Glasersi BT” Ltd. „Priedes” in de parochie van de Babite, Babite County. De handelaar is actief op het gebied van het vormen en verwerken van vlakglas, en de nieuw gecreëerde infrastructuur zal worden gebruikt om haar economische activiteit in deze sector uit te breiden door een efficiënt proces van glasplaat tempering en verwerking in te voeren met het oog op integratie in de mondiale toeleveringsketens van afgewerkte producten. Volgens het goedgekeurde bouwontwerp zal de volgende bouw worden uitgevoerd: heraanleg van productiefaciliteiten — 709,1 m² Nieuwe gebouwen — 1 795,4 m², waarvan Productiegebouwen — 1548,1 m2Administratieve bouwplaatsen. De totale geplande bouwoppervlakte van het project bedraagt 2 257,2 m².De totale kosten van het project bedragen 1 751 776,97 EUR, waarvan 105 789 249,00 EUR subsidiabele kosten, die bestemd zijn voor de bouw van het nieuwe productiegebouw en de wederopbouw van het bestaande productiegebouw.De EFRO-financiering is gepland voor 45 % van de subsidiabele kosten van 476 052,43 EUR.De geplande activiteiten in het project — de bouwwerkzaamheden zijn begonnen na de indiening van de projectaanvraag bij het CFCA in augustus van dit jaar, omdat SIA „Glāzeri BT” een bouwproject is dat is goedgekeurd door de gemeente Babite in het stadium van het technisch ontwerp, de onderneming heeft een opdracht voor de bouw uitgevoerd en de geselecteerde opdrachtnemer is een opdracht voor de bouw uitgevoerd. Rekening houdend met de timing van het project met het CFCA, is het de bedoeling dat het contract met het CFCA voor de toekenning van overheidsfinanciering in januari 2017 wordt gesloten, zodat het project naar verwachting zal worden uitgevoerd binnen zeven maanden na de sluiting van het contract met het CFCA — uiterlijk op 31 juli 2017. (Dutch)
    28 November 2021
    0 references
    L'obiettivo del progetto è quello di creare nuovi locali di produzione e di infrastruttura della "Glasersi BT" Ltd. "Priedes" a Pi..., parrocchia di Babite, provincia di Babite. Il commerciante opera nel campo della formatura e della lavorazione del vetro piano, e l'infrastruttura di nuova creazione sarà utilizzata per espandere la sua attività economica in questo settore introducendo un efficiente processo di tempra e lavorazione di lastre di vetro con l'obiettivo di integrare nelle catene globali di approvvigionamento dei prodotti finiti. Secondo il progetto di costruzione approvato, verranno effettuati i seguenti lavori di costruzione dei locali esistenti: Ricostruzione di impianti produttivi — 709,1 m² Nuova costruzione — 1 795,4 m², di cui i locali di produzione — 1 548,1 m² di sostegno alla produzione di impianti di costruzione e di costruzione di nuovi impianti di costruzione — 709,1 m² Nuova costruzione — 1 795,4 m², di cuiI locali di produzione — 1 548,1 m² di sostegno alla costruzione di un'area di produzione di 24,1 m² e il nuovo impianto di ristrutturazione — 709,1 m² di costruzione — 1 795,4 m², di cui i locali di produzione — 1 548 m² di sostegno alla costruzione di 24,1 m² e i locali di costruzione di nuova costruzione — 709,1 m² di costruzione di nuovi locali — 1 795,4 m², di cui i locali di produzione — 1 548,1 m² di sostegno dell'azienda per la costruzione di 24,1 m² e i locali di costruzione di nuova costruzione — 709,1 m² di costruzione di nuovi locali — 1 795,4 m², di cui i locali di produzione — 1 548,1 m² di sostegno dell'azienda e dei locali di produzione di 24,1 m² e i locali di costruzione di nuova costruzione. L'area di costruzione totale prevista del progetto è di 2 257,2 m². Il costo totale del progetto è di EUR 1 175 176,97, di cui 1 057 894,9,00 EUR sono costi ammissibili, destinati alla costruzione del nuovo edificio di produzione e alla ricostruzione dell'edificio di produzione esistente.Il finanziamento del FESR è previsto per il 45 % dei costi ammissibili di 476 052,43 EUR. Le attività previste nel progetto — i lavori di costruzione sono iniziati dopo la presentazione della domanda di progetto alla CFCA nell'agosto di quest'anno, poiché SIA "Glāzeri BT" è un progetto di costruzione approvato dal consiglio di costruzione del comune di Babite nella fase del progetto tecnico, l'impresa ha concluso un contratto di costruzione, che ha ricevuto l'appalto per la costruzione, il quale ha ricevuto l'appalto per la costruzione, un progetto di costruzione approvato dal Babite Municipal Construction Board nella fase del progetto tecnico, l'impresa ha ricevuto un appalto per la costruzione, il quale ha ricevuto l'appalto per la costruzione del progetto è di 2 257,2 m². Il costo totale del progetto è di 1 175 176,97 EUR, di cui 1 057 894,29 EUR sono ammissibili, destinati alla costruzione del nuovo edificio e alla ricostruzione dell'edificio esistente. Il finanziamento del FESR è previsto per il 45 % dei costi ammissibili di 476 052,43 EUR. Le attività previste nel progetto — i lavori di costruzione sono iniziati dopo la presentazione della domanda di progetto alla CFCA nell'agosto di quest'anno, poiché SIA "Glāzeri BT" è un progetto di costruzione approvato dal Consiglio edile del comune di Babite nella fase del progetto tecnico, la società ha concluso un contratto per la costruzione, la quale ha ricevuto un contratto per la costruzione, il quale ha ricevuto l'appalto, l'appalto, l'appalto per la costruzione, l'appalto, l'appalto, l'appalto, la costruzione, la costruzione, la costruzione, l'edilizia, la costruzione, la costruzione, l'edilizia, l'informazione e la tutela dei consumatori. Il costo totale del progetto è di 1 175 176,97 EUR, di cui 1 057 894,29,9 EUR ammissibili, destinati alla costruzione del nuovo edificio di produzione e alla ricostruzione dell'edificio esistente.Il finanziamento del FESR è previsto per il 45 % dei costi ammissibili di 476 052,43 EUR. Le attività previste nel progetto — i lavori di Tenendo conto dei tempi del progetto con la CFCA, si prevede che il contratto con la CFCA per la concessione di finanziamenti pubblici sia concluso nel gennaio 2017, pertanto il progetto dovrebbe essere attuato entro 7 mesi dalla conclusione del contratto con la CFCA — entro il 31 luglio 2017. (Italian)
    11 January 2022
    0 references
    El objetivo del proyecto es la creación de nuevas instalaciones de producción e infraestructura de «Glasersi BT» Ltd. «Priedes» en Piài, parroquia de Babite, condado de Babite. El comerciante opera en el campo de la formación y transformación de vidrio plano, y la infraestructura de nueva creación se utilizará para ampliar su actividad económica en este sector mediante la introducción de un proceso eficiente de templado y procesamiento de chapas de vidrio con el objetivo de integrar en las cadenas globales de suministro de productos acabados. De acuerdo con el diseño de construcción aprobado, se llevará a cabo la siguiente construcción: Reconstrucción de instalaciones de producción — 709,1 m² — construcción de nuevos locales — 1 795,4 m², de los cuales 1 548,1 m² de apoyo a la empresa, así como la cuenta de la empresa de apoyo a la empresa. La superficie total de construcción prevista del proyecto es de 2 257,2 m². El coste total del proyecto es de 1 171 776,97 EUR, de los cuales 10 578 949,00 EUR son costes subvencionables, que se destinan a la construcción del nuevo edificio de producción y a la reconstrucción del edificio de producción existente.La financiación del FEDER está prevista para el 45 % de los costes subvencionables de 476 052,43 EUR. Las actividades previstas en el proyecto — las obras de construcción han comenzado después de la presentación de la solicitud del proyecto a la CFCA en agosto de este año, ya que SIA «Glāzeri BT» es un proyecto de construcción aprobado por la Junta de Construcción del Municipio de Babite en la fase del proyecto técnico, a quien se ha adjudicado la empresa, se ha adjudicado una licitación. Teniendo en cuenta el calendario del proyecto con la ACCP, está previsto que el contrato con la ACCP para la concesión de financiación pública se celebre en enero de 2017, por lo que está previsto que el proyecto se ejecute en un plazo de siete meses a partir de la celebración del contrato con la ACCP, a más tardar el 31 de julio de 2017. (Spanish)
    12 January 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Võttes arvesse CFLA-ga vastavusse viimise ajastust, on kavas sõlmida CFLAga avaliku sektori vahendite eraldamise leping 2017. aasta jaanuaris, seega kavatsetakse projekt ellu viia seitsme kuu jooksul pärast CFLAga lepingu sõlmimist – kuni 31. juulini 2017. (Estonian)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Atsižvelgiant į projekto suderinimo su CFLA laiką, planuojama, kad sutartis su CFLA dėl viešojo finansavimo skyrimo bus sudaryta 2017 m. sausio mėn., taigi projektą planuojama įgyvendinti per 7 mėnesius nuo sutarties su CFLA sudarymo – iki 2017 m. liepos 31 d. (Lithuanian)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Uzimajući u obzir vremenski raspored usklađivanja projekta s CFLA-om, planirano je da se ugovor s CFLA-om o dodjeli javnih sredstava sklopi u siječnju 2017., stoga se planira provedba projekta u roku od 7 mjeseci nakon sklapanja ugovora s CFLA-om – do 31. srpnja 2017. (Croatian)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Λαμβάνοντας υπόψη το χρονοδιάγραμμα της ευθυγράμμισης του έργου με το CFLA, προβλέπεται ότι η σύμβαση με το CFLA για τη χορήγηση δημόσιας χρηματοδότησης θα συναφθεί τον Ιανουάριο του 2017, οπότε το έργο προγραμματίζεται να υλοποιηθεί εντός 7 μηνών από τη σύναψη της σύμβασης με το CFLA — έως τις 31 Ιουλίου 2017. (Greek)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Vzhľadom na načasovanie zosúladenia projektu s CFLA sa plánuje, že zmluva s CFLA o udelení verejných finančných prostriedkov sa uzavrie v januári 2017, takže projekt sa má realizovať do 7 mesiacov od uzavretia zmluvy s CFLA – do 31. júla 2017. (Slovak)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. CFLA:n kanssa tehtävän julkisen rahoituksen myöntämistä koskevan sopimuksen on tarkoitus valmistua tammikuussa 2017, joten hanke on tarkoitus toteuttaa seitsemän kuukauden kuluessa CFLA:n kanssa tehdyn sopimuksen tekemisestä 31. heinäkuuta 2017 saakka. (Finnish)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Biorąc pod uwagę harmonogram dostosowania projektu do CFLA, planuje się, że umowa z CFLA dotycząca przyznania finansowania publicznego zostanie zawarta w styczniu 2017 r., w związku z czym projekt ma zostać zrealizowany w ciągu 7 miesięcy od zawarcia umowy z CFLA – do dnia 31 lipca 2017 r. (Polish)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Figyelembe véve a projektek CFLA-val való összehangolásának időzítését, a tervek szerint a CFLA-val a közfinanszírozás odaítéléséről szóló szerződést 2017 januárjában kötik meg, így a projekt végrehajtására a tervek szerint a CFLA-val kötött szerződés megkötését követő 7 hónapon belül – 2017. július 31-ig – kerül sor. (Hungarian)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. S ohledem na načasování sladění projektu s CFLA se plánuje, že smlouva s CFLA o zadání veřejných finančních prostředků bude uzavřena v lednu 2017, takže projekt má být realizován do 7 měsíců od uzavření smlouvy s CFLA – do 31. července 2017. (Czech)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Agus uainiú ailínithe tionscadail le CFLA á chur san áireamh, tá sé beartaithe go dtabharfar an conradh le CFLA maidir le cistiú poiblí a dhámhachtain i gcrích i mí Eanáir 2017, agus dá bhrí sin tá sé beartaithe an Tionscadal a chur chun feidhme laistigh de 7 mí tar éis an conradh le CFLA a thabhairt i gcrích — go dtí Iúil 31, 2017. (Irish)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Ob upoštevanju časovnega okvira usklajevanja projektov s CFLA se načrtuje, da bo pogodba s CFLA o dodelitvi javnih sredstev sklenjena januarja 2017, zato naj bi se projekt izvajal v 7 mesecih po sklenitvi pogodbe s CFLA – do 31. julija 2017. (Slovenian)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Като се вземе предвид графикът за привеждане на проектите в съответствие с CFLA, се планира договорът с CFLA за предоставяне на публично финансиране да бъде сключен през януари 2017 г., поради което се планира проектът да бъде изпълнен в срок от 7 месеца след сключването на договора с CFLA — до 31 юли 2017 г. (Bulgarian)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. B’kont meħud taż-żmien tal-allinjament tal-proġett mas-CFLA, huwa ppjanat li l-kuntratt mas-CFLA dwar l-għoti ta’ finanzjament pubbliku jiġi konkluż f’Jannar 2017, u b’hekk il-Proġett huwa ppjanat li jiġi implimentat fi żmien 7 xhur wara l-konklużjoni tal-kuntratt mas-CFLA — sal-31 ta’ Lulju 2017. (Maltese)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Tendo em conta o calendário do alinhamento do projeto com a CFLA, prevê-se que o contrato com a CFLA relativo à concessão de financiamento público seja celebrado em janeiro de 2017, pelo que se prevê que o projeto seja executado no prazo de sete meses após a celebração do contrato com a CFLA – até 31 de julho de 2017. (Portuguese)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Under hensyntagen til tidsplanen for projekttilpasningen med CFLA er det planlagt, at kontrakten med CFLA om tildeling af offentlig finansiering vil blive indgået i januar 2017, hvorfor projektet efter planen skal gennemføres senest 7 måneder efter indgåelsen af kontrakten med CFLA — indtil den 31. juli 2017. (Danish)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Având în vedere calendarul de aliniere a proiectului la CFLA, se preconizează că contractul cu CFLA privind atribuirea finanțării publice va fi încheiat în ianuarie 2017, astfel încât proiectul este planificat să fie implementat în termen de 7 luni de la încheierea contractului cu CFLA – până la 31 iulie 2017. (Romanian)
    3 August 2022
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Med hänsyn till tidpunkten för projektets anpassning till CFLA planeras att kontraktet med CFLA om tilldelning av offentlig finansiering kommer att ingås i januari 2017, vilket innebär att projektet planeras att genomföras inom sju månader efter det att kontraktet med CFLA har ingåtts – fram till den 31 juli 2017. (Swedish)
    3 August 2022
    0 references
    Priedaines iela 6, Piņķi, Babītes pag., Mārupes nov., LV-2107
    0 references

    Identifiers

    3.1.1.5/16/A/051
    0 references