Construction of a section of a Class G from a junction to ul. The Polish Army, ul. The city centre of the urban bypass of the city of Jarocin. (Q135184)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a section of a Class G from a junction to ul. The Polish Army, ul. The city centre of the urban bypass of the city of Jarocin. |
Project in Poland financed by DG Regio |
Statements
11,931,289.7 zloty
0 references
17,877,970.16 zloty
0 references
75.0 percent
0 references
5 October 2015
0 references
9 November 2018
0 references
GMINA JAROCIN
0 references
Przedmiotem projektu jest budowa drogi gminnej klasy G od skrzyżowania ul. Wojska Polskiego z ul. Śródmiejską o dł. 1830,0 m (0+000 km –1+830 km) w tym 1779,0 m (0+000 km - 1+779 km) kwalifikowanego, o nośności 115kN/oś, z kategorią ruchu KR3, do „węzła Jarocin” w ciągu drogi ekspresowej S11. Na projekt składają się elementy robót: a) budowa drogi o dł. 1830,0 m i szer. 7,0 m (przy łukach i zjazdach do 12,0 m) o nawierzchni bitumicznej, w tym 1779,0 m kwalifikowanego; b) budowa chodników o łącznej dł. 1776,0 m i szer. (1,5 m do 3,5 m) z kostki betonowej; c) budowa dróg rowerowych (długość wspartej infrastruktury rowerowej) o łącznej dł. 1576,0 m i szer. (2,2 m do 2,5 m) o nawierzchni bitumicznej; d) budowa 2 rond (o śr. zew. 31,0 m i szer. pasa ruchu 5,5 m), 1 skrzyżowania zwykłego z drogą gminną; e) montaż balustrad ochronnych: typu U-11a o dł. 245,0 m; f) budowa odwodnienia: kanalizacji deszczowej o dł. 2040,18 m i przydrożnych rowów o dł. 801,0 m g) budowa kanału technologicznego o dł. 1665,0 m; h) budowa 12 przejść dla pieszych; i) budowa 4 zatok autobusowych o głębokości 3,0 m; j) budowa nowego oświetlenia ulicznego (60 punktów świetlnych); k) budowa 2 przepustów (obiektów infrastruktury drogowej) na rowach melioracyjnych przecinających budowaną drogę o łącznej dł. 42,6m oraz 3 przepustów pod zjazdami w ciągu rowów przydrożnych (nie ujęte we wskaźnikach produktu); l) ułożenie opaski drenarskiej (od ul. Glinki do włączenia w S11) o dł. 6.050,3 m; m) montaż 189 nowych znaków i tablic pionowych oraz 14 słupków przeszkodowych; n) budowa 1 muru oporowego o dł. 55,0 m jako zabezpieczenie skarpy nasypu drogi przy stawie; o) przebudowa infrastruktury kolidującej z inwestycją (sieć wodociągowa, kanalizacyjna, gazowa, oświetlenia drogowego; sieć elektroenergetyczna ENERGA, PKP Energetyka; sieć telekomunikacyjna ORANGE). (Polish)
0 references
The project consists of the construction of a municipal road class G from a junction to ul. The Polish Army, ul. Town/town/city/city/town/country 1 830.0 m (0 + 000 km — 1 + 830 km) including 1 779.0 m (0 + 000 km — 1 + 779 km) qualified with a load capacity of 115 kN/axle, with a movement category KR3, to the “Jarocin interchange” over the S11 expressway. The project consists of the following elements of the works: (a) construction of a road. 1 830.0 m and six 7.0 m (at scales and entrances to 12.0 m) of bituminous surfaces, of which 1 779.0 m qualified; construction of walker-rollators with a total length 1 776.0 m and six (1.5 m to 3.5 m) with concrete cubes; (c) construction of cycle roads (length supported by cycle infrastructure) of total length 1 576.0 m and six (2.2 m to 2.5 m) on bituminous surface; construction of 2 roundabout (s) 31.0 m and six movement lane 5.5 m), 1 ordinary junctions with the municipal road; (e) fitting of protective balustrades: of type U-11a with a length of less 245.0 m; (f) construction of drainage: jet-water drains fitted with a length of time 2 040.18 m and roadside ditches with a length of time 801.0 m g) construction of a technological channel. 1 665.0 m; construction of 12 pedestrian crossings; construction of 4 bus bays with a depth of 3.0 m; (j) construction of new street lighting (60 lighting points); (K) construction of 2 culverts (road infrastructure objects) on drainage ditches crossing a constructed road with a total length 42.6 m and 3 culverts at roadside ditches (not included in the product indicators); L) the application of a dress code (from ul. Aluminides, for inclusion in S11) 6 050.3 m; (m) Assembly 189 new signs and vertical plates and 14 bar pillars; (N) construction of 1 wall retaining wall 55.0 m for securing the embankment of the road at the pond; o) rebuilding infrastructure conflicting with the investment (water supply, sewerage, gas, road lighting; ENERGA power network, PKP Energetyka; telecommunication network ORANGE). (English)
0 references
Identifiers
RPWP.05.01.02-30-0015/16
0 references