Modernisation and retrofitting of the rural centre in Loms in order to adapt to modern cultural activities (Q132594)

From EU Knowledge Graph
Revision as of 23:22, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation and retrofitting of the rural centre in Loms in order to adapt to modern cultural activities
Project in Poland financed by DG Regio

    Statements

    0 references
    290,638.52 zloty
    0 references
    69,753.2448 Euro
    13 January 2020
    0 references
    348,918.24 zloty
    0 references
    83,740.37759999999 Euro
    13 January 2020
    0 references
    84.0 percent
    0 references
    19 September 2017
    0 references
    30 November 2018
    0 references
    GMINA SĘPOPOL
    0 references

    54°15'52.9"N, 21°0'52.6"E
    0 references
    Zmodernizowany i doposażony zostanie budynek świetlicy wiejskiej w Liskach (nr budynku 14-3/13;8, Działka nr 3/13, obręb 14 Liski, Gmina Sępopol, pow. bartoszycki), znajdujący się pod opieką merytoryczną M-GOK w Sępopolu. Zakres robót budowlanych w Proj.: • Modernizacja dachu -w tym: remont krokwi (73,6m), wymiana deskowania (410,7m2), wymiana łacenia (410,7m2), nowe obróbki blacharskie i instalacja odgromowa. • Odnowienie stropu -wymiana belek stropowych (17,5 m), wymiana podsufitki (39 m2), odbicie starych i położenie nowych tynków (39 m2). • Przebudowa kominów (4,5m3). • Modernizacja pomieszczeń w budynku – w tym: uzupełnienie tynków (140m2), filcowanie istniejących tynków (457m2), malowanie powierzchni wew.(678m2), malowanie sufitów (285m2), malowanie posadzek z desek (192m2), płytki antypoślizgowe (46m2), drzwi wewnętrzne (18,4m2), remont sceny (22m2), schody drewniane (16 stopni). • Wymiana okien (26,15m2), wymiana drzwi zew. na antywłamaniowe (2 szt.). • Naprawa schodów zewnętrznych, okładziny z płytek antypoślizgowych, balustrady schodowe (19,5m), nawierzchnia przed budynkiem z kostki betonowej (120 m2). • Instalacje –w tym: rurociąg wodociągowy, kanalizacyjny, instalacji C.O., grzejniki stalowe (13 szt.). • Instalacja elektryczna -w tym: przewody kablowe (750 mb), wymiana oświetlenia na LED-owe (63 szt.). Dodatkowo zakupione zostaje nowoczesne trwałe wyposażenie (pełna lista w harmonogramie Proj.). Etapy realizacji Proj.: - etap przygotowawczy - dok. techniczna i Studium Wykonalności, - wyłonienie wykonawcy robót bud. i dostawcy wyposażenia zgodnie z Ustawą PZP, - wykonanie i odbiór robót budowlanych oraz dostawa wyposażenia, - rozliczenie inwestycji. Projekt, poprzez zwiększanie liczby osób korzystających z poszerzonej oferty kulturalnej świetlicy wiejskiej w Liskach, wpisuje się w zawarty w SZOOP dla RPO WiM cel szczegółowy Poddziałania 6.1.2 Więcej ludzi korzystających z oferty instytucji kultury budujących tożsamość regionalną w woj. (Polish)
    0 references
    Modernised and retro-fitting building will be built in the village building in Loms (No 14-3/13; 8, Unit No 3/13, room 14 of Liki, Gmina Sępopol, pow. botoszycki), located under substantive care of M-GOK in Sępopol. Scope of construction work: • Renovation of the roof — including: the renovation of the Storm (73.6 m), the exchange of desking (410.7 m²), the exchange of caulting (410.7 m²), the new blachard and the lightning system. • Renewal of the ceiling — Exchange of ceiling beams (17.5 m), replacement of the underceiling (39 m²), reflection of old and new plaster (39 m²). • Construction of chimneys (4.5 m³). • Modernisation of premises — including: plastering (140 m²), filming of existing plasters (457 m²), painting of the area (678 m²), painting of the area (m²), painting of ceilings (285 m²), painting of floors (192 m²), anti-slip plates (46 m²), interior doors (18.4 m²), renovation of the scene (22 m²), stairs of wood (16 degrees). • Exchange of windows (26.15 m²), replacement of doors at anti-theft (2). • Immovable stairways, linings of anti-slip plates, staircases (19.5 m), pavement ahead of concrete building (120 m²). • Installations — including: water supply, sewerage, installation C.O., steel radiators (13 items). • Electrical installation including: cable cables (750 mb), exchange of lighting on LED-63. In addition, modern durable equipment is purchased (full list in the call schedule). Steps to implement proj.: Preparatory stage — Technical and feasibility studies, — selection of works contractors and equipment suppliers in accordance with the Public Procurement Act, construction works and handing over of construction works and supply of equipment — clearing of investment. The project, by increasing the number of people benefiting from an extended cultural offer of the village centre in Lira, forms part of the specific objective of 6.1.2 for more people making use of a cultural institution building regional identity in the province. (English)
    0 references

    Identifiers

    RPWM.06.01.02-28-0015/17
    0 references