POLENA- AZ.1.2 ENGAGED IN THE PREPARATION, INSTALLATION, MAINTENANCE AND MONITORING OF PLANTS TERMO-IDRAUILCI (Q2034601)
Jump to navigation
Jump to search
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | POLENA- AZ.1.2 ENGAGED IN THE PREPARATION, INSTALLATION, MAINTENANCE AND MONITORING OF PLANTS TERMO-IDRAUILCI |
Project in Italy financed by DG Regio |
Statements
87,552.4 Euro
0 references
87,552.4 Euro
0 references
100.0 percent
0 references
30 November 2016
0 references
15 February 2019
0 references
19 December 2018
0 references
FORMETICA
0 references
IL PERCORSO SI PONE L¿OBIETTIVO DI AVVICINARE LA VECCHIA FIGURA DELL¿IDRAULICO ALLE NUOVE ESIGENZE DEL MERCATO IN QUANTO ESISTONO POCHISSIME FIGURE IN GRADO DI SVILUPPARE IMPIANTISTICA DI GRANDI DIMENSIONI MENTRE I CANTIERI SI STANNO ORMAI DIRIGENDO VERSO LA COSTRUZIONE DI IMBARCAZIONI DI OLTRE 50 METRI PERTANTO HANNO NECESSITà DI MANODOPERA ALTAMENTE SPECIALIZZATA.LA FIGURA IN USCITA SARà IN GRADO DI OPERARE CON CHIAVI DI SOSTENIBILITà AMBIENTALE CONSENTONO NOTEVOLI RISPARMI ENERGETICI E DI ACQUE A BORDO. (Italian)
0 references
THIS MEANS THAT THE AIM OF APPROACHING THE OLD FIGURE IS TO BRING DOWN THE OLD FIGURE OF A PLUMBER TO THE NEW REQUIREMENTS OF THE MARKET, AS THERE ARE VERY FEW FIGURES CAPABLE OF DEVELOPING LARGE SYSTEMS, WHILE THE YARDS ARE NOW MOVING TOWARDS THE CONSTRUCTION OF VESSELS OF MORE THAN 50 METRES, THEREFORE REQUIRING HIGHLY VALUED MANPOWER WILL BE ABLE TO WORK WITH THE ENVIRONMENTAL SUSTAINABILITY KEYS. (English)
0 references
Identifiers
D49D16002350006
0 references