Construction of the S5 express road. New Marzy — Bydgoszcz (Q85936)

From EU Knowledge Graph
Revision as of 10:59, 7 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the S5 express road. New Marzy — Bydgoszcz
Project in Poland financed by DG Regio

    Statements

    0 references
    1,083,417,200.5 zloty
    0 references
    260,020,128.12 Euro
    13 January 2020
    0 references
    2,054,835,270.88 zloty
    0 references
    493,160,465.0112 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references

    53°11'31.9"N, 17°49'31.8"E
    0 references

    53°28'51.2"N, 18°25'36.8"E
    0 references
    Przedsięwzięcie polega na budowie drogi ekspresowej S5 na odc. Nowe Marzy - Bydgoszcz o łącznej dł. 73,84 km, zlokalizowanej w północno–środkowej części Polski i przebiegającej przez obszar województwa kujawsko - pomorskiego. Przedmiotowy odcinek zlokalizowany jest w sieci kompleksowej TEN-T. W wyniku realizacji projektu w 2019 r. zostanie osiągnięty wskaźnik produktu – wybudowanie 73,84 km nowych dróg. Projekt składa się z 4 odcinków (kontraktów): 1: Projekt i budowa drogi ekspresowej S5 na odc. od w. „Nowe Marzy” (bez węzła) do w. „Dworzysko” (z węzłem) o dł. ok. 23,3 km; od km 1+798,08 do km 25+108,48, 2: Projekt i budowa drogi ekspresowej S5 na odc. od w. „Dworzysko” (bez węzła) do w. „Aleksandrowo” (z węzłem) o dł. ok. 22,4 km; od km -0+021,00 do km 22+339,41, 3 - Projekt i budowa drogi ekspresowej S5 na odc. od w. „Aleksandrowo” (z węzłem) do w. „Tryszczyn” (z węzłem) o dł. ok. 14,7 km; od km -0+015,43 do km 14+678,76, 4 - Projekt i budowa drogi ekspresowej S5 na odc. od w. „Tryszczyn” (bez węzła) do w. „Białe Błota” (bez węzła) o dł. ok. 13,5 km; od km 14+678,76 do km 28+151,79. Na całym odcinku drogi S5 przewidziano przekrój 2-jezdniowy z 2 pasami ruchu, z wyjątkiem fragmentu z jezdniami zbierająco-rozprowadzającymi, pasem dzielącym oraz pasem awaryjnym, dostosowany do prognozowanego poziomu ruchu. Założona rezerwa terenowa umożliwia dalszą rozbudowę przekroju drogi do 3 pasów ruchu w każdym kierunku. (Polish)
    0 references
    The project consists of the construction of the S5 express road.New Marzy — Bydgoszcz, with a total length73.84 km, located in the north-central part of Poland and passing through the region of Kujawsko-Pomorskie Province.The section is located in the TEN-T comprehensive network and a product indicator will be reached as a result of the implementation of the project in 2019 — construction of 73.84 km of new roads.The project consists of 4 sections (contracts):1:The project and construction of the S5 express road to the ‘Nowe Marzy’ (no interchange) project from the ‘New Marzy’ to the ‘Experience’ (with interchange) in the region.23.3 km;from km 1 + 798,08 to km 25 + 108,48, 2:The project and construction of the S5 express road to the ‘Dworuo’ (without junction) until W ‘Aleksandrovo’ (with nodal) with a length of approximately22.4 km;from km -0 + 021,00 to km 22 + 339,41, 3 — Project and construction of the S5 expressway from the ‘Aleksandrowo’ (with interchange) to the ‘Tryszczyn’ (with interchange) approximately.14.7 km;from km -0 + 015,43 to km 14 + 678,76, 4 — Project and construction of the S5 express road to the “White Bourse” (without interchange) to the “white blue sky” (without a node) in the region from km to +.13.5 km;from km 14 + 678,76 to km 28 + 151,79.On the whole section of the S5 road, a section of 2-carriageway is foreseen with 2 lanes, with the exception of the passage from road collecting, splitting lanes, and emergency lanes, adjusted to the forecasted traffic.The established field reserve allows for a further extension of the cross section of the road to 3 lanes in each direction. (English)
    0 references

    Identifiers

    POIS.04.01.00-00-0011/17
    0 references