Reconstruction (modernisation) of the water treatment plant in Góra, municipality of Markow (Q105585)

From EU Knowledge Graph
Revision as of 18:37, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction (modernisation) of the water treatment plant in Góra, municipality of Markow
Project in Poland financed by DG Regio

    Statements

    0 references
    765,927.57 zloty
    0 references
    183,822.6168 Euro
    13 January 2020
    0 references
    1,098,503.25 zloty
    0 references
    263,640.77999999997 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 June 2015
    0 references
    15 December 2017
    0 references
    GMINA MARKUSZÓW
    0 references
    Przedmiotem jest przebudowa(modernizacja) budynku SUW w m. Góry wraz z zainstalowaniem nowych urządzeń do przesyłu i uzdatniania wody. Stacja obsługuje 790 mieszkańców, 4 przedsiębiorstwa, 2 bud. użyt. pub. z terenu 4 miejscowości. Budynek jest w b. złym stanie techn. Stare rurociągi ulegają awariom, woda złej jakości. Zakres projektu: *przebudowa i modernizacja budynku SUW(w tym m.in.: wymiana dachu, okien i drzwi, docieplenie, likwidacja kotłowni węglowej- na ogrzewanie elektryczne i adaptacja pomieszczenia na chlorownię), wymiana ogrodzenia, utwardzenie działki; *instalacje sanitarne wew., w tym:-montaż urządzeń technolog. w budynku(m.in.: zestawy: aeracji, filtracyjny, dmuchawy, chloratora, sprężarka, rozdzielnia pneumatyczna i technologiczna, zestaw hydroforowy+pompa płuczna); -węzeł sanitarny; -urządzenia sanit. i dezynfekujące; *instalacje elektr. wew.; *roboty sanitarne zew.:-wymiana części urządzeń zew.(m.in. na studniach, odstojniku); -budowa zbiornika bezodpływowego ścieków z chlorowni; -wymiana części urządzeń na zbiorniku retencyjnym i budowa drugiego zbiornika reten.; przebudowa rurociągów zew.; *przebudwa przyłącza elektroenergetycznego. Nie zmieni się ujęcie wody ani max. ilość pobieranej wody. Woda ze studni kierowana do zestawu aeracji I stopnia. Proces aeracji odbywa się w aeratorze ciśnieniowym. Po napowietrzeniu, woda poddawana procesowi filtracji jednostopniowej w procesie odżelazienia na złożu kwarcowo-katalitycznym. Następnie-retencja w zbiornikach wyrównawczych. Pompowanie wody do sieci wodociągowej-za pomocą zestawu hydroforowego (pompownia II stopnia). Okresowa dezynfekcja-poprzez dozowanie roztworu podchlorynu sodu do wody płynącej do sieci wodociągowej. Stacja wodociągowa w pełni zautomatyzowana. Uruchomiony serwis dla użytkowników do transakcji on-line (możliwość sprawdzenia stanu liczników na wodę, rozliczenia wody, przesyłanie stanu liczników do działu sprzedaży, formularze do wyrażania opinii, uwag, skarg) (Polish)
    0 references
    The subject is a refurbishment of the SUW building in the mountains, with the installation of new equipment for the transmission and treatment of water. The station serves 790 inhabitants, 4 enterprises, 2 budgets, from the city of 4. The building is in a poor condition. Old pipelines are undergoing accidents, poor water quality. Scope of the project: * refurbishment and modernisation of the SUW building (including, but not limited to: roof, window and door exchange, heating, removal of the coal-fired boiler space — for electric heating and conversion of the wall room), replacement of a fence, paving the scale of the plot; * sanitary installations in the field, including the installation of technology in the building (e.g.: sets: aerates, filtration, blowers, chlorrasp, compressor, pneumatic distribution and technology, hydroforme + wash pump); A sanitary node; — sanitation and disinfection equipment; * electrical installations at the vehicle; * sanitary work: — replacement of parts of appliances (e.g. 100 days, departure); Construction of a septic tank; — the replacement of parts of equipment on the retention tank and construction of a second relief tank.; reconstruction of pipelines; * wake of the electricity connection. The water intake will not change and the amount of water abstracted will not change. Water from wells to be used for the 1st step acentralisation set. The eral process is carried out at a pressure aerator. After aeration, water subject to a one-step filtration process in the process of degelatinised into quartz and catalytic deposits. The following retention in the equalisation basins. Pumping water into the water distribution network. Periodical disinfection by dosing an aliquot of the sodium hypochlorite solution to the water flowing into the water supply network. Fully automated water supply station. Online service for users (possibility of checking the state of water meters, water clearance, sending counters to the sales department, forms for expressing opinions, comments, complaints) (English)
    0 references

    Identifiers

    RPLU.06.04.00-06-0007/15
    0 references