Extension of the Primary School in Popzupzu in the area of general education infrastructure (Q132910)

From EU Knowledge Graph
Revision as of 17:21, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension of the Primary School in Popzupzu in the area of general education infrastructure
Project in Poland financed by DG Regio

    Statements

    0 references
    814,882.72 zloty
    0 references
    195,571.8528 Euro
    13 January 2020
    0 references
    3,017,472.9 zloty
    0 references
    724,193.4959999999 Euro
    13 January 2020
    0 references
    82.0 percent
    0 references
    23 May 2017
    0 references
    31 October 2020
    0 references
    GMINA POZEZDRZE
    0 references

    54°8'26.9"N, 21°51'35.3"E
    0 references
    Przedmiotem projektu jest rozbudowa Szkoły Podstawowej w Pozezdrzu. W wyniku realizacji projektu dobudowany zostanie obiekt połączony łącznikiem z istniejącym budynkiem Szkoły. Obiekt będzie dostosowany do potrzeb osób niepełnosprawnych, tak, aby całą oferta edukacyjna była dostępna dla osób z ograniczoną sprawnością ruchową. W rozbudowanym obiekcie szkoły powstaną następujące pomieszczenia: 2 sale bio-chem/mat-fiz, sala ICT, sala językowa, biblioteka, czytelnia, świetlica Projekt realizuje kilka uzupełniających się celów wymagających odrębnych działań. Głównym celem poddziałania 9.3.4 RPO WiM na lata 2014-2020, w ramach którego realizowany będzie projekt jest poprawa warunków edukacji ogólnokształcącej, wspierających umiejętności kluczowe uczniów. Realizacja projektu polegającego na rozbudowie Szkoły Podstawowej w Pozezdrzu przyczyni się do osiągnięcia celu głównego działania. Ze względu na likwidację gimnazjów szacuje się, że nastąpi napływ uczniów uczęszczających obecnie do szkół w innych gminach. Wnioskodawcą projektu jest Gmina Pozezdrze. Za utrzymanie i eksploatację obiektu odpowiedzialny będzie dyrektor SP w Pozezdrzu. Powstały majątek będzie własnością Gminy w trwałym zarządzie Szkoły. Koordynacją projektu zajmować się będą pracownicy UG w Pozezdrzu posiadający doświadczenie w zakresie wdrażania projektów, prac związanych z projektami finansowanymi ze źródeł zewnętrznych, w szczególności w ramach ich kontroli i monitoringu.Prace związane z wdrażaniem projektu wykonywane będą przez pracowników UG w Pozezdrzu w ramach obowiązków służbowych. Etapami w ramach projektu są: - studium wykonalności - prace przygotowawcze, - roboty budowlane; - nadzór inwestorski, - działania promocyjne. (Polish)
    0 references
    The project is the development of a Primary School in Pozzenerze. As a result of the project, the facility will be built in a link with the existing school building. The facility will be adapted to the needs of persons with disabilities so that the entire educational offer is accessible to persons with reduced mobility. The extended establishment will provide the following facilities: 2 bi-chem/mat-fiz rooms, ICT room, language room, library, reading room, excellent project are delivering on several complementary objectives requiring separate action. The main objective of sub-measure 9.3.4 of the 2014-2020 ROP WiM, under which the project will be carried out, is to improve the conditions for general education to support students’ key skills. The implementation of the project of an expansion of the Primary School in Pozzenerze will help to achieve the objective of the main action. Due to lower secondary education it is estimated that there will be an influx of students who currently attend school in other municipalities. The project applicant is the Municipality of Pozezera. The responsibility for the maintenance and operation of the facility will be the responsibility of the Director of the SP in Pozdruz. The resulting assets will be owned by the Municipality on a permanent management of the School. Project coordination will be carried out by UG staff with experience in the implementation of projects, works related to projects financed by external sources, in particular in the framework of their control and monitoring. work on project implementation will be carried out by UG staff in Pozistrz, in the performance of their duties. The project phases are: Feasibility studies — preparatory works, — works; Investor supervision — promotion measures. (English)
    0 references

    Identifiers

    RPWM.09.03.04-28-0023/17
    0 references