Improving the energy efficiency of educational buildings in Twardogóra (Q4426132)

From EU Knowledge Graph
Revision as of 23:22, 27 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q4426132 in Poland
Language Label Description Also known as
English
Improving the energy efficiency of educational buildings in Twardogóra
Project Q4426132 in Poland

    Statements

    0 references
    6,412,676.1 zloty
    0 references
    1,425,537.9 Euro
    0 references
    7,544,324.82 zloty
    0 references
    1,677,103.41 Euro
    0 references
    85.0 percent
    0 references
    11 June 2021
    0 references
    30 June 2023
    0 references
    GMINA TWARDOGÓRA
    0 references

    51°15'17.28"N, 17°30'1.62"E
    0 references
    Realizacja projektu przewiduje wykonanie zadań związanych pracami budowlanymi mającymi na celu termomodernizację budynków Szkoły Podstawowej nr 2 znajdujących w Twardogórze w dwóch różnych lokalizacjach (ul. Św. Jadwigi i ul. Batorego) oraz Szkoły Podstawowej w Goszczu. Łączna liczba uczniów tych placówek: 887. W obiekcie przy ul. Batorego 90,42% pow. wykorzystuje się na cele szkolne, a w pozostałych - 100%. Poprawa efektywności energetycznej dotyczyć będzie łącznie 3 budynków oświatowych będących własnością Gminy Twardogóra. Zakres rzeczowy projektu to głównie ocieplenie ścian, wymianę stolarki drzwiowej i okiennej, modernizację instalacji centralnego ogrzewania i c.w.u., wymianę źródeł światła oraz montaż instalacji PV. Planowane prace termomodernizacyjne spełniają wymagania, które zaczęły obowiązywać od dnia 31 grudnia 2020r. oraz warunek procedury wyboru optymalnego usprawnienia określony w rozporządzeniu Ministra Infrastruktury z dnia 17 marca 2009 r w sprawie szczegółowego zakresu i formy audytu energetycznego oraz części audytu remontowego, wzorów kart audytów, a także algorytmów oceny opłacalności przedsięwzięcia termomodernizacyjnego (Dz.U. 2009 nr 43 poz.346, z późn. zmianami opublikowanymi w Dz.U. 2015 poz.1606, Dz.U. 2020 poz. 879) (SPBTmin). W projekcie uwzględniono również system zarządzania energią i wprowadzony zostanie element edukacyjny - instruktarz użytkowników docelowych projektu. Szczegółowe dane dot. wybranych rozwiązań techn. oraz problemów i sposobów ich rozwiązania przedstawiono w zał. audytach. Realizacja inwestycji w sposób bezpośredni przełoży się na: - zmniejszenie zapotrzebowania na energię końcową, - zmniejszenie strat energii pierwotnej, - dostosowanie obiektów do wymagań w zakresie oszczędności energii i izolacyjności cieplnej do standardów określonych w art. 5 ust. 2a ustawy które obowiązują od grudnia 2020r., - zmniejszenie kosztów pozyskania ciepła, - zmniejszenie kosztów pozyskania energii elektrycznej, - redukcję emisji (Polish)
    0 references
    The implementation of the project provides for the execution of tasks related to construction works aimed at thermomodernising the buildings of the Primary School No. 2 located in Twardogórze in two different locations (ul. It’s St. Jadwiga and ul. Batorego) and the Primary School in Goszcz. Total number of students of these institutions: 887. In the building at ul. Batorego 90.42 % of the above is used for school purposes, and in the rest — 100 %. The improvement of energy efficiency will affect a total of 3 educational buildings owned by the Municipality of Twardogóra. The material scope of the project is mainly wall warming, replacement of door and window joinery, modernisation of central heating and c.w.u. installations, replacement of light sources and installation of PV installations. The planned thermomodernisation works meet the requirements that began to apply from 31 December 2020 and the condition of the procedure for selecting optimal improvement laid down in the Regulation of the Minister of Infrastructure of 17 March 2009 on the detailed scope and form of energy audit and parts of the renovation audit, templates of audit charts, as well as algorithms for assessing the cost-effectiveness of the thermomodernisation project (Journal of Laws 2009 No 43 item 346, as amended in the Journal of Laws of 2015, item 1606, Journal of Laws of 2020 item No. 879) (SPBTmin). The project also includes a system of energy management and will introduce an educational element — the instruction of the target users of the project. Detailed data on selected techn solutions and problems and ways of solving them are presented in the audit. The implementation of the investment will translate directly into: — reduction of final energy demand, — reduction of primary energy losses, — adaptation of facilities to requirements in terms of energy saving and thermal insulation to the standards set out in Article 5 para. 2a Acts which are in force since December 2020, — reduction of costs of obtaining heat, — reduction of costs of obtaining electricity, — reduction of emissions (English)
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: oleśnicki
    0 references

    Identifiers

    RPDS.03.03.01-02-0038/21
    0 references