Thermomodernisation of single-family buildings in Choszczno commune (Q4427295)

From EU Knowledge Graph
Revision as of 22:57, 27 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q4427295 in Poland
Language Label Description Also known as
English
Thermomodernisation of single-family buildings in Choszczno commune
Project Q4427295 in Poland

    Statements

    0 references
    1,507,750.0 zloty
    0 references
    335,172.83 Euro
    0 references
    1,707,750.0 zloty
    0 references
    379,632.83 Euro
    0 references
    88.29 percent
    0 references
    30 June 2021
    0 references
    30 June 2023
    0 references
    GMINA CHOSZCZNO
    0 references

    53°8'35.88"N, 15°39'1.51"E
    0 references
    [ZAKRES RZECZOWY]. Przedmiotowy projekt realizowany będzie w okresie 02.03.2020 - 30.06.2022. Projekt obejmuje swoim zakresem następujące zadania: - zadanie nr 1: Granty na termomodernizację budynków jednorodzinnych - zadanie nr 2: Audyty energetyczne, - zadanie nr 3: Koszty pośrednie. W ramach zadania nr 1 Wnioskodawca przekaże 100 grantów na termomodernizację budynków jednorodzinnych wraz z wymianą indywidualnych źródeł ciepła (starych kotłów, pieców, urządzeń grzewczych oraz realizację przyłączy do sieci ciepłowniczej) na mniej emisyjne na terenie gminy Choszczno. Grantobiorcami będą osoby fizyczne legitymujące się tytułem prawnym do nieruchomości, wynikającym z prawa własności, prawa użytkowania wieczystego, ograniczonego prawa rzeczowego lub stosunku zobowiązaniowego. Sposób realizacji programu grantowego został określony w załączniku nr 21 "Projekt regulaminu przyznawania grantu". W wyniku likwidacji źródeł ciepła opartych o spalanie węgla nastąpi podłączenie do istniejącej sieci ciepłowniczej lub zastąpienie zlikwidowanego źródła ciepła nową jednostką wytwarzania energii cieplnej (w pierwszej kolejności na jednostkę wytwarzającą energię ze spalania gazu. Przeprowadzenie wymiany pieca w ramach projektu będzie możliwe wyłącznie kiedy budynek będzie spełniać minimalne wymogi w zakresie efektywności energetycznej tj. 150kWh/(m2xrok). Grant może dotyczyć wyłącznie budynków, w których nie jest prowadzona działalność gospodarcza. W ramach zadania nr 2 przewidziano wykonanie 115 audytów energetycznych budynków, które zostaną zgłoszone do projektu. [SPOSÓB WDRAŻANIA]. Projekt będzie wdrażany przez Gminę Choszczno. Opis sposobu zarządzania projektem przedstawiono w punkcie 1.3 Planu realizacji projektu. [CHARAKTER I ETAPY PROJEKTU]. Projekt ma charakter stacjonarny i nie jest podzielony na etapy. (Polish)
    0 references
    [SUBSTANTIAL SCOPE]. The project will be implemented in the period 02.03.2020-30.06.2022. The project covers the following tasks: task No 1: Grants for thermal modernisation of single-family buildings — Task No 2: Energy audits, — Task No 3: Indirect costs. As part of task No. 1, the Applicant will provide 100 grants for thermomodernisation of single-family buildings together with the replacement of individual heat sources (old boilers, furnaces, heating devices and the implementation of connections to the heating network) for less emission in the municipality of Choszczno. The grantees will be natural persons with legal title to real estate, resulting from the right of ownership, the right of perpetual usufruct, a limited right in rem or a contractual relationship. The method of implementation of the grant programme is set out in Annex 21 “Draft rules of procedure for awarding the grant”. As a result of the decommissioning of heat sources based on coal combustion, it will be connected to the existing district heating network or replace the decommissioned heat source with a new heat generation unit (primarily the unit generating energy from the combustion of gas. The replacement of the furnace under the project will only be possible if the building meets the minimum energy efficiency requirements, i.e. 150 kWh/(m2xyear). The grant may only apply to buildings in which there is no business activity. Task No 2 provides for 115 energy audits of buildings to be submitted to the project. [THE WAY OF IMPLEMENTATION]. The project will be implemented by the Municipality of Choszczno. A description of how the project is managed is provided in section 1.3 of the Project Implementation Plan. [CHARACTER AND PHASES OF THE PROJECT]. The project is stationary and is not divided into stages. (English)
    0 references
    WOJ.: ZACHODNIOPOMORSKIE, POW.: choszczeński
    0 references

    Identifiers

    RPZP.02.15.00-32-A034/19
    0 references